Английская Википедия:Buenos Aires Underground rolling stock

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Use British English Шаблон:Short description Шаблон:Use dmy dates

Шаблон:Update

The Buenos Aires Underground has one of the most diverse metro fleets in the world, and has had some of the oldest models in operation on any network. The network began with a relatively standardised fleet, but throughout its over 100-year-long history, it has seen numerous purchases which have created cases where some lines operate numerous models. Recently there have been increased efforts to modernise and standardise the fleets, with large purchases from China CNR Corporation and Alstom.

History

Файл:Flota de Brugeoise en Polvorín.jpg
La Brugeoise cars inside the Polvorín Workshop in 1913.
Файл:Buenos Aires - Subte - Interior coche línea B 1938.jpg
Interior of a Metropolitan-Cammell car on Line B.
Файл:Constitución station.jpg
Siemens-Schuckert Orenstein & Koppel rolling stock at Constitución station on Line C.
Файл:Fiat-Materfer 1978.jpg
Fiat-Materfer cars were the first attempt at standardisation.

Before the nationalisation of the railways and the formation of Subterráneos de Buenos Aires, the original lines of Buenos Aires Underground were built by three private companies, and each bought different rolling stock for their lines.

Line A was inaugurated in 1913 by the Anglo-Argentine Tramways Company (AATC)—then owned by the Belgian company Sofina—who owned the vast majority of the city's tramways at that point. Two companies competed to provide the rolling stock of the line: the Belgian La Brugeoise et Nivelles and British United Electric Car Company, with the Belgian company ultimately winning the contract.[1] However 4 UEC Preston cars had been sent to the country and these more extravagant cars were kept in service on the line until the 1970s and were often used on special occasions.[2] The Brugeoise cars made up the entirety of the rolling stock of the line until 2013, retiring just before their 100-year anniversary.[3]

The Argentine company Lacroze Hermanos built Line B, originally designed to be an underground continuation of the Buenos Aires Central Tramway (today the Urquiza Line). The line has historically been significantly different from the others in terms of rolling stock since it uses third rail electrification instead of overhead lines and as such, it has been the most troublesome to standardise and has often had the most diverse rolling stock, with four different models circulating on its tracks at one point. Originally served by Metropolitan-Cammell cars from its opening in 1930, these were later reinforced by cars from the Osgood Bradley Car Company in the 1950s. Later on, two attempts were made by the state-owned Fabricaciones Militares to replace the rolling stock of the line, however these were never produced in enough numbers to replace all the cars on the line. It was only in 1996 that the line was standardised again when cars were bought second-hand from the Tokyo Metro Marunouchi Line in order to replace all the cars. This was also the first time in the history of the network that cars were bought second-hand.

Lines C, D and E were all built by the Hispanic-Argentine Company for Public Works and Finances (CHADOPyF) in the 1930s and 1940s and were thus the most straightforward. All the lines used German Siemens-Schuckert Orenstein & Koppel rolling stock from their inaugurations, though during the 1960s Spanish-built CAF-General Electrica Española were added to the lines. The CAF-GEE cars were designed to be highly compatible with the Siemens-Schuckert Orenstein & Koppel cars in order to reduce maintenance costs.[4][5][6][7] It was only in the 1980s that the rolling stock started to diversify on these lines when Fiat-Materfer cars began to be introduced in order to standardise all the lines of the network (with the exception of Line B) using this rolling stock, however not enough of these were built to replace the Brugeoise, CAF and Siemens cars, so the ended up being spread thinly and switched between lines as temporary stock since their introduction.[5]

The standardisation across lines was further reduced following privatisation in the 1990s when more attempts were made to replace the ageing Brugeoise and Siemens stocks with second hand purchases from Japan and the incorporation of the new Alstom Metropolis 100 Series rolling stock, none of which were purchased in enough numbers to make up the entirety of a line, let alone multiple lines on the network.[5] Only in 2010s were there moves towards re-standardising and modernising the fleet whilst retiring the ageing trains which had served since the opening of each respective line. Numerous purchases of new rolling stock have been made, along with the purchase of second hand rolling stock which the City Government claims is a necessity given the need to quickly incorporate trains in lines with rolling stock deficits.

Historical Fleet

Model Photo Years active Country Purchased New Cars built/purchased Former Lines
La Brugeoise Файл:La Brugeoise car at Plaza de Mayo.jpg 1913–2013 Шаблон:Flagicon Yes 125 Шаблон:Rint Шаблон:Rint
UEC Preston[8] Файл:Tallerpolverin4.jpg 1913–1977 Шаблон:Flagicon Yes 4 Шаблон:Rint
Metropolitan Cammell Файл:Metropolitan-Cammel-9.jpg 1930–1996 Шаблон:Flagicon Yes 56 Шаблон:Rint
Osgood-Bradley Файл:Buenos Aires A line 150 Old Subway wagon.jpg 1931–1996 Шаблон:Flagicon Yes 20 Шаблон:Rint
Siemens-Schuckert Orenstein & Koppel[9][10] Файл:Línea H, tren en la estación Inclán (Buenos Aires, noviembre 2008).jpg 1934–2016 Шаблон:Flagicon Шаблон:Flagicon[11] Yes 13 + 3 scrapped during construction Шаблон:Rint Шаблон:Rint Шаблон:Rint Шаблон:Rint
Fabricaciones Militares http://busarg.com.ar/fotogaleria/albums/userpics/35995.jpg [12] 1965–1996 Шаблон:Flagicon Yes 14 Шаблон:Rint
Siemens-Fabricaciones Militares[13] 1977–1996 Шаблон:Flagicon Yes 18 Шаблон:Rint
Siemens-Emepa-Alstom[9][14][15][16] Файл:Siemens-Emepa-Alstoms-1.jpg 2014–2017 Шаблон:Flagicon Шаблон:Flagicon Refurbished 50 Шаблон:Rint Шаблон:Rint
CAF 5000[17][18] Файл:Mauricio Macri inauguró dos nuevas estaciones de la línea B de subte (9574398087).jpg 2013–2018 Шаблон:Flagicon No 36 Шаблон:Rint
Nagoya 5000[19][20] Файл:Nagoya-5000-1.jpg 2015–2019 Шаблон:Flagicon No 30 Шаблон:Rint
CAF/General Eléctrica Española[12] Файл:Línea E, andén de la estación Belgrano (Buenos Aires, septiembre 2008) - cropped.jpg 1968–2022 Шаблон:Flagicon no 56 Шаблон:RintШаблон:Rint

Preservation

The original La Brugeoise rolling stock has been maintained, some as exhibits and some being converted to 1500V to run tourist services on the line.[21] In December 2013 a law was passed which meant that the entire La Brugeoise fleet would receive protection status and would thus only be donated to organisations dedicated to their restoration and preservation.[22] The three surviving UEC Preston cars serve on the Buenos Aires Heritage Tramway above-ground in the neighbourhood of Caballito. Two Siemens-Schuckert Orenstein & Koppel also have been donated to the Buenos Aires Heritage Tramway, but the fate of the rest of the fleet is still unclear.[23]

On 1 February 2018, the Buenos Aires Heritage Tramway received a donation from SBASE consisting of a Metropolitan Cammell and a Siemens-Fabricaciones Militares.[24]

Current fleet

Rolling stock of the Buenos Aires Underground Шаблон:As of (may not be current for all models).

Model Photo Years active Country Purchased New Cars built/purchased Cars in operation Former Lines Current Lines
Fiat-Materfer Файл:Subte metro in Buenos Aires, Argentina.png 1980–present Шаблон:Flagicon Yes 105[25] 95
[26]
Шаблон:Rint Шаблон:Rint Шаблон:Rint [27]
Materfer[28][29] Файл:Estación General Savio (4) - cropped.JPG 1988–present Шаблон:Flagicon Yes 17 13 Шаблон:Rint
Eidan 500 series [30] Файл:Unidad de la línea B de subtes de Bs. As. por D2000.JPG 1996–present Шаблон:Flagicon No 128[31] 96[31] Шаблон:Rint
Nagoya 300/700/1200[32] Файл:Nagoya-250-3.jpg 1999–present Шаблон:Flagicon No ? 78 Шаблон:Rint Шаблон:Rint
100 Series[33] Файл:Buenos Aires Subte D 2.JPG 2004–present Шаблон:Flagicon Шаблон:Flagicon Yes 96 96 Шаблон:Rint
200 Series[34][35] Файл:Subte metro on A line at Plaza de Mayo station in Buenos Aires, Argentina (15753975528).png 2013–present Шаблон:Flagicon Yes 150 150 Шаблон:Rint (105)
Шаблон:Rint (45)
CAF 6000[36][35][37] Файл:CAF 6000 at Dorrego.jpg 2015–present Шаблон:Flagicon No 72 72 Шаблон:Rint
300 Series[38][39][40][41][42][43][44] Файл:Series 300 1.jpg 2016-Present Шаблон:Flagicon Yes 180 162
(being phased-in)
Шаблон:Rint (78)
Шаблон:Rint (42)

Green = current, Blue = future, Yellow = being phased-out.

Lines

In the mid-2010s, the Underground was in a transitional period where temporary rolling stock was serving on numerous lines while orders arrived from China and Brazil. After these cars arrived in 2015 and 2016, the network had a far less diverse rolling stock, with Line A being composed entirely of CITIC-CNR trains, while lines D and H were made up entirely of Alstom Metropolis trains. The older Siemens-Schuckert Orenstein & Koppel cars were completely retired from the network, thus reducing the average age of the rolling stock significantly. With this move towards standardisation, some of the newer trains have received series numbers: the original Alstom Metropolis trains on Line D have been dubbed the 100 Series, the CITIC-CNR trains are the 200 Series, while the newer Alstom Metropolis trains for lines H and D are the 300 Series.[45]

Line B are composed of CAF cars purchased from the Madrid Metro while retiring the Eidan 500 cars. Line C is using a variety of Nagoya cars, while Line E is using Fiat-Materfer cars and refurbished Siemens-Schuckert Orenstein & Koppel cars, retiring the CAF/GEE cars. No plans have been made public about the long-term intentions with these lines, though Line C has received a modern communications-based train control system in preparation for newer rolling stock.[46] It has not been stated what rolling stock will be used on Line F, though the usage of platform screen doors on the line will require modern rolling stock and automated trains are being considered.[47]

Line A

Шаблон:See also

Файл:Coche CNR - Línea A del Subte de Buenos Aires.jpg
Interior of a 200 Series car.

Until 2013, Line A had been served by La Brugeoise cars and a small number UEC Preston cars, which were retired prior to the Brugeoise cars. These were withdrawn from service on 12 January 2013, 11 months before their 100th anniversary and replaced by 45 new 200 Series cars built by China CNR Corporation.[48] However, the Chinese cars were not sufficient to cover the entire fleet of the line, so it had to be supplemented by a temporary fleet of 35 Fiat-Materfer cars, which was still not enough to replace the 120 La Brugeoise units and thus Siemens-Schuckert Orenstein & Koppel stock reformed by the Emepa Group was also added to the line to make up the numbers.[49] Furthermore, the replacement of the rolling stock coincided with the opening of the San José de Flores and San Pedrito stations and the line was still left with a rolling stock defect, causing a decline in passenger numbers.[50]

A further 105 CNR cars were ordered in 2014 so that the line would be served in its entirety by 150 of these 200 Series cars, and so the temporary replacement rolling stock could be moved to Line E in time for its extension to Retiro.[34] The cars steadily arrived into the country since 2015 and have been incorporated into the line, with the last of the CNR units arriving during 2016 and 2017. Line A's rolling stock now consists entirely of these models.[34][51]

Line B

Шаблон:See also

Файл:Eidan-en-el-FCU-1 (cropped).jpg
The Eidan 500 trains could continue above ground on the Urquiza Line.
Файл:CAF 6000 Interior.jpg
Passengers on board a CAF 6000 train

Line B has been historically the most diverse of the network given its significantly different characteristics to other lines and thus its rolling stock has not been uniform for most of its history. This was addressed in 1996 when rolling stock was purchased from the Tokyo Metro Marunouchi Line in order to make the line uniform. This was also the first time in the network's history that rolling stock was purchased second hand. In 2003, two stations were added to the line, followed by another two in 2013, meaning that the already old rolling stock was now also stretched to capacity. In 2011, it was announced that the Madrid Metro had sold some of its 5000 series trains to the Underground, which had been in operation in Madrid since 1974, and entered service in 2013 in order to make up shortfalls caused by the line's extensions. The 36 Spanish cars were of lower quality and reliability than the Japanese trains, despite being newer, and suffered a series of mechanical issues following their integration into the line.[17]

In July 2013, Madrid Metro sold 73 of its 6000 series cars (which entered service in Madrid in 1998) to Buenos Aires for $38.8 million in order to retire the rest of the Japanese-built trains.[52][53][54][55] A further 13 of these cars were purchased for $7.8 million, bringing the total up to 86.[36] The purchase of the CAF 6000 rolling stock has been met with criticism due to major alterations that were made to the line to accommodate the cars' height, as well as the fact that the second-hand units were not significantly cheaper than simply purchasing new rolling stock, and were not of particularly good quality, unlike the new Line A cars.[56][57] The biggest drawback of these cars is that, unlike the Eidan 500 and CAF 5000 cars, they use overhead electrification instead of third rail, and were thus initially unsuitable for the line. They had to be adapted to use both third rail and overhead electrification for what was by this point three models of rolling stock being used on the line.[36] Similarly, changing to overhead lines would mean that the potential for an overground branch of the line from Federico Lacroze using Urquiza Line tracks would be lost since that line also uses third rail electrification. Following a series of setbacks caused by the power inefficiency of these trains, as of August 2015 it was unclear if they would be used on the line or moved elsewhere and new plans drawn up for the line which would not involve Spanish rolling stock.[58]

Line C

Шаблон:See also

Файл:Nagoya-300-6.jpg
Interior of a Nagoya 300 train.

Line C was originally served by Siemens-Schuckert Orenstein & Koppel rolling stock, which were replaced in 2007 by Nagoya rolling stock transferred from Line D as 100 Series cars arrived on that line.[59] These cars began to be refurbished in 2014, equipped with air conditioning, new lighting and upholstery, among other changes.[60] The refurbishment of the 78 Nagoya cars was completed in 2015–2016.[61] From 2014, 30 additional cars, belonging to the newer 5000 Series, were purchased from the Nagoya Municipal Subway and arrived in the country.[19]

With the incorporation of these trains in 2015, the line has 108 Nagoya cars, though from different series and refurbished to increase the uniformity among them. No long term plans have been made as to what rolling stock the line will use when it is modernised, however the line has been updated with Trainguard Communications-based train control to allow for automatic train operation, meaning that it could be served by such trains.[46]

Line D

Шаблон:See also

Файл:Coche 3 - Linea D.jpg
Interior of a 100 Series car following the mid-life refurbishment.

Line D was originally served by Siemens-Schuckert Orenstein & Koppel rolling stock, and then by the CAF/GEE cars from 1968. In 1999, cars from the Nagoya Municipal Subway were purchased second hand from Japan and incorporated into the line. At the time of the incorporation of the Nagoya cars, numerous Alstom Metropolis 100 Series cars were purchased and built in Brazil and Argentina in 2001 with the intention of incorporating them into Line A and replace the Brugeoise rolling stock. However, when these arrived, they were ultimately put in service on Line D where they remain to this day. More Alstom cars of the same type continued to be purchased in that decade up until 2009, making a total of 96 cars.[33]

The remaining Nagoya cars were moved to Line C when the Siemens-Schuckert Orenstein & Koppel cars were retired from that line in 2007 and were replaced with Fiat-Materfer cars, so the line continued to have two models of rolling stock. To make the rolling stock more uniform, 24 more modern 300 Series Alstom Metropolis cars were ordered in 2013 and arrived in 2015, retiring the Materfer cars from the line and meaning that the line is entirely composed of 120 Alstom cars.[38] However, in September 2015, the city presented a new modernisation plan which showed 84 new cars for the line instead of 24.[40] Beginning in 2014, the existing 100 Series cars began to receive a mid-life refurbishment, changing the upholstery and adding air conditioning units to the cars.[62] In early 2016, the final figure had been fixed at 60 new cars. By 2017, the fleet was composed of 156 Alstom Metropolis cars, retiring the Fiat-Materfer cars from the line.[63] In June 2017, the first six Alstom 300 started operating in the line.[64]

Line E

Шаблон:See also

Файл:Interior of a CAF-General Eléctrica Española from the Buenos Aires Metro (33531190080).jpg
Interior of a CAF-GEE train from Line E.

The line was the last to be inaugurated with Siemens-Schuckert Orenstein & Koppel rolling stock, however these were replaced by Fiat-Materfer cars in the 1980s. The Materfer cars were later sent to Line D and Line D's CAF-GEE rolling stock was put to use on Line E, where it remains until this day, making up the entirety of the rolling stock on the Line.[4][5] After the new 200 Series and 300 Series rolling stock arrived for Lines A, D and H and the three lines are composed entirely of these two models, the CAF-GEE rolling stock has been retired from Line E and replaced once again with Materfer since the refurbished Siemens by Alstom and the Emepa Group were more than 80 years old and their performance was poor.[65] This change occurred before the completion of the line's extension to Retiro.[26][66][67]

Line H

Шаблон:See also

Файл:Alstom serie 300 (1).jpg
Interior of a 300 Series car.

When Line H was opened in 2007, its short length meant that it could be temporarily served by Siemens-Schuckert Orenstein & Koppel cars until it was extended enough to warrant the incorporation of new rolling stock. For this purpose, 120 new Alstom Metropolis 300 Series cars were ordered from Brazil and began arriving in Buenos Aires in August 2015 in time for the line's extension northwards to Santa Fe.[45] The 20 trains with 6 cars each make up the entirety of the rolling stock of the line as it continues to be extended.[68]

The first 300 Series cars were put into service in July 2016, with the remainder being phased in throughout 2016 and 2017, increasing frequencies to an average of 3 minutes as a result of the increased number of trains as well as the use of Communication Based Train Control (CBTC).[69][70] The incorporation of these cars also meant the retirement of the Siemens-Schuckert Orenstein & Koppel cars, which were the oldest serving stock on the network.[71]

PreMetro

Шаблон:See also

When the Premetro was opened in 1987, it was to be served by trams manufactured by the Argentine company Materfer. However, the cars were not ready for the line's inauguration, so it was briefly served by La Brugeoise cars re-bodied by the Emepa Group. The re-bodied cars were nicknamed Lagartos (Lizards) due to their green colour and were soon retired.[72] In 1988, the Materfer trams arrived on the line and the cars continue to serve on it to this day. Originally, 25 cars were to be built since there were to be two Premetro lines, however, only of these 17 cars were built for the E2 line since the E1 line was not built.[73]

Future lines

Three other lines are planned for the network, however the only line which has been approved for construction as of 2015 is Line F. Construction was due to begin in 2015 so it is yet unknown what rolling stock will be used, though they will be of modern characteristics, with platform screen doors and automated trains being considered.[47]

See also

Шаблон:Commons category

References

Шаблон:Reflist Шаблон:Buenos Aires Underground rolling stock

  1. Fin de la espera: esta semana, el subte llegará al centro de Flores - La Nacion, 23 September 2013.
  2. Los viejos vagones del subte A realizarán viajes turísticos - InfoBAE, 3 September 2013.
  3. Coches históricos de la Línea A se donarán a museos y universidades - Perfil, 14 August 2015.
  4. 4,0 4,1 Línea E: 70 años buscando pasajeros - EnElSubte, 20 June 2014.
  5. 5,0 5,1 5,2 5,3 Ferrofilatelia - EnElSubte, 6 June 2010.
  6. Línea D - Buenos Aires Ciudad.
  7. Línea E - Buenos Aires Ciudad.
  8. Exhibieron la dupla histórica Preston para festejar el Bicentenario - EnElSubte, 26 May 2010.
  9. 9,0 9,1 Subte: Remodelarán otros 40 coches Siemens - Taringa!, 19 November 2013.
  10. Шаблон:Cite news
  11. Шаблон:Cite news
  12. 12,0 12,1 Subte: 100 años avanzando - Buenos Aires Ciudad, 29 November 2013.
  13. La accidentada historia de los Siemens-FM - EnElSubte, 30 January 2014
  14. Trasladan Siemens para reformar a los talleres de Emepa en Pérez - EnElSubte, 16 December 2013.
  15. Vidal hace campaña con trenes de 1930 y miente sobre incorporación de coches - EnElSubte, 15 July 2015.
  16. Шаблон:Cite news
  17. 17,0 17,1 Metro de Madrid ya había ofrecido los CAF 5000 al Subte en los años 80 - EnElSubte, 8 Julio 2014
  18. Шаблон:Cite news
  19. 19,0 19,1 Se embarcan en Japón últimas dos formaciones Nagoya - EnElSubte, 18 May 2015.
  20. Шаблон:Cite news
  21. Realizan pruebas con Brugeoise reconvertidos a 1500 V en la línea A - EnElSubte, July 2014
  22. Aprueban protección para todos los coches La Brugeoise - EnElSubte, 6 December 2013.
  23. Шаблон:Cite news
  24. Шаблон:Cite news
  25. Шаблон:Cite news
  26. 26,0 26,1 Metrovías oficializa quita de formaciones - EnElSubte, 4 June 2013.
  27. Шаблон:Cite web
  28. El plan de SBASE para el Premetro - EnElSubte, 8 September 2014.
  29. Шаблон:Cite web
  30. Шаблон:Cite news
  31. 31,0 31,1 Шаблон:Cite news
  32. Шаблон:Cite news
  33. 33,0 33,1 Finalizó la entrega de los Alstom Metrópolis - EnElSubte, 9 March 2009.
  34. 34,0 34,1 34,2 Hacienda aprueba contrato de financiamiento para 105 coches CNR - EnElSubte, 24 July 2014.
  35. 35,0 35,1 Шаблон:Cite web
  36. 36,0 36,1 36,2 Bochorno: los trenes usados de la B ya costaron más que comprar 0 km - EnElSubte, 30 June 2015.
  37. Шаблон:Cite news
  38. 38,0 38,1 SBASE anuncia nuevos coches con foto del Metro de San Pablo - EnElSubte, 21 January 2014.
  39. Llegaron al país seis coches nuevos con aire acondicionado para la línea H - La Nacion, 27 August 2015.
  40. 40,0 40,1 Plan de modernización del Subterráneo de Buenos Aires - Buenos Aires Ciudad, September 2015.
  41. Шаблон:Cite web
  42. Шаблон:Cite newsШаблон:Dead link
  43. Шаблон:Cite news
  44. Шаблон:Cite news
  45. 45,0 45,1 Descargan primera formación Alstom en el Taller Colonia - EnElSubte, 27 August 2015.
  46. 46,0 46,1 Siemens modernizará las señales de la línea C - EnElSubte, October 2014.
  47. 47,0 47,1 Confirman proyecto para desviar la línea F a Facultad de Derecho - EnElSubte, 25 November 2014.
  48. Preadjudican 105 coches a CNR para la línea A - EnElSubte, May 2013
  49. SBASE reconoce que la frecuencia de la línea A es "inadmisible" - EnElSubte, 5 March 2014.
  50. Embarcaron primeros dos trenes de la segunda tanda de CNR - EnElSubte, 4 February 2015.
  51. Incorporarán nuevos trenes a la línea A: realizan pruebas - EnElSubte, 5 June 2015.
  52. Шаблон:Cite web
  53. Шаблон:Cite web
  54. Шаблон:Cite web
  55. Шаблон:Cite web
  56. La peor compra de material rodante de la historia del Subte - EnElSubte, 6 March 2015
  57. Piden informes al GCBA por los trenes usados para la línea B - EnElSubte, 15 March 2015
  58. Los "nuevos" trenes de la línea B siguen sin funcionar - EnElSubte, 28 August 2015.
  59. Entra en servicio un tren Nagoya reformado - EnElSubte, 23 October 2014.
  60. Aire acondicionado para los Nagoya - 21 October 2014.
  61. Aprobaron el presupuesto de SBASE para 2015 - EnElSubte, 24 April 2015.
  62. Instalarán aire acondicionado sólo en la mitad de los Alstom de la línea D - 27 March 2015.
  63. Шаблон:Cite news
  64. Шаблон:Cite web
  65. Шаблон:Cite web
  66. Subtes: el gobierno porteño planea renovar la mitad de la flota para el 2015 - InfoBAE, 23 January 2013
  67. Ciudad confirma que la extensión de la línea E abrirá recién en 2017 - EnElSubte, 23 July 2015.
  68. Subtes: el gobierno porteño planea renovar la mitad de la flota para el 2015 - InfoBAE, 29 January 2013.
  69. Шаблон:Cite news
  70. Шаблон:Cite news
  71. Шаблон:Cite news
  72. El discreto y perverso encanto del progreso - La Nacion, 5 January 2013.
  73. Cross, Barry (April 2001). "Buenos Aires: Brand new pre-Metro line" Шаблон:Webarchive. Tramways & Urban Transit, pp. 136–137. UK: Light Rail Transit Association/Ian Allan Publishing.