Шаблон:M6 Line M6 is an under construction metro line of the Bucharest Metro. The M6 Line will connect Bucharest North railway station (Gara de Nord) to Henri Coandă International Airport (Aeroport Otopeni). The line is expected to be completed by 2027.[1][2] As of 2019, only the section from 1 Mai to Tokyo has secured funding.[3] On March 8, 2022 the contract for construction was signed; he contract for the second section from Tokyo to the airport was signed on May 2, 2023.

Cost

The construction of the new line is estimated to cost around 1.2 billion. The Japan Bank for International Cooperation is financing the project with €300 million.[4]

Stations

The M6 Line will have a total of 16 stations: 4 stations shared with the existing M4 Line and 12 planned new stations: Pajura, Expoziției, Piața Montreal, Gara Băneasa, Aeroport Băneasa, Tokyo, Washington, Paris, Bruxelles, Otopeni, Ion I.C. Brătianu, and Aeroport Otopeni.[2]

Phase Terminals Length Total stations Construction since Opening
I Gara de Nord-1 Mai Шаблон:Convert 4 1989 2000
II 1 Mai - Tokyo Шаблон:Convert 6 2022[5] 2027 (est.)
III Washington - Aeroport Otopeni Шаблон:Convert 6 2023 2027[6] (est.)