The CPLP Bridge (Шаблон:Lang-pt, Шаблон:Lang-tet) (known during the construction phase as Comoro Bridges I and II) is a pair of two-lane road bridges in the suco of Шаблон:Interlanguage link, a western suburb of Dili, capital city of East Timor.

Location

The bridge carries Шаблон:Ill across the Comoro River, Шаблон:Cvt north of the Hinode Bridge (Comoro Bridge III).[1]

History

The bridge was built to replace an earlier Comoro Bridge I, a steel framed structure on the same site that had been a vital transport route in Dili,[2][3][4] as it had been the only bridge[5][6]Шаблон:Rp over the main and largest of Dili's four major rivers.[6]Шаблон:Rp[7]Шаблон:Rp

The project for the new bridge was one of a number of infrastructure schemes developed by the Government of East Timor in preparation for the 10th CPLP Summit (Шаблон:Lang-pt), the 10th biennial meeting of heads of state and heads of government of the Community of Portuguese Language Countries (Шаблон:Lang-pt (CPLP)), which was held in Dili on 23 July 2014.[8]

Construction of the new bridge proceeded in two stages.[9] In 2012, the East Timorese Ministry of Public Works initiated the first stage, by engaging a joint venture consisting of an Indonesian State-owned enterprise, Шаблон:Ill, and a local group, the Timorese National Consortium (Шаблон:Lang-pt (CNT)), as contractor to build Comoro Bridge II alongside the existing bridge. Work on that stage began on 1 September 2012 and ended on 31 May 2013, at a contract price of US$8.758 million.[10][2][3]

On 30 May 2013, the Comoro II Bridge was inaugurated by the Prime Minister of East Timor, Xanana Gusmão.[9][10] During his speech at the ceremony, the Prime Minister praised the builders of the bridge, but also criticised those who:

Шаблон:Blockquote

Two days earlier, on 28 May 2013, demolition of the old Comoro Bridge I had started. On 11 October 2013, the same WIKA/CNT joint venture began construction of the replacement Comoro Bridge I. The construction work took until 8 July 2014; its total cost was the higher sum of over US$11.7 million, as it included the installation of a footpath on each of the outward facing sides of the new pair of bridges.[4][11]

On the day on which the replacement Comoro Bridge I was completed, the Minister of Public Works, Шаблон:Ill, announced that the new pair of bridges across the Comoro would be named the CPLP Bridge, in honour of the CPLP.[12] On 22 July 2014, the day before the 10th CPLP Summit, the President of East Timor, Taur Matan Ruak, inaugurated the completed structure as a whole.[13][14] During his speech, the President said that the CPLP Bridge:

Шаблон:Blockquote

Also present at the inauguration ceremony were representatives of the CPLP and of the government of East Timor, including Xanana Gusmão.[13] The other member countries of the CPLP were represented at the ceremony as follows:

Side view of the pylon, and arch with Kaibauk above its apex
Side view of the pylon, and arch with Kaibauk above its apex

At the conclusion of the ceremony, the Bishop of Dili, Dom Alberto Ricardo, blessed the bridge.[13]

After the bridge was opened, an arch extending over both of its roadways, and a Kaibauk mounted above the apex of the arch, were added at the pylon. The cost of these additions was about $3 million.[11]

In early 2019, flooding of the river was observed to have caused degradation and damage to the foundations of some of the bridge piers. In an effort to prevent any further such damage, the Ministry of Public Works has constructed retention dams in the river.[15]

Description

CPLP Bridge is an extradosed bridge with its deck resting on pre-cast I-girders. It is Шаблон:Cvt long, each of its roadways is Шаблон:Cvt wide, and it has a footpath on each side.[9][10][2]

The Avenida carried by the bridge is the main route between central Dili and the west side of the city, including the Presidente Nicolau Lobato International Airport,[1] and the Tibar Bay Port,[1] which went into operation in late 2022.[16][17]

References

Шаблон:Reflist

External links

Шаблон:Commonscat-inline

Шаблон:Portal bar Шаблон:Dili

  1. 1,0 1,1 1,2 Шаблон:Cite web
  2. 2,0 2,1 2,2 Ошибка цитирования Неверный тег <ref>; для сносок wika 2017/03 не указан текст
  3. 3,0 3,1 Шаблон:Cite journal
  4. 4,0 4,1 Шаблон:Cite journal
  5. Шаблон:Cite report
  6. 6,0 6,1 Шаблон:Cite report
  7. Шаблон:Cite thesis
  8. Шаблон:Cite thesis
  9. 9,0 9,1 9,2 Ошибка цитирования Неверный тег <ref>; для сносок sapo 2013-05-30 не указан текст
  10. 10,0 10,1 10,2 Ошибка цитирования Неверный тег <ref>; для сносок tl 2013-05-31 не указан текст
  11. 11,0 11,1 Шаблон:Cite webШаблон:Dead link
  12. Шаблон:Cite news
  13. 13,0 13,1 13,2 13,3 Ошибка цитирования Неверный тег <ref>; для сносок tl 2014-07-22 не указан текст
  14. Шаблон:Cite news
  15. Шаблон:Cite conference
  16. Шаблон:Cite web
  17. Шаблон:Cite news