Bumbuna II Hydroelectric Power Station is a planned Шаблон:Convert hydroelectric power station in Sierra Leone. The power plant is under development by a consortium of renewable energy IPPs and investors, led by Joule Africa Limited. The energy generated here will be sold to Electricity Distribution and Supply Authority (EDSA), the electricity utility company of Sierra Leone, under a 25-year power purchase agreement.[1]

Location

The power station would be located across the Seli River (Rokel River), outside the town of Bumbuna, in Tonkolili District, in the Northern Province of Sierra Leone. This location is approximately Шаблон:Convert, by road, northeast of downtown Bumbuna, adjacent to the 50 megawatt Bumbuna I Hydroelectric Power Station.[2] Bumbuna is located approximately Шаблон:Convert by road northeast of the city of Magburaka, the district capital.[3] This is about Шаблон:Convert by road, northeast of Freetown, the county's capital and largest city.[4] Bumbuna II will be an extension of Bumbuna I,[5] with similar geographical coordinates at 9°04'19.0"N, 11°43'21.0"W (Latitude:09.071944; Longitude:-11.722500).[6]

Overview

Bumbuna I Hydropower Station is a 50 megawatt installation owned by the government of Sierra Leone. The power station which cost US$327 million to build, was commissioned in 2009. However its output is not enough to meet the country's electricity needs.[5][7]

The new plan is to build a new power station (Bumbuna II), with capacity of 143 megawatts, adjacent to the first one with capacity of 50 megawatts (Bumbuna I). This involves expansion of the Bumbuna I Dam and the construction of a new dam at Yiben, approximately Шаблон:Convert upstream of the Bumbuna I Dam.[5][7][8]

At Bumbuna, a new intake channel will be built approximately Шаблон:Convert upstream of the existing dam. Two Francis-type turbines each rated at 42.15 megawatts and one 3.7 megawatts turbine will be installed here for a total of 88 megawatts in new capacity.[5]

At Yiben, the dam there will measure Шаблон:Convert in height and will be Шаблон:Convert wide. It will be a "roller compacted concrete (RCC) gravity dam", creating a lake with a surface area measuring Шаблон:Convert. The powerhouse at Yiben will have two Francis turbines each rated at 27.7 megawatts installed for a total of 55.4 megawatts in new capacity.[5]

Ownership

Bumbuna II, with new generation capacity of 143.4 megawatts, is owned and will be developed, operated and maintained by Seli Hydropower Limited (SHPL). SHPL is a joint venture between Joule Africa, a renewable energy IPP headquartered in London, United Kingdom and Energy Services Company (ESCO), based in Freetown, Sierra Leone.[5]

Construction, funding and timeline

The construction budget is quoted at US$750 million. Funding sources include (a) the African Development Bank (AfDB) (b) the European Commission (EC), through the Electrification Financing Initiative (ElectriFI) (c) Private Infrastructure Development Group (PIDG) and (d) Emerging Africa Infrastructure Fund (EAIF).[5]

Other considerations

The 88 megawatts generated at Bumbuna II, will be evacuated via a new 225kV double-circuit transmission line to a substation located about Шаблон:Convert south-west of the Bumbuna II powerhouse. The 55.4 megawatts generated at Yiben will be transferred to Bumbuna II, thorough a new single-circuit transmission line measuring approximately Шаблон:Convert.[5]

The 50 megawatts generated at Bumbuna I is transferred to Freetown via a 161kV single-circuit transmission line that measures about Шаблон:Convert. It enters the national grid there.[5]