Английская Википедия:Bucharest Metro Line M5

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:M5 Line M5 is the newest of the five lines of the Bucharest Metro, opened on 15 September 2020. In the first phase (Шаблон:Convert), it runs from Eroilor to Râul Doamnei, and to Valea Ialomiței, in the Drumul Taberei neighbourhood.

Файл:Bucharest Metro stationed in Eroilor 2 Station.jpg
Valea Ialomitei bound Metro train stationed at Eroilor

History

In 2011, construction started on the first section of the M5.[1][2] The expected construction cost was €708.6 million.[3] Opened on 15 September 2020, the first section, Râul Doamnei to Eroilor is around Шаблон:Convert long with 10 stations.

After that, the line will be extended to Iancului, and from there under Iancului Road (Șoseaua Iancului) until it reaches the Pantelimon station of M1.

Rolling stock

Until 2023, when new Alstom Metropolis French trains for this line are meant to arrive, 8 Canadian Bombardier Movia 346 train sets are used, redistributed from M3.

Stations

Файл:Metro București.svg
Network Map - 2020
Phase Terminals Length Stations Constructor Construction since Opening
I Râul DoamneiEroilor 6.9 km 9 Astaldi-FCC-AB Construct-Delta ACM April 2011 15 September 2020
RomancierilorValea Ialomiței 1 Max Bögl
II EroilorUniversitate 5.4 km 3 - TBA 2025 (est.)
UniversitateIancului 3 -
III IanculuiPantelimon 3.8 km 6 - On hold 2032 (est.)

Sources: metrorex.ro,[4] adevarul.ro,[5] wall-street.ro[6]

References

Шаблон:Reflist

External links


Шаблон:Bucharest Metro navbox Шаблон:Transport in Bucharest Шаблон:Authority control


Шаблон:Bucharest-metro-stub