Английская Википедия:British Columbia Highway 11

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Use mdy dates Шаблон:More citations needed Шаблон:Infobox road Highway 11, known locally as the Abbotsford-Mission Highway, is a Шаблон:Convert long at-grade expressway (With the southernmost part of the highway two lanes) that figuratively cuts the Fraser Valley in half. The highway was first given the '11' designation in 1958, and it originally followed South Fraser Way through Abbotsford, being re-routed onto the four-lane Sumas Way in the mid-1980s. Highway 11 originally entered Mission over the same bridge that carries a spur of the Canadian Pacific Railway across the Fraser River, but it was re-routed onto its own bridge, the Mission Bridge, in 1973.

Route details

In the south, Highway 11 begins at the Huntingdon Canada–US border crossing, where it connects with Washington State Route 9. The highway goes north for Шаблон:Convert to its junction with Highway 1. North of Highway 1, the route travels Шаблон:Convert north, passing through two interchanges, before arriving at an intersection with Gladys Road. Highway 11 is facing west at this point, so it turns right onto its own dedicated route. Highway 11 from this point proceeds north for Шаблон:Convert. It passes through the community of Matsqui and an interchange into Matsqui's centre, then crosses the Fraser River over the Mission Bridge into Mission, where it terminates at its junction with Highway 7.

History

Highway 11 has been realigned several times since it was first designated in 1958. Until the Mission Bridge was completed in 1973, traffic crossing the Fraser River used a nearby railway bridge.[1] Traffic continued to use Riverside Street until a new alignment and railway overhead was completed in 1979 or 1980.[2] Once the highway crossed the Fraser, the highway turned towards Horne Street, along the present day Horne Street Connector. The current alignment opened in 1984 when a $6.7 million (equivalent to $16.42 million in 2022) route and overpass across the Canadian Pacific tracks opened. [3][4] North from Abbotsford, the highway met Harris Road at a T-intersection and turned westwards, before turning north again at Riverside Street, continuing until it met the Trans-Canada Trail dyke at the Fraser River.[5] Once over the bridge, the highway ran along Harbour Avenue and subsequently northwards along Horne Avenue towards the split Lougheed Highway.[6]

In Abbotsford, both Gladys Avenue and Railway Avenue were both a part of the highway until the present expressway bypass was opened around late 1986 or early 1987.[7][8]

The two interchanges on the north side and the CPR overhead were built after the Mission Bridge.[9] The trumpet interchange leading to Horne Avenue was constructed before the CPR overhead, which was completed around 1984. The interchange with London Avenue was completed in November 1998.[10] In 2013, the project of Highway 11 widening at the south end of the Sumas Border to Vye Road was announced. Construction began in June 2021 which was completed in December 2023. It includes an extension of the Nexus lane to reduce travel times and improve safety.[11][12]

Major intersections

For south to north. The entire route is in the Fraser Valley Regional District. Шаблон:BCinttop Шаблон:Jctint Шаблон:Jctplace Шаблон:BCint Шаблон:BCint Шаблон:BCint Шаблон:BCint Шаблон:BCint Шаблон:BCint Шаблон:Jctbridge Шаблон:BCint Шаблон:BCint Шаблон:BCint Шаблон:Jctbtm

References

Шаблон:Reflist

External links

Шаблон:Attached KML

Шаблон:BCHighways