Английская Википедия:Bridgend railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:More citations needed Шаблон:Infobox station

Bridgend railway station (Шаблон:Lang-cy) is a main line station serving the town of Bridgend, south Wales. It is located approximately halfway between Шаблон:Rws and Шаблон:Rws stations, at the point where the Maesteg Line diverges from the South Wales Main Line; it is also the western terminus of the Vale of Glamorgan Line from Cardiff. It is Шаблон:Convert measured from the zero point at London Paddington, via Stroud.[1]

It is the fifth-busiest station in Wales, after Cardiff Central, Шаблон:Rws, Newport and Swansea.

History

Файл:Bridgend Station, with 0-6-0PT geograph-2959939-by-Ben-Brooksbank.jpg
View from the east end of platforms 2 and 3 in 1962

The station was opened on 18 June 1850, and both the main platform building and the 1877 pedestrian bridge are Grade II listed.[2] The station was designed by Isambard Kingdom Brunel.Шаблон:Citation needed

In 1945, German Field Marshal Gerd von Rundstedt arrived at the station when he was transferred to the Island Farm prisoner of war camp.

Services on both branch lines from the station were withdrawn for a time in the 1960s & early 1970s (trains on the Vale of Glamorgan line fell victim to the Beeching cuts in June 1964, whilst Maesteg trains were withdrawn in July 1970), but because the lines remained in-situ due to coal traffic for the Aberthaw Power Station, each one has since been reopened to passenger services.

Platform 3 was a full length platform running east-to-west until the 1970s when it was removed following the closure of the Maesteg line to passenger traffic. The cafe/waiting area of platform 2 now occupies land where the track used to sit.

Platform 1A was opened in June 2005 by Andrew Davies to act as the terminus for the newly re-opened Vale of Glamorgan Line, with trains now running through to and from Aberdare.

A second, and fully accessible footbridge, was built in 2012 at a cost of £2.4m[3] and the main station ticket hall and entrance was refurbished in 2018 at a cost of £1.5million.[4]

Facilities

Файл:Bridgend railway station footbridge - geograph.org.uk - 3385129.jpg
New fully accessible footbridge which was built in 2012

The station is fully staffed throughout the week, with the ticket office on platform 1 open from early morning until mid-evening. A self-service ticket machine is also provided for use and for the collection of pre-paid tickets. There is a waiting room and photo booth in the main building on platform 1, whist the amenities on platform 2 include toilets and a coffee shop. Train running details are offered via CIS displays, automatic announcements and timetable posters. Step-free access is available to all platforms via lifts in the accessible footbridge at the northern end.[5]

Services

Файл:Pen-y-Bont - GWR 800035+800018.JPG
GWR Шаблон:Brc service to London

Passenger services are operated by Great Western Railway to and from London Paddington and Swansea, with some services extended to Carmarthen; and by Transport for Wales to destinations across Wales.

To the west, Transport for Wales trains run along the South Wales Main Line and West Wales Line to Swansea and then to Carmarthen, Pembroke Dock, Milford Haven or Fishguard Harbour.

Mainline services to Swansea and London run hourly (with extra services at peak hours), whilst the regional trains to Manchester Piccadilly via Шаблон:Rws and local trains to Шаблон:Rws and over the Vale of Glamorgan Line also run hourly; the Swanline local stopping trains to/from Swansea run every two hours.

Шаблон:Rail start Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:Rail line Шаблон:Historical Rail Insert Шаблон:Rail line Шаблон:S-end

Platforms

Файл:Pen-y-Bont - Keolis Amey 143624+142075 trên i Caerdydd Canolog.JPG
Шаблон:Brc in platform 1A
Файл:2019 at Bridgend station - platform 1.JPG
Platform 1
Файл:2019 at Bridgend station - platform 2.JPG
Platform 2
Файл:2019 at Bridgend station - platform 3.JPG
Platform 3

Platforms 1 and 2 are full length platforms used for all long distance services on the South Wales Main Line.

Platform 1A was opened in 2005 and is a bay platform which acts as the terminus for the Vale of Glamorgan Line.

Platform 3 was briefly recommissioned in the early 2000s as an overflow bay platform facing west (it was previously the through outer face of an island platform until removal in the mid-1970s), and was used for services from Шаблон:Stnlnk, although has since fallen into non-use.

Accidents and incidents

  • In December 1965 a fatal collision occurred with a derailed Class 47, D1671, and D6983 travelling to Swansea, as the result of a landslip. The damage was so severe, D6983 was the first EE Type 3 to be withdrawn and as a result, the only locomotive in the entire class not to receive a TOPS number. The wreckage blocked the South Wales mainline and the Vale of Glamorgan line. Trains had to be diverted via the Vale of Neath line until unluckily a landslip blocked that route also. After the lines reopened, the remains of both locomotives were sold to local scrap merchants R.S. Hayes and cut up the following year.[10]
  • On 5 May 2012, a dead body was found on the railway, near the station. The death was treated as unexplained.[11]

References

Шаблон:Reflist

External links

Шаблон:Commons category Шаблон:Stn art lrnk

Шаблон:Cardiff, Newport and the Valleys railway stations Шаблон:Transport in Bridgend county borough Шаблон:Commuter Stations: Cardiff Local Lines run by Arriva Trains Wales Шаблон:South Wales Metro Шаблон:Brunel