Шаблон:Short description Шаблон:Redirect-distinguish-text Шаблон:Pp-vandalism Шаблон:Use dmy dates Шаблон:Infobox building The Burj KhalifaШаблон:Efn (known as the Burj Dubai prior to its inauguration) is a skyscraper in Dubai, United Arab Emirates. It is the world's tallest structure. With a total height of 829.8 m (2,722 ft, or just over half a mile) and a roof height (excluding antenna, but including a 242.6 m spire)[1] of Шаблон:Convert, the Burj Khalifa has been the tallest structure and building in the world since its topping out in 2009, supplanting Taipei 101, the previous holder of that status.[2][3]

Construction of the Burj Khalifa began in 2004, with the exterior completed five years later in 2009. The primary structure is reinforced concrete and some of the structural steel for the building originated from the Palace of the Republic in East Berlin, the former East German parliament.[4] The building was opened in 2010 as part of a new development called Downtown Dubai. It was designed to be the centerpiece of large-scale, mixed-use development. The decision to construct the building was based on the government's decision to diversify from an oil-based economy, and for Dubai to gain international recognition.Шаблон:Citation needed The building is named in honor of the former president of the United Arab Emirates, Khalifa bin Zayed Al Nahyan.[5] Abu Dhabi and the UAE government lent Dubai money to pay its debts. The building broke numerous height records, including its designation as the tallest building in the world.

Burj Khalifa was designed by a team led by Adrian Smith of Skidmore, Owings & Merrill, the firm that designed the Sears Tower in Chicago, a previous record holder for the world's tallest building. Hyder Consulting was chosen to be the supervising engineer with NORR Group Consultants International Limited chosen to supervise the architecture of the project. The design is derived from the Islamic architecture of the region, such as in the Great Mosque of Samarra. The Y-shaped tripartite floor geometry is designed to optimize residential and hotel space. A buttressed central core and wings are used to support the height of the building. Although this design was derived from Tower Palace III, the Burj Khalifa's central core houses all vertical transportation except egress stairs within each of the wings.[6] The structure also features a cladding system which is designed to withstand Dubai's hot summer temperatures. It contains a total of 57 elevators and 8 escalators.

At a certain point in the architectural and engineering process, the original Emaar developers experienced financial problems and required more money and economic funding. Sheikh Khalifa, the then-ruler of the United Arab Emirates, granted monetary aid and funding, hence the changing of the name from "Burj Dubai" to "Burj Khalifa". The concept of profitability derived from building high-density developments and malls around the landmark has proven successful. Its surrounding malls, hotels, and condominiums in Downtown Dubai have generated the most revenue from the project as a whole, while the Burj Khalifa itself made little or no profit.[7][8]

The critical reception of Burj Khalifa has been generally positive, and the building has received many awards. Numerous complaints concern migrant workers from South Asia, the primary building labour force, who were paid low wages and sometimes had their passports confiscated.[9]

Development

Construction began on 12 January 2004, with the exterior of the structure completed on 1 October 2009. The building officially opened on 4 January 2010[10][11] and is part of the Шаблон:Convert Downtown Dubai development at the 'First Interchange' along Sheikh Zayed Road, near Dubai's main business district. The tower's architecture and engineering were performed by Skidmore, Owings & Merrill of Chicago, with Adrian Smith as chief architect, and Bill Baker as a chief structural engineer.[12][13] The primary contractor was Samsung C&T of South Korea, together with local company Arabtec and the Belgian group BESIX.[14]

Conception

Burj Khalifa was designed to be the centerpiece of a large-scale, mixed-use development to include 30,000 homes,Шаблон:Citation needed nine hotels (including The Address Downtown Dubai), Шаблон:Convert of parkland, at least 19 residential skyscrapers, the Dubai Mall, and the Шаблон:Convert artificial Burj Khalifa Lake. The decision to build Burj Khalifa was reportedly based on the government's decision to diversify from an oil-based economy to one that is service and tourism based. According to officials, projects like Burj Khalifa needed to be built to garner more international recognition and hence investment. "He (Sheikh Mohammed bin Rashid Al Maktoum) wanted to put Dubai on the map with something really sensational," said Jacqui Josephson, a tourism and VIP delegations executive at Nakheel Properties.[15] The tower was known as Burj Dubai ("Dubai Tower") until its official opening in January 2010.[16] It was renamed in honour of the ruler of Abu Dhabi, Khalifa bin Zayed Al Nahyan; Abu Dhabi and the federal government of UAE lent Dubai tens of billions of US dollars so that Dubai could pay its debts – Dubai borrowed at least $80 billion for construction projects.[16] In the 2000s, Dubai started diversifying its economy but it suffered from an economic crisis in 2007–2010, leaving large-scale projects already in construction abandoned.[17]

Records

The Burj Khalifa set several world records, including:

Architecture and design

Файл:Comparisonfinal001fx7.png
Cross-section comparisons of various towers, from ground level to top: Burj Khalifa, Taipei 101, Willis Tower, and World Trade Center

The tower was designed by Skidmore, Owings, and Merrill (SOM), which also designed the Willis Tower (formerly the Sears Tower) in Chicago and the One World Trade Center in New York City. Burj Khalifa uses the bundled tube design of the Willis Tower, invented by Fazlur Rahman Khan.[30][31] Due to its tubular system, proportionally only half the amount of steel was used in the construction, compared to the Empire State Building.[30][32] Khan's contributions to the design of tall buildings have had a profound impact on architecture and engineering. It would be difficult to find any worldwide practices in the design of tall buildings that have not been directly or indirectly influenced by his work.[33] The design is reminiscent of Frank Lloyd Wright's vision for The Illinois, a mile-high skyscraper designed for Chicago, as well as Chicago's Lake Point Tower. When Adrian Smith was conceiving the project at SOM, he looked out his office window toward Lake Point Tower's curved three-wing layout and thought, "There's the prototype".[34] According to Strabala, Burj Khalifa was designed based on the 73 floor Tower Palace Three, an all-residential building in Seoul. In its early planning, Burj Khalifa was intended to be entirely residential.[35]

After the original design by Skidmore, Owings, and Merrill, Emaar Properties chose Hyder Consulting to be the supervising engineer and NORR Group Consultants International Ltd to supervise the architecture of the project.[36] Hyder was selected for their expertise in structural and MEP (mechanical, electrical and plumbing) engineering.[37] Hyder Consulting's role was to supervise construction, certify the architect's design, and be the engineer and architect of record to the UAE authorities.[36] NORR's role was the supervision of all architectural components including on-site supervision during the construction and design of a 6-story addition to the office annex building for architectural documentation. NORR was also responsible for the architectural integration drawings for the Armani Hotel included in the Tower. Emaar Properties also engaged GHD,[38] an international multidisciplinary consulting firm, to act as an independent verification and testing authority for concrete and steelwork.

The design is derived from Islamic architecture.[20] As the tower rises from the flat desert base, there are 27 setbacks in a spiral pattern, decreasing the cross-section of the tower as it rises and creating convenient outdoor terraces. These setbacks are arranged and aligned in a way that minimizes vibration wind loading from eddy currents and vortices.[6] At the top, the central core emerges and is sculpted to form a finishing spire. At its tallest point, the tower sways a total of Шаблон:Convert.[39]

Файл:Samara spiralovity minaret rijen1973.jpg
The spiral minaret at the Great Mosque of Samarra

The spire of Burj Khalifa is composed of more than Шаблон:Convert of structural steel. The central pinnacle pipe weighs Шаблон:Convert and has a height of Шаблон:Convert. The spire also houses communications equipment.[40] This Шаблон:Convert spire is widely considered vanity height, since very little of its space is usable. Without the spire, Burj Khalifa would be Шаблон:Convert tall. This was reported in a Council on Tall Buildings and Urban Habitat study, which notes that the empty spire "could be a skyscraper on its own".[1] Such a skyscraper, if located in Europe, would be the 11th tallest building on that continent.[41]

In 2009 architects announced that more than 1,000 pieces of art would adorn the interiors of Burj Khalifa, while the residential lobby of Burj Khalifa would display the work of Jaume Plensa.[42]

The cladding system consists of Шаблон:Convert of more than 26,000 reflective glass panels and aluminium and textured stainless steel spandrel panels with vertical tubular fins.[40] The architectural glass provides solar and thermal performance as well as an anti-glare shield for the intense desert sun, extreme desert temperatures and strong winds. The glass covers more than Шаблон:Convert in area.Шаблон:Citation needed The Burj's typical curtain wall panels measure Шаблон:Convert wide by Шаблон:Convert high and weigh about Шаблон:Convert each, with wider panels near the building's edges and taller ones near the top.[43]

The exterior temperature at the top of the building is thought to be 6 °C (11 °F) cooler than at its base.[44]Шаблон:Update inline

A 304-room Armani Hotel, the first of four by Armani, occupies 15 of the lower 39 floors.[2][45] The hotel was supposed to open on 18 March 2010,[46][47] but after several delays, it finally opened to the public on 27 April 2010.[48] The corporate suites and offices were also supposed to open from March onwards,[49] yet the hotel and observation deck remained the only parts of the building which were open in April 2010.

The sky lobbies on the 43rd and 76th floors house swimming pools.[50] Floors 20 through 108 have 900 private residential apartments (which, according to the developer, sold out within eight hours of being on the market). An outdoor zero-entry swimming pool is located on the 76th floor of the tower. Corporate offices and suites fill most of the remaining floors, except for the 122nd, 123rd, and 124th, where the At.mosphere restaurant, sky lobby, and an indoor and outdoor observation deck are located respectively. In January 2010, it was planned that Burj Khalifa would receive its first residents in February 2010.[50][51]

The building has 57 elevators and 8 escalators.[40] The elevators have a capacity of 12 to 14 people per cabin, and include the world's fastest double-deck elevators, rising and descending at up to Шаблон:Convert. Engineers initially considered installing the world's first triple-deck elevators.[23] The double-deckers are equipped with LCD displays to amuse visitors during their travel to the observation deck.[52] The building has 2,909 stairs from the ground floor to the 160th floor.[53]

Plumbing systems

The Burj Khalifa's water system supplies an average of Шаблон:Convert of water per day through Шаблон:Convert of pipes.[20][54] An additional Шаблон:Convert of piping serves the fire emergency system, and Шаблон:Convert supplies chilled water for the air conditioning system.[54]

Air conditioning

The air conditioning system draws air from the upper floors where the air is cooler and cleaner than on the ground.[55] At peak cooling times, the tower's cooling is Шаблон:Cvt, equivalent to that provided by Шаблон:Convert of melting ice in one day.[54] Water is collected via a condensate collection system and is used to irrigate the nearby park.[20]

Window cleaning

To wash the 24,348 windows, totaling Шаблон:Convert of glass, the building has three horizontal tracks, each holding a Шаблон:Convert bucket machine. Above level 109, and up to tier 27, traditional cradles from davits are used. The top of the building is cleaned by a crew that uses ropes to descend from the top to gain access.[56][57] Under normal conditions, when all building maintenance units are operational, it takes 36 workers three to four months to clean the entire exterior.[40][58]

Unmanned machines clean the top 27 additional tiers and the glass spire. The cleaning system was developed in Melbourne, Australia, by CoxGomyl, a manufacturer of building maintenance units,[59] at a cost of A$8 million.[58]

Features

Fountain

Файл:Dubai Fountain 7.JPG
The Dubai Fountain

Шаблон:Main Outside the Burj Khalifa, WET Enterprises designed a fountain system at a cost of Dh 800 million (US$217 million). Illuminated by 6,600 lights and 50 coloured projectors, it is Шаблон:Convert long and shoots water Шаблон:Convert into the air while accompanied by a range of classical to contemporary Arabic and other music. It is the world's largest choreographed fountain.[60] On 26 October 2008, Emaar announced that based on results of a naming contest the fountain would be called the Dubai Fountain.[61]

Observation deck

Шаблон:Main

Файл:Dubai Fountain from At The Top of Burj Khalifa.JPG
View of The Dubai Fountain from the observation deck
Файл:View from burj khalifa6934713247 db12c311cb o.jpg
View from the observation deck

An outdoor observation deck, named At the Top, opened on 5 January 2010 on the 124th floor. At Шаблон:Convert, it was the highest outdoor observation deck in the world when it opened.[62] Although it was surpassed in December 2011 by Cloud Top 488 on the Canton Tower, Guangzhou at Шаблон:Convert,[63] Burj Khalifa opened the 148th floor SKY level at Шаблон:Convert, once again giving it the highest observation deck in the world on 15 October 2014, later on February 18th 2019, the Burj Khalifa opened The Lounge observatory at Шаблон:Convert making it the highest lounge in the world,[64][65] However the Shanghai Tower opened in June 2016 with an observation deck at a height of 561 metres so taking the title of the world's highest observation deck. The 124th floor observation deck also features the electronic telescope, an augmented reality device developed by Gsmprjct° of Montréal, which allows visitors to view the surrounding landscape in real-time, and to view previously saved images such as those taken at different times of day or under different weather conditions.[66][67][68] To reduce the daily rush of sightseers, management allows visitors to purchase tickets in advance for a specific date and time, at a 75% discount on tickets purchased on the spot.[69]

On 8 February 2010, the observation deck was closed to the public for two months after power-supply problems caused an elevator to become stuck between floors, trapping a group of tourists for 45 minutes.[70][71][72][73][74]

When the tide is low and visibility is high, people can see the shores of Iran (which is around Шаблон:Convert away) from the top of the skyscraper.[75]

Park

Burj Khalifa is surrounded by an Шаблон:Convert park designed by landscape architects SWA Group.[76] Like the tower, the park's design was based on the flower of the Hymenocallis, a desert plant.[77] At the centre of the park is the water room, which is a series of pools and water jet fountains. Benches and signs incorporate images of Burj Khalifa and the Hymenocallis flower.[78]

The plants are watered by water collected from the building's cooling system. The system provides Шаблон:Convert annually.[78] WET Enterprises, who also developed the Dubai Fountain, developed the park's six water features.[79]

Floor plan

Floors Purpose[40][80] Dimetric projection with floors color-coded by function[81]
160–163 Mechanical

<timeline> ImageSize = width:70 height:518 PlotArea = left:28 right:0 top:3 bottom:4 DateFormat = yyyy Period = from:-5 till:165 TimeAxis = orientation:vertical ScaleMajor = unit:year increment:10 start:-5 gridcolor:black ScaleMinor = unit:year increment:1 start:-4 gridcolor:tan2 Colors =

id:sp value:rgb(0,0,0)
id:me value:rgb(0.5,0.5,0.5)
id:at value:rgb(1,0,0)
id:cb value:rgb(1,1,0)
id:re value:rgb(0,1,0)
id:ho value:rgb(0,1,1)
id:co value:rgb(0,0,1)
id:ob value:rgb(1,0,1)
id:sl value:rgb(1,1,1)

BarData =

bar:level

PlotData =

width:38
bar:level from:160   till:164 color:me
bar:level from:156   till:160 color:cb
bar:level from:155   till:156 color:me
bar:level from:152   till:154 color:ob
bar:level from:149   till:151 color:co
bar:level from:148   till:149 color:ob
bar:level from:139   till:148 color:co
bar:level from:136   till:139 color:me
bar:level from:125   till:136 color:co
bar:level from:124   till:125 color:ob
bar:level from:123   till:124 color:sl
bar:level from:122   till:123 color:at
bar:level from:111   till:122 color:co
bar:level from:109   till:111 color:me
bar:level from:77    till:109 color:re
bar:level from:76    till:77  color:sl
bar:level from:73    till:76  color:me
bar:level from:44    till:73  color:re
bar:level from:43    till:44  color:sl
bar:level from:40    till:43  color:me
bar:level from:38    till:40  color:ho
bar:level from:19    till:38  color:re
bar:level from:17    till:19  color:me
bar:level from:9     till:17  color:re
bar:level from:-1    till:9   color:ho
bar:level from:-3    till:-1  color:me

</timeline>

Файл:Burj Khalifa floors.svg
156–159 Communication and broadcast
155 Mechanical
152-154 The Lounge observatory
149–151 Corporate suites
148 At the Top Sky observatory
139–147 Corporate suites
136–138 Mechanical
125–135 Corporate suites
124 At the Top observatory
123 Sky lobby
122 At.mosphere restaurant
111–121 Corporate suites
109–110 Mechanical
77–108 Residential
76 Sky lobby
73–75 Mechanical
44–72 Residential
43 Sky lobby
40–42 Mechanical
38–39 Armani Hotel suites
19–37 Residential
17–18 Mechanical
9–16 Armani Residences
1–8 Armani Hotel
Ground Armani Hotel, Lobby
Concourse Armani Hotel, Lobby
B1–B2 Parking, mechanical

Ramadan observance

On the higher floors, the sun is seen for several minutes after it has set at ground level. Those living above the 80th floor should wait two extra minutes to break their Ramadan fast, and those living above the 150th floor should wait three minutes.[82]

Construction

Файл:Burj Dubai Evolution.ogv
thumbtime=0:23
Файл:Burj dubai aerial closeup.jpg
Aerial closeup of Burj Khalifa under construction in March 2008

The tower was constructed by Samsung C&T from South Korea, which also did work on the Petronas Twin Towers and Taipei 101.[83] Samsung C&T built the tower in a joint venture with BESIX from Belgium and Arabtec from the UAE.[84][85] Turner was the project manager on the main construction contract.[86] Hong Kong-based Far East Aluminum combined to provide the exterior cladding for Burj Khalifa.[87][88]

The contractor and the engineer of record was Hyder Consulting.[89] Under UAE law, the contractor and the engineer of record is jointly and severally liable for the performance of Burj Khalifa.

The primary structure is reinforced concrete. Putzmeister created a new, super high-pressure trailer concrete pump, the BSA 14000 SHP-D, for this project.[22] Burj Khalifa's construction used Шаблон:Convert of concrete and Шаблон:Convert of steel rebar, and construction took 22 million man-hours.[12] In May 2008 Putzmeister pumped concrete with more than 21 MPA ultimate compressive strength of gravel to surpass the 600 meters weight of the effective area of each column from the foundation to the next fourth level, and the rest was by metal columns jacketed or covered with concrete to a then world record delivery height of Шаблон:Convert,[22] the 156th floor. Three tower cranes were used during the construction of the uppermost levels, each capable of lifting a 25-tonne load.[90] The remaining structure above was constructed of lighter steel.

In 2003, 33 test holes were drilled to study the strength of the bedrock underlying the structure.[91] "Weak to very weak sandstone and siltstone" was found, just metres below the surface.Шаблон:Citation needed Samples were taken from test holes drilled to a depth of 140 metres, finding weak to very weak rock all the way.[92] The study described the site as part of a "seismically active area".Шаблон:Citation needed Another challenging element was the shamal which often creates sandstorms.[18]

Over Шаблон:Convert of concrete, weighing more than Шаблон:Convert were used to construct the concrete and steel foundation, which features 192 piles; each pile is 1.5 metre in diameter by 43 m in length, buried more than Шаблон:Convert deep.[23] The foundation was designed to support the total building weight of approximately Шаблон:Convert. This weight was then divided by the compressive strength of concrete which is 30 MPa which yielded 450 sq. meters of vertical normal effective area, which then yielded 12 meters by 12 meters dimensions.[93] A cathodic protection system is under the concrete to neutralize the sulphate and chloride-rich groundwater and prevent corrosion.[40][18]

During the construction of the Burj Khalifa, over 35,000 tonnes of structural steel which held the Palace of the Republic, the former parliament building of the German Democratic Republic, the Volkskammer, in East Berlin together were shipped to Dubai in 2008.[4]

The Burj Khalifa is highly compartmentalised. Pressurized, air-conditioned refuge floors are located every 13 floors (on floors G, 13, 26, 39, 52, etc.) where people can shelter on their long walk down to safety in case of an emergency or fire.[40][94]

Special mixes of concrete were made to withstand the extreme pressures of the massive building weight; as is typical with reinforced concrete construction, each batch of concrete was tested to ensure it could withstand certain pressures. CTLGroup, working for Skidmore, Owings and Merrill, conducted the creep and shrinkage testing critical for the structural analysis of the building.[95]

The consistency of the concrete used in the project was essential. It was difficult to create a concrete that could withstand both the thousands of tonnes bearing down on it and Persian Gulf temperatures that can reach Шаблон:Convert. To combat this problem, the concrete was not poured during the day. Instead, during the summer months, ice was added to the mixture and it was poured at night when the air was cooler and the humidity was higher. Cooler concrete cures more evenly and is, therefore, less likely to set too quickly and crack. Any significant cracks could have put the entire project in jeopardy.[96][97][98][99][100]

Milestones

Файл:Burj Dubai 001.jpg
Burj Khalifa and skyline of Dubai, 2010

Real estate values

In March 2009, Mohamed Ali Alabbar, chairman of the project's developer, Emaar Properties, said office space pricing at Burj Khalifa reached US$4,000 per sq ft (over US$43,000 per m2) and the Armani Residences, also in Burj Khalifa, sold for US$3,500 per sq ft (over US$37,500 per m2).[111] He estimated the total cost for the project to be about US$1.5 billion.[5]

The project's completion coincided with the financial crisis of 2007–2008, and with vast overbuilding in the country, leading to high vacancies and foreclosures.[112] With Dubai mired in debt from its huge ambitions, the government was forced to seek multibillion-dollar bailouts from its oil-rich neighbor Abu Dhabi. Subsequently, in a surprise move at its opening ceremony, the tower was renamed Burj Khalifa, said to honour the UAE President Khalifa bin Zayed Al Nahyan for his crucial support.[3][113]

Because of the slumping demand in Dubai's property market, the rents in the Burj Khalifa plummeted 40% some ten months after its opening. Out of 900 apartments in the tower, 825 were still empty at that time.[114][115] Over the next 30 months, overseas investors steadily bought up available apartments and office space.[116] By October 2012, Emaar reported that around 80% of the apartments were occupied.[117]

Official launch ceremony

The ceremony was broadcast live on a giant screen on Burj Park Island and on smaller screens elsewhere.[118] Hundreds of media outlets from around the world reported live from the scene.[119] In addition to the media presence, 6,000 guests were expected.[120]

The opening was held on 4 January 2010.[121] The ceremony featured a display of 10,000 fireworks, light beams projected on and around the tower, and further sound, light and water effects.[119] The celebratory lighting was designed by UK lighting designers Speirs and Major Associates.[122] Using the 868 powerful stroboscope lights that are integrated into the façade and spire of the tower, different lighting sequences were choreographed, together with more than 50 different combinations of other effects.Шаблон:Citation needed

Controversies

Deadly incidents

On 10 May 2011, an Asian migrant worker in his mid-30s jumped to his death from the 147th floor onto the 108th floor's deck. Dubai police said he killed himself because his company refused to let him leave the country.[123]

On 18 May 2015, Dubai police disputed a report that a Portuguese tourist named Laura Vanessa Nunes fell to her death from the Burj Khalifa the prior 16 November, claiming that she fell from the Jumeirah Lake Towers.[124][125] Nine News obtained emails from Portugal's embassy in the UAE under freedom of information laws, which indicated that the female tourist jumped from the 148th floor of the Burj Khalifa.[126]

Labour

Шаблон:Further The Burj Khalifa was built primarily by workers from South Asia and East Asia.[127][128] This is generally because the current generation of UAE locals prefer governmental jobs and do not have an attitude favouring private sector employment.[129][130] On 17 June 2008, there were about 7,500 skilled workers employed at the construction site.[106] Press reports indicated in 2006 that skilled carpenters at the site earned £4.34 a day, and labourers earned £2.84.[127] According to a BBC investigation and a Human Rights Watch report, the workers were housed in abysmal conditions, and worked long hours for low pay.[131][132][133] During construction, only one construction-related death was reported.[134] Workplace injuries and deaths in the UAE are poorly documented, according to Human Rights Watch.[131]

In March 2006 about 2,500 workers, upset over buses that were delayed for the end of their shifts, protested and triggered a riot, damaging cars, offices, computers, and construction equipment.[127] A Dubai Interior Ministry official said the rioters caused almost £500,000 in damage.[127] Most of the workers involved in the riot returned the following day but refused to work.[127]

New Year's Eve

Emaar New Year's Eve is an annual event held every 31 December at Burj Khalifa, organized by Emaar Properties.[135][136] The event consists of fireworks launched from Burj Khalifa, a light and laser show on the facade of Burj Khalifa, and an accompanying soundtrack and a special fountain show on The Dubai Fountain choreographed to the soundtrack.[137][138] The Emaar New Year's Eve fireworks celebration originated in 2010 with the inauguration of the world's tallest building, Burj Khalifa. The celebration was broadcast live to more than two million people and lasted for three minutes.[139]

Since 2011, national live broadcasting rights have been held by Dubai Media Incorporated and Dubai TV.[139]

Emaar New Year's Eve has won two Guinness World Records, including 'Largest LED-Illuminated Facade' in 2015 and 2019.[140][141][142]

In 2017 and 2018, Emaar New Year's Eve was broadcast live on Twitter,[143][144] and YouTube. In 2020, it was broadcast live for the first time on Zoom.[145]

In 2021, Emaar celebrated togetherness in honor of frontline workers of the COVID-19 pandemic.[146]

From 2022 onwards, lasers are installed on Burj Khalifa each year that project animations onto The Dubai Fountain. The lasers are temporary for the event. [147]

BASE jumping

The building has been used by several experienced BASE jumpers for authorised and unauthorised BASE jumping:

In May 2008, Hervé Le Gallou and David McDonnell, dressed as engineers, entered Burj Khalifa (around Шаблон:Convert at the time), and jumped off a balcony situated several floors below the 160th floor.[148][149]

On 8 January 2010, with permission of the authorities, Nasr Al Niyadi and Omar Al Hegelan, from the Emirates Aviation Society, broke the world record for the highest BASE jump from a building after they leapt from a crane-suspended platform attached to the 160th floor at Шаблон:Convert. The two men descended the vertical drop at a speed of up to Шаблон:Convert, with enough time to open their parachutes 10 seconds into the 90-second jump.[150][151]

On 21 April 2014, with permission of the authorities and support from several sponsors, highly experienced French BASE jumpers Vince Reffet and Fred Fugen broke the Guinness world record for the highest BASE jump from a building after they leapt from a specially designed platform, built at the very top of the pinnacle, at Шаблон:Convert.[152][153][154]

Climbing

On 28 March 2011, Alain "Spiderman" Robert scaled the outside of Burj Khalifa. The climb to the top of the spire took six hours. To comply with UAE safety laws, Robert, who usually climbs in free solo style, used a rope and harness.[155]

Awards

In June 2010, Burj Khalifa was the recipient of the 2010 "Best Tall Building Middle East & Africa" award by the Council on Tall Buildings and Urban Habitat.[156] On 28 September 2010 Burj Khalifa won the award for the best project of the year at the Middle East Architect Awards 2010.[157] Awards Chair Gordon Gill, of Adrian Smith + Gordon Gill Architecture, said:

Шаблон:Blockquote

Burj Khalifa was also the recipient of the following awards.[158][159]

Year Award
2012 Award of Merit for World Voices Sculpture, Burj Khalifa Lobby from Structural Engineers Association of Illinois (SEAOI), Chicago.
2011 Interior Architecture Award, Certificate of Merit from AIA – Chicago Chapter.
Distinguished Building Award, Citation of Merit from AIA – Chicago Chapter.
Interior Architecture Award: Special Recognition from AIA – Chicago Chapter.
Design Excellence Award: Special Function Room.
Excellence in Engineering from ASHRAE (American Society of Heating, Refrigerating, and Air-Conditioning Engineers) – Illinois Chapter.
Outstanding Structure Award from International Association for Bridge and Structural Engineering.
Decade of Design, Presidential Commendation in Corporate Space Small from International Interior Design Association (IIDA).
Decade of Design • Best of Category/Mixed Use Buildings from International Interior Design Association (IIDA).
GCC Technical Building Project of the Year from MEED (formerly Middle East Economic Digest).
Project of the Year from MEED.
2010 International Architecture Award.
Arab Achievement Award 2010: Best Architecture Project from Arab Investment Summit.
Architecture Award (Mixed Use) Dubai from Arabian Property Awards.
Architecture Award (Mixed Use) Arabian Region from Arabian Property Awards.
International Architecture Award from Chicago Athenaeum.
American Architecture Award from Chicago Athenaeum.
Commercial / Mixed Use Built from Cityscape.
Best Mixed Use Built Development in Cityscape Abu Dhabi.
Skyscraper Award: Silver Medal from Emporis.
Award for Commercial or Retail Structure from Institution of Structural Engineers.
International Architecture Award (Mixed Use) from International Commercial Property Awards.
Special Recognition for Technological Advancement from International Highrise Awards.
Best Structural Design of the Year from LEAF Award.
International Projects Category: Outstanding Project from National Council of Structural Engineers Associations.
Best of What's New from Popular Science Magazine.
Spark Awards, Silver Award.
Excellence in Structural Engineering: Most Innovative Structure from SEAOI.

See also

Шаблон:Portal Шаблон:Div col

Шаблон:Div col end

Notes

Шаблон:Notelist

References

Шаблон:Reflist

External links

Шаблон:Commons and category

Шаблон:S-start Шаблон:S-ach Шаблон:S-bef Шаблон:S-ttl Шаблон:S-inc Шаблон:S-bef Шаблон:S-ttl Шаблон:S-break Шаблон:S-bef Шаблон:S-ttl Шаблон:S-break Шаблон:S-bef Шаблон:S-ttl Шаблон:S-break Шаблон:S-bef Шаблон:S-ttl Шаблон:S-break Шаблон:S-bef Шаблон:S-ttl Шаблон:S-end

Шаблон:Dubai skyscrapers Шаблон:Supertall skyscrapers Шаблон:Dubai landmarks Шаблон:Authority control Шаблон:WikidataCoord

  1. 1,0 1,1 Шаблон:Cite news
  2. 2,0 2,1 Шаблон:Cite web
  3. 3,0 3,1 3,2 Шаблон:Cite news
  4. 4,0 4,1 Шаблон:Citation
  5. 5,0 5,1 Шаблон:Cite news
  6. 6,0 6,1 Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite news
  11. Шаблон:Cite news
  12. 12,0 12,1 Шаблон:Cite news
  13. Шаблон:Cite news
  14. Шаблон:Cite web
  15. Шаблон:Cite news
  16. 16,0 16,1 Шаблон:Cite web
  17. Шаблон:Cite news
  18. 18,0 18,1 18,2 Шаблон:Cite book
  19. Шаблон:Cite web
  20. 20,0 20,1 20,2 20,3 20,4 Шаблон:Cite news
  21. Шаблон:Cite web
  22. 22,0 22,1 22,2 Шаблон:Cite web
  23. 23,0 23,1 23,2 Шаблон:Cite web
  24. 24,0 24,1 24,2 24,3 24,4 24,5 24,6 24,7 24,8 Шаблон:Cite web
  25. Шаблон:Cite web
  26. Шаблон:Cite web
  27. Шаблон:Cite news
  28. Шаблон:Cite news
  29. Шаблон:Cite news
  30. 30,0 30,1 Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite newsШаблон:Cbignore
  33. Шаблон:Cite web
  34. Шаблон:Cite news
  35. Шаблон:Cite magazine
  36. 36,0 36,1 Шаблон:Cite webШаблон:Dead link
  37. Шаблон:Cite webШаблон:Dead link
  38. Шаблон:Cite web
  39. Шаблон:Cite news
  40. 40,0 40,1 40,2 40,3 40,4 40,5 40,6 Шаблон:Cite web
  41. Шаблон:Cite web
  42. Шаблон:Cite web
  43. Шаблон:Cite web
  44. Шаблон:Cite web
  45. Шаблон:Cite web
  46. Шаблон:Cite news
  47. Шаблон:Cite magazine
  48. Шаблон:Cite news
  49. Шаблон:Cite web
  50. 50,0 50,1 Шаблон:Cite news
  51. Шаблон:Cite news
  52. Шаблон:Cite web
  53. Шаблон:Cite web
  54. 54,0 54,1 54,2 Шаблон:Cite web
  55. Шаблон:Cite web
  56. Шаблон:Cite news
  57. Шаблон:YouTube from Supersized Earth – Episode 1 – BBC One Шаблон:Webarchive
  58. 58,0 58,1 Шаблон:Cite news
  59. Шаблон:Cite newsШаблон:Cbignore,
  60. Шаблон:Cite web
  61. Шаблон:Cite news
  62. Шаблон:Cite news
  63. Шаблон:Cite web
  64. Шаблон:Cite web
  65. Шаблон:Cite web
  66. Шаблон:Cite web
  67. Шаблон:Cite web
  68. Шаблон:Cite news
  69. Шаблон:Cite web
  70. Шаблон:Cite news
  71. Шаблон:Cite news
  72. Шаблон:Cite news
  73. Шаблон:Cite news
  74. Шаблон:Cite news
  75. Шаблон:Cite web
  76. Шаблон:Cite web
  77. Шаблон:Cite news
  78. 78,0 78,1 Шаблон:Cite magazine
  79. Шаблон:Cite news
  80. Шаблон:Cite news
  81. Шаблон:Cite web
  82. Шаблон:Cite news
  83. Шаблон:Cite web
  84. Шаблон:Cite news
  85. Шаблон:Cite magazine
  86. Шаблон:Cite web
  87. Шаблон:Cite news
  88. Шаблон:Cite news
  89. Шаблон:Cite magazine
  90. Шаблон:Cite news
  91. Ошибка цитирования Неверный тег <ref>; для сносок GeoMarc не указан текст
  92. Ошибка цитирования Неверный тег <ref>; для сносок GeoPrac2010-01-04 не указан текст
  93. Шаблон:Cite journal
  94. Шаблон:Cite news
  95. Шаблон:Cite web
  96. Шаблон:Cite journal
  97. Шаблон:Cite journal
  98. Шаблон:Cite journal
  99. Шаблон:Cite web
  100. Шаблон:Cite journal
  101. Шаблон:Cite news
  102. Шаблон:Cite news
  103. Шаблон:Cite web
  104. Шаблон:Cite news
  105. Шаблон:Cite news
  106. 106,0 106,1 Шаблон:Cite news
  107. Шаблон:Cite news
  108. Шаблон:Cite news
  109. Шаблон:Cite news
  110. Шаблон:Cite web
  111. Шаблон:Cite news
  112. Шаблон:Cite news
  113. Шаблон:Cite web
  114. Шаблон:Cite news
  115. Шаблон:Cite magazine
  116. Шаблон:Cite web
  117. Шаблон:Cite web
  118. Шаблон:Cite web
  119. 119,0 119,1 Шаблон:Cite magazine
  120. Шаблон:Cite news
  121. Шаблон:Cite news
  122. Шаблон:Cite news
  123. Шаблон:Cite news
  124. Шаблон:Cite news
  125. Шаблон:Cite web
  126. Шаблон:Cite web
  127. 127,0 127,1 127,2 127,3 127,4 Шаблон:Cite news
  128. Шаблон:Cite news
  129. Шаблон:Cite web
  130. Шаблон:Cite web
  131. 131,0 131,1 Шаблон:Cite web
  132. Шаблон:Cite web
  133. Шаблон:Cite web
  134. Шаблон:Cite web
  135. Шаблон:Cite web
  136. Шаблон:Cite web
  137. Шаблон:Cite web
  138. Шаблон:Cite web
  139. 139,0 139,1 Шаблон:Cite web
  140. Шаблон:Cite web
  141. Шаблон:Cite web
  142. Шаблон:Cite web
  143. Шаблон:Cite web
  144. Шаблон:Cite web
  145. Шаблон:Cite press release
  146. Шаблон:Cite web
  147. Шаблон:Cite web
  148. Шаблон:Cite webVideo documentary about the BASE jump from the Burj Dubai tower.
  149. Шаблон:Cite news
  150. Highest base jump-Nasr Al Niyadi and Omar Al Hegelan sets world record Шаблон:Webarchive. Retrieved 9 January 2010.
  151. Шаблон:Cite news
  152. Шаблон:Cite web
  153. Шаблон:Cite web
  154. Шаблон:Cite videoШаблон:Cbignore
  155. Шаблон:Cite news
  156. Шаблон:Cite web
  157. Шаблон:Cite web
  158. Шаблон:Cite web
  159. Шаблон:Cite web