The Center City Commuter Connection (CCCC), commonly referred to as "the commuter tunnel", is a passenger railroad tunnel in Center City, Philadelphia, Pennsylvania, United States, built to connect the stub ends of the two separate regional commuter rail systems, originally operated by two rival railroad companies: the Pennsylvania Railroad and the Reading Company. All of the SEPTA Regional Rail lines except for the Cynwyd Line pass completely through the four-track tunnel, which contains two underground stations, Suburban Station and Jefferson Station, and the above-ground upper-level concourse for the east–west commuter lines serving 30th Street Station.

Planning and development

Suburban Station, located at 16th Street and JFK Boulevard, was the underground terminus of the commuter rail lines of the Pennsylvania Railroad (PRR). The Reading Company (RDG) ran trains on an elevated approach above city streets into the Reading Terminal, located at 12th and Market Streets (one block west of where Jefferson Station was built). The connection, the first of its kind in the United States, was built to allow trains to run through Philadelphia's downtown central business district, by uniting the commuter lines of the two rail systems.

R. Damon Childs was a junior land planner with the Philadelphia City Planning Commission when he proposed the CCCC to permit through-routing of the Pennsylvania Railroad and the Reading Railroad suburban lines. There already was a Шаблон:Convert subway from 16th Street to 20th Street, a portion of the trackage connecting Suburban Station with 30th Street Station to the west. The tunnel project extended four of Suburban Station's eight tracks Шаблон:Convert eastward. The proposed tunnel addition would pass just north of City Hall and then pass over the Broad Street Subway. The tracks would run under Filbert Street, would then curve to the north after 11th Street, pass under the Ridge Avenue Subway spur line, and run northward under 9th Street, ascending to join the Reading embankment near Spring Garden Street. Underground replacement for Reading Terminal—originally to be called 11th Street Station—was part of the Market East redevelopment project. At first the idea seemed preposterous because it required excavation under Philadelphia City Hall, one of the most massive buildings in the world, but it was nevertheless incorporated by Edmund N. Bacon into the city's 1960 Comprehensive Plan.

Groundbreaking for the tunnel project was on JuneШаблон:Nbsp22, 1978.[1] It took six years to complete at a cost of $330Шаблон:Nbspmillion (equivalent to $Шаблон:Inflation billion in Шаблон:Inflation/year).[2] Federal funds, through the Federal Transit Administration (then called the Urban Mass Transportation Administration), paid for 80Шаблон:Nbsppercent of the project, state funds accounted for 16.66Шаблон:Nbsppercent, and city funds covered the remaining 3.33Шаблон:Nbsppercent. On AprilШаблон:Nbsp28, 1984, a free shuttle service began operating between Suburban Station and Market East Station. Trains on the former PRR lines began providing service through the connection to and from Market East on SeptemberШаблон:Nbsp3, 1984. The last train from Reading Terminal departed on NovemberШаблон:Nbsp6, 1984. After allowing for final track connections to be made, trains from the former Reading Railroad began using the tunnel on NovemberШаблон:Nbsp10, 1984. The Center City Commuter Connection, the four-track (two tracks in both directions) standard-gauge rail link between Suburban Station and the new Market East Station, formally opened for business on NovemberШаблон:Nbsp12, 1984.[2] The old approach to Reading Terminal was then abandoned. It is still mostly present, and is now known as the Reading Viaduct, being actively converted (Phase 1 opened in 2018) to a linear park. The new 11th St has two platforms which are Шаблон:Convert long and Шаблон:Convert wide.[3]

Bernard Goldentyer was the CCCC Project Manager for the City of Philadelphia, making him responsible for coordinating the efforts over a dozen different contracts totaling over $250Шаблон:Nbspmillion. The key to the project was supporting and underpinning Reading Terminal which is a historic structure and keeping all the utilities, including phone lines, in Center City intact while the project was done. In a nod to Chinatown for tolerating the construction, artisans and Masons were brought in from China to create the Chinatown Arch.[4][5]

Approximately 22 trains per hour run per track Шаблон:As of.[6]