Английская Википедия:British Rail Class 700

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:EngvarB Шаблон:Good article Шаблон:Use dmy dates Шаблон:Infobox train

Файл:700001 First Class Interior.jpg
The interior of First Class cabin aboard a Thameslink Class 700

The British Rail Class 700 is an electric multiple unit passenger train from the Desiro City family built by Siemens Mobility. It is capable of operating on Шаблон:25 kV 50 Hz from overhead wires or 750 V DC from third rail. 115 trainsets were built between 2014 and 2018, for use on the Thameslink network, as part of the Thameslink Programme in the United Kingdom. Шаблон:As of, they are operated by Govia Thameslink Railway.

In 2011, the consortium Cross London Trains (XLT) consisting of Siemens Project Ventures, 3i Infrastructure, and Innisfree was announced as preferred bidder with Siemens Mobility to manufacture the trains. The decision was politically controversial as the trains were to be built in Germany, while the competing consortium led by Bombardier Transportation had a UK train factory. Both the procurement process and final close of contract were significantly delayed, resulting in the expected first delivery date moving from 2012 to 2016. The £1.6 billion contract to manufacture and provide service depots for the trains was finalised in June 2013. The first train was delivered in late July 2015.

A fleet of 60 eight-car and 55 twelve-car trains[1] entered service between Spring 2016 and 2019. Having replaced Шаблон:Brcs, Шаблон:Brc, and Шаблон:Brc, Class 700s are the only trains operated on the Thameslink network.[2][3] Each train is able to reach 100 mph (160 km/h) and carry 1,146 passengers in an 8-car train, and 1,754 passengers in a 12-car train. Maintenance depots have been built at Hornsey and Three Bridges.

Procurement

Announcement

The Department for Transport began its procurement process (Thameslink Rolling Stock Project, or Thameslink Rolling stock Programme) on 9 April 2008, with the aim of introducing more passenger capacity on Thameslink lines to match expected demand. In addition, the bidders were to provide depots for vehicle maintenance and storage and finance for the rolling-stock project whereby revenues would be generated from the long-term leasing of rolling stock to the train operating company and associated maintenance payments.[4]

The general specifications included: high reliability, short station dwell times, integrated information technology including passenger information and information for vehicle maintenance, a top speed of Шаблон:Convert, and high acceleration and deceleration performance in line with a high-frequency timetable.Шаблон:Refn The trains were to be designed for low weight, low track forces, and high energy efficiency. A standard 12-car train was to be about Шаблон:Convert long and shorter 8-car trains were limited to Шаблон:Convert.[4]

The passenger accommodation was to include versions for both "metro" and "commuter" trains,Шаблон:Refn based around a 2+2 seating arrangement, with fold-up seats and designed for high levels of standing passengers.[4] Ride quality and noise levels were expected to equal or be better than those of current vehicles and climate control (air-conditioning) was to be fitted.[5] The vehicles were to be fitted for driver-only operation, and to include GSM-R communications radio, as well as AWS, TPWS, and ERTMS level 2 safety systems. The ability to be used in 'Automatic train operation' (ATO) mode, where an on-board computer controls the motors and brakes, was also specified.[5]

Vehicles were to operate on 750 V DC and 25 kV AC electrification systems, with regenerative brakes. Maintenance time was to be reduced by the use of modular components, remote diagnostics, and the avoidance of over-complicated systems.[5] The Department for Transport gave a target of Шаблон:Convert when empty for a Шаблон:Convert train.[5]

Bids

In July 2008, the Department for Transport shortlisted consortia including Alstom, Bombardier, Hitachi, and Siemens as train builders.[6] The invitations to tender were issued to the four bidders in November 2008.[7]

Hitachi exited the bidding process in April 2009.[8]

In July 2009, Siemens unveiled the Desiro City, a development of design and technology used in its Desiro UK range and the Desiro Mainline range.[9] Development of the design had begun in 2007, with an investment of about £45 million.[10][11]

In September 2009, Alstom unveiled the X'trapolis UK, unusually an articulated vehicle, using 15.6 metre (51 ft) cars, with individual carriages proposed to be supported at one end by a bogie and at the opposite end by a linkage to the next carriage. The shorter vehicle allowed a slightly wider design; the smaller number of bogies was to have resulted in a train approximately 40 tonnes lighter than a conventional design.[12] However, the design would have resulted in a higher axle load. The bid was rejected in October 2009.[13]

Bombardier Transportation offered the Aventra, a design incorporating a development of the FLEXX Eco inside frame bogie with bogie-mounted traction motors.[14]

Both Bombardier's and Siemens' rolling-stock designs were conventional EMUs incorporating inside frame bogies and modern passenger and rolling stock information systems.[10][9][11][14]

Contract decision and financial close

Файл:Siemens Class 700 mock up.jpg
Full size mock-up of the Class 700 at ExCeL

The contract for the order was originally planned to be signed in Summer 2009, with the first vehicles in service by February 2012, and squadron service by 2015.[4] The award of the contract was delayed by the 2010 general election[15] and the subsequent spending review, following which the procurement was announced to be proceeding in late 2010.[16]

On 16 June 2011, Cross London Trains Ltd, a consortium formed by Siemens Project Ventures GmbH, Innisfree Ltd., and 3i Infrastructure Ltd., was named preferred bidder for the PFI contract, and the targeted entry of trains into service was rescheduled to 2015–2018. The vehicles would be manufactured at Siemens' plant in Krefeld, Germany, and maintenance depots were to be built at Hornsey (London) and Three Bridges (Sussex).[10]

The contract was significantly delayed: initially Siemens had hoped to reach agreement in early 2012;[17] by late 2012 commercial close was hoped for by the end of the year, and financial close in early 2013.[18] Key aspects of the commercial contract were reported to have been finalised by December 2012.[19]

As a result of the delays to the procurement, in late 2012, train operating company Southern began procurement of 116 dual-voltage Шаблон:Brc EMUs from Bombardier that would be used temporarily on the Thameslink route until 2015; the order contract was finalised in July 2013.[19][20][21][22]

In mid-2013 the National Audit Office (NAO) reported that the contract delay could negatively impact the delivery of the entire Thameslink Programme.[23]

The £1.6 billion contract to finance, supply, and maintain a 1,140-carriage fleet of passenger rolling stock was eventually finalised between the DfT, the supplier Siemens, and the Cross London Trains consortium on 14 June 2013.[24][25][26]

To finance the work, loans were arranged with nineteen banks, with Lloyds, Sumitomo Mitsui Banking Corporation, KfW and BTMU acting as mandated lead arrangers; the European Investment Bank also provided a debt facility. Loans for the construction of the rolling-stock depots were through Siemens Financial Services.[27]

Design and manufacturing

Файл:Class 700 powered bogie on 14 road.jpg
Class 700 powered bogie
Файл:Thameslink Class 700 inter-coach sliding doors.jpg
Some walk-through coach gangways on the Class 700 offer manually controlled sliding doors to close off certain parts of the train

Development of the new SF7000 bogie began in 2007, with the intent that it would be the UK-market replacement for the preceding Siemens SGP SF5000 model. To reduce energy consumption and track access charges, a key feature of the design was reduced weight: weight-saving design elements included short wheelbase, inboard frames, a bolsterless bogie design, and hollow axles. Total bogie weight is 6.3 tonnes (powered) and 4.4 tonnes (trailer), a reduction of around one third from the SF5000 design.[28][29]

The primary suspension system uses layered rubber, with pneumatic secondary suspension. Motor bogies have a wheelbase of Шаблон:Convert, while trailer bogies are Шаблон:Cvt shorter. Both variants use wheels of Шаблон:Convert nominal diameter.[30] Braking is by tread brakes and regenerative braking on motor bogies, and two axle-mounted disc brakes per axle on trailer bogies.[28][31]

Prototypes of the new bogie were completed at Siemens' bogie plant in Graz, Austria in late 2011.[32]

Manufacture of pre-series production trainsets began before formal financial close of the project in mid-2013.[33]

A mock-up of the train was unveiled at the ExCel centre in January 2014, and then displayed at various stations in London and the surrounding area.[34][35]

In March 2014, testing of a twelve-car unit began at the Wegberg-Wildenrath Test and Validation Centre;[33] a completed unit was presented by Siemens in Krefeld, Germany in April 2015.[36]

Introduction into service

The first train arrived in the UK by the end of July 2015, and was delivered to the Three Bridges depot.[37] The first test run on the Brighton Main Line took place in December 2015.[38]

The first train in service was unit 700108 forming the 1002 Brighton to London Bridge service on 20 June 2016. By 18 September 2017, Class 700s replaced all Шаблон:Brc, Шаблон:Brc, and Шаблон:Brc units previously in use on the network.[2][3][39] All units were accepted by Thameslink by summer 2018, and by the end of 2019 all were in passenger service.

The Class 700 fleet, at 60 eight-car and 55 twelve-car units, is over double the size of the old Thameslink fleet. This increase has been used not only to enhance capacity, but also to expand the Thameslink network.

On 6 November 2017, Class 700s started on the Great Northern route with the first, 700128, operating the 0656 Peterborough to London Kings Cross service.[40] The Great Northern route has since been partially incorporated in the Thameslink network after through services through the Canal Tunnels began on 26 February 2018.[41] On this route, Class 700s replaced parts of the Шаблон:Brc fleet.

On 11 December 2017, Class 700s took over peak-time services from London Bridge to Littlehampton and weekday-only services from London Bridge to Horsham from Southern with the former starting from Bedford instead of London Bridge.[42][43]

From 21 May 2018, Class 700s also entered service on the new Rainham to Шаблон:Rws service, having replaced the Southeastern Шаблон:Brcs from Gillingham to Шаблон:Rws.[44] The Class 465s are now being used to enhance capacity on other routes.

Class 700s are still due to enter service on a planned new service between Cambridge and Maidstone East but a date for this has not yet been confirmed.[45]

Criticism

Procurement

Because the trains were to be built outside the UK, the decision to award the contract to Siemens proved controversial: there was widespread criticism of the UK government's bidding process and perceived lack of support for British manufacturing,[46][47] which in turn led to a review of governmental procurement mechanisms.[48][49][50][51] Additionally, the decision to procure a train with a new bogie design untested in the UK was challenged by several observers at a parliamentary investigation into the train procurement; rival bidder Bombardier already had a proven low-weight bogie.[52]

In 2014, the NAO reported on the Department for Transport's handling of Intercity Express and Thameslink rolling-stock procurement projects. The report questioned the DfT's attempt to take leadership in the project, contrary to general policy, without any prior experience of large-scale rolling stock procurement; the NAO also said the DfT had handled communications with bidders poorly, increasing the likelihood of a legal challenge to its decisions.[53][54]

Interior design

The Class 700 units have been criticised for having fewer seats than those they replaced.[55] There are 666 seats on the twelve-car versions of the Class 700, compared to 714 on a twelve-car formation of a Thameslink Class 377/5 and 807 on a twelve car formation of a Great Northern Шаблон:Brc. The reduction in the number of seats is intended to provide more standing room on busy trains into Central London, but has been criticised by those who use the trains for longer journeys. There will, however, be more seats overall, as the services will run more frequently.

Additionally, the seats themselves have been criticised for being an uncomfortable shape and having insufficient padding. They are also narrow and positioned close together – another design intended to increase standing space. These poor levels of comfort, along with their tall, thin, tapered appearance, have led them to sometimes be nicknamed "ironing boards";[56] they have also been likened to sitting on concrete.[57]

Thameslink have claimed that the lack of padding was required to meet fire regulations; however, the Rail Safety and Standards Board have claimed that this is untrue, and that it was simply a measure by the DfT to reduce costs.[58]

Upon delivery, the trains were also missing various amenities which were considered standard, including seatback tables and Wi-Fi, which are now being retrofitted to some units.[58] Шаблон:As of, 58% of Class 700/1 (12 coach) and 23% of Class 700/0 (8 coach) are fitted with Wi-Fi with no plans to extend this further across the fleet.[59]

Fleet and formation details

The new fleet were allocated TOPS classification '700' in 2013.[1] This was divided into subclasses 700/0 for eight-car units and 700/1 for twelve-car units.[19]Шаблон:Sfn

The first class compartment at the rear of each unit is declassified at all times.[60][61]

In July 2013 Eversholt Rail entered into an agreement with Cross London Trains to provide long-term (22-year) asset management for the fleet of trains.[62]

There are 60 eight-car units and 55 twelve-car units.Шаблон:Sfn Each is a fixed length continuously gangwayed vehicle.[1] The initial livery is "light grey with pastel blue doors and a white diagonal flash at the carriage ends".[1]

Subclass Operator Qty. Year built Cars per unit Unit nos. Formation & UIC classification
700/0 Thameslink 60 2014–2018 8 700001–700060 Шаблон:Ubl
700/1 55 12 700101–700155 Шаблон:Ubl

Illustrations

Шаблон:Wide image Шаблон:Wide image

Special liveries

As of April 2020, unit 700111, alongside Southern unit 377111 and Great Northern unit 717011, has been wrapped with a special NHS appreciation livery to show support for the NHS and the 200,000 essential commuters travelling on Govia Thameslink Railway's network each week during the nationwide lockdown caused by the COVID-19 pandemic.[63]

Depots

Шаблон:Main articles In 2008, the Department for Transport commissioned a study into the location of depots for the future Thameslink rolling stock: Network Rail preferred two depots based on an expectation that at times the central area of the Thameslink route would be closed for maintenance outside commercial operational hours, with no workable alternative electrified routes available; as a result, depots on either side of the central Thameslink area were required, enabling trains to reach a depot on a nightly basis without passing through central London. A single-depot solution was also investigated, but no suitably large sites were identified for such a facility.Шаблон:Sfn Sites were considered at: Wellingborough;Шаблон:Refn Hornsey;Шаблон:Refn Cricklewood;Шаблон:Refn Selhurst;Шаблон:Refn Three Bridges;Шаблон:Refn and Tonbridge.Шаблон:Sfn By late 2008, the sites had been narrowed to Hornsey, Three Bridges and Tonbridge; finally Hornsey and Three Bridges were selected as a two-depot solution.Шаблон:Sfn

In August 2009, planning applications for both sites were submitted by Arup acting on behalf of Network Rail.Шаблон:SfnШаблон:Sfn However, in December, the Hornsey application was blocked by Secretary of State for Communities and Local Government John Denham on grounds of its scale.[64][65] Potential sites for the northern depot were reassessed and possible options reduced to three: a main depot at Coronation Sidings Hornsey; a main depot adjacent to the existing depot at Hornsey; and a site at Chesterton, Cambridge – a depot reduced in size on the site of the original plan was chosen as the best option for Network Rail.Шаблон:Sfn In 2011 revised plans were submitted for both the Hornsey and Three Bridges schemes, with the Hornsey scheme reduced in size and the Three Bridges scheme expanded.[66] In mid-2013, VolkerFitzpatrick was awarded the approximately £150 million contract to build the two depots.[67][68]

The Three Bridges and the Hornsey depots were officially opened in October 2015 and December 2016 respectively.[69][70]

The Three Bridges depot is located 1.5 km south of Three Bridges railway station on either side of the Brighton Main Line.Шаблон:Refn The Hornsey depot is located on the east side of the East Coast main line near Hornsey railway station, split between the north-east and the south-east of the station and the A504 road (High Street/Turnpike Lane), the latter being adjacent to the pre-existing depot.Шаблон:SfnШаблон:Refn

Accidents and incidents

  • Sixty Thameslink Class 700 and 717 trains failed during disturbances to the National Grid on 9 August 2019 during which the grid frequency fell to 48.914 Hz. Govia Thameslink Railway reported that their Class 700 and Class 717 trains that were operating on AC power were affected by the frequency deviation below 49 Hz. Half were restarted by the drivers but the others required a technician to come out to the train to restart it. Thousands of passengers had their journeys delayed with 371 trains cancelled, 220 part cancelled, and 873 trains delayed. London St Pancras and King's Cross stations had to close for several hours due to overcrowding.[71] Шаблон:PbThe DNOs confirmed that no track supplies were lost due to the DNO's Low Frequency Demand Disconnection (LFDD) protection operation.[72] The problem was identified as the recent "Desiro City" software update from Siemens Mobility. Desiro City is the software that enables the train to operate. Siemens Technical Specification for the train states that the train will continue to operate with supply frequency drops down to 48.5 Hz for short periods of time, but that the train drives are permitted to disconnected at or below 49 Hz. However Siemens also state that all trains should have been recoverable via Battery Reset. Instead a Permanent Lockout on the trains followed the protective shutdown caused by a supply voltage frequency drop. Siemens confirmed this lock out should not have occurred and "This was not the intended behaviour of the train."[73] This permanent lock out was due to the recent software update. The trains where the driver recovered them with a battery restart and thus were not affected by the permanent lock out did not yet have the latest version of the software.Шаблон:CnШаблон:PbTwo large power stations, Hornsea One Ltd (co-owned by Orsted) and Little Barford (operated by RWE) which did not remain connected after the lightning strike have agreed to make a voluntary payment of £4.5 million each into Ofgem's redress fund.[74]
  • On 18 February 2022, during Storm Eunice, unit 700153 collided with a tree obstructing the line at Ifield, West Sussex and was derailed.[75]
  • On 9 June 2023, unit 700042 was derailed at Шаблон:Rws.[76]

See also

Notes

Шаблон:Reflist

References

Шаблон:Reflist

Sources

Further reading

External links

Шаблон:Commons

Шаблон:UK Desiro Шаблон:British Rail EMU

  1. 1,0 1,1 1,2 1,3 Ошибка цитирования Неверный тег <ref>; для сносок PRN не указан текст
  2. 2,0 2,1 Шаблон:Cite web
  3. 3,0 3,1 Шаблон:Cite web
  4. 4,0 4,1 4,2 4,3 Ошибка цитирования Неверный тег <ref>; для сносок dft1 не указан текст
  5. 5,0 5,1 5,2 5,3 Ошибка цитирования Неверный тег <ref>; для сносок tec не указан текст
  6. Ошибка цитирования Неверный тег <ref>; для сносок shortlist не указан текст
  7. Ошибка цитирования Неверный тег <ref>; для сносок itt не указан текст
  8. Ошибка цитирования Неверный тег <ref>; для сносок rgapr2009 не указан текст
  9. 9,0 9,1 9,2 Ошибка цитирования Неверный тег <ref>; для сносок s3 не указан текст
  10. 10,0 10,1 10,2 Ошибка цитирования Неверный тег <ref>; для сносок rgi20110616 не указан текст
  11. 11,0 11,1 Ошибка цитирования Неверный тег <ref>; для сносок s4 не указан текст
  12. Ошибка цитирования Неверный тег <ref>; для сносок rgsep2009 не указан текст
  13. Ошибка цитирования Неверный тег <ref>; для сносок rgoct2009 не указан текст
  14. 14,0 14,1 Ошибка цитирования Неверный тег <ref>; для сносок bom не указан текст
  15. Ошибка цитирования Неверный тег <ref>; для сносок times2010 не указан текст
  16. Ошибка цитирования Неверный тег <ref>; для сносок rnnov2010 не указан текст
  17. Ошибка цитирования Неверный тег <ref>; для сносок guardian3 не указан текст
  18. Ошибка цитирования Неверный тег <ref>; для сносок rtmnov2012 не указан текст
  19. 19,0 19,1 19,2 Ошибка цитирования Неверный тег <ref>; для сносок RAIL135 не указан текст
  20. Ошибка цитирования Неверный тег <ref>; для сносок rndec2012 не указан текст
  21. Ошибка цитирования Неверный тег <ref>; для сносок dftdec2012 не указан текст
  22. Ошибка цитирования Неверный тег <ref>; для сносок rgjul2013 не указан текст
  23. Ошибка цитирования Неверный тег <ref>; для сносок rjjune2013 не указан текст
  24. Ошибка цитирования Неверный тег <ref>; для сносок Barrow не указан текст
  25. Ошибка цитирования Неверный тег <ref>; для сносок closedeal не указан текст
  26. Ошибка цитирования Неверный тег <ref>; для сносок closedeal2 не указан текст
  27. Ошибка цитирования Неверный тег <ref>; для сносок eurw не указан текст
  28. 28,0 28,1 Ошибка цитирования Неверный тег <ref>; для сносок rebog не указан текст
  29. Шаблон:Cite journal
  30. Ошибка цитирования Неверный тег <ref>; для сносок bogie не указан текст
  31. Ошибка цитирования Неверный тег <ref>; для сносок rjmar2012 не указан текст
  32. Ошибка цитирования Неверный тег <ref>; для сносок siemensbogie не указан текст
  33. 33,0 33,1 Шаблон:Cite news
  34. Ошибка цитирования Неверный тег <ref>; для сносок rtm2014 не указан текст
  35. Ошибка цитирования Неверный тег <ref>; для сносок fccfeb2014 не указан текст
  36. Ошибка цитирования Неверный тег <ref>; для сносок rjapr2014 не указан текст
  37. Ошибка цитирования Неверный тег <ref>; для сносок rjjul2015 не указан текст
  38. Ошибка цитирования Неверный тег <ref>; для сносок firstrun не указан текст
  39. Шаблон:Cite web
  40. Шаблон:Cite web
  41. Шаблон:Cite web
  42. Шаблон:Cite web
  43. New timetables available to download here Шаблон:Webarchive (London and East Grinstead, Horsham, Brighton and Littlehampton timetable)
  44. Шаблон:Cite web
  45. Шаблон:Cite web
  46. Ошибка цитирования Неверный тег <ref>; для сносок guardian4 не указан текст
  47. Ошибка цитирования Неверный тег <ref>; для сносок bbcjun2011 не указан текст
  48. Ошибка цитирования Неверный тег <ref>; для сносок rnaug2011 не указан текст
  49. Ошибка цитирования Неверный тег <ref>; для сносок guardian5 не указан текст
  50. Ошибка цитирования Неверный тег <ref>; для сносок stmaug2011 не указан текст
  51. Ошибка цитирования Неверный тег <ref>; для сносок stmjul2011 не указан текст
  52. Ошибка цитирования Неверный тег <ref>; для сносок report2011bogie не указан текст
  53. Ошибка цитирования Неверный тег <ref>; для сносок audit2014 не указан текст
  54. Ошибка цитирования Неверный тег <ref>; для сносок guardian2 не указан текст
  55. Шаблон:Cite web
  56. Train companies claim uncomfortable 'ironing board' seats are due to strict Government regulations Шаблон:Webarchive The Telegraph 18 February 2018
  57. Thameslink passengers left in pain by trains’ ‘concrete’ seats Шаблон:Webarchive The Times 18 February 2018
  58. 58,0 58,1 Шаблон:Cite web
  59. Шаблон:Cite tweet
  60. Шаблон:Cite web
  61. Шаблон:Cite news
  62. Ошибка цитирования Неверный тег <ref>; для сносок mrjul2013 не указан текст
  63. Шаблон:Cite web
  64. Шаблон:Cite news
  65. Шаблон:Cite news
  66. Шаблон:Cite web
  67. Шаблон:Cite news
  68. Шаблон:Cite news
  69. Шаблон:Citation
  70. Шаблон:Cite web
  71. Шаблон:Cite web
  72. Шаблон:Cite web Govia Thameslink Railway in Appendix F "Govia Thameslink Railway (GTR) technical report" of the National Grids ESO report. Шаблон:Cite web
  73. Шаблон:Cite web
  74. Шаблон:Cite web
  75. Шаблон:Cite tweet
  76. Шаблон:Cite tweet