Шаблон:Short description Шаблон:Infobox road The Central Susquehanna Valley Thruway (CSVT), also known as the Central Susquehanna Valley Transportation Project, is a partially-completed Шаблон:Convert highway bypass along the U.S. Route 15 (US 15) corridor near Shamokin Dam, Pennsylvania. It has been designated as part of Corridor P-1 of the Appalachian Development Highway System by the Appalachian Regional Commission.[1] When complete, it will carry US 15 and Pennsylvania Route 147 (PA 147) over varying stretches of its length. The project includes the construction of a new bridge over the West Branch Susquehanna River and Шаблон:Convert of new roadway, including a short freeway connection to PA 61.[2] The first phase of the project, connecting US 15 in Winfield with PA 147 near Montandon, opened in August 2022.[3]

History

Near Selinsgrove, PA, U.S. 11/15 are routed along a freeway-grade bypass. However, just north of the town, at Hummels Wharf, the freeway ends at a partially abandoned interchange with U.S. 522. Here, U.S. 11/15 transfers to surface streets. A bypass around the community was originally planned, but the idea was abandoned in 1978 when funding ran out.[4]

Previously, completion of the bypass had been considered as part of a proposal to extend Interstate 83 from its current terminus at Interstate 81 just north of Harrisburg, Pennsylvania to Interstate 86/NY 17 in Corning, New York, but with the establishment of U.S. 15 north of Williamsport, Pennsylvania as part of the future Interstate 99 corridor, this concept was dropped.[5] Without additional reconstruction of U.S. 22/322 and U.S. 11/15 south of Selinsgrove, the farthest I-83 could currently be extended would be just across the Clarks Ferry Bridge (which currently carries U.S. 22/322 across the Susquehanna River) to an at-grade intersection with PA 849 near Duncannon.

Revival

In the mid-2000s, interest in the bypass has been revived as part of a plan for a continuous highway from the Harrisburg area, north to Williamsport. Part of this may be due to the late 2000s emergence of natural gas drilling in the Marcellus shale in the northern tier of the state. Due to the natural gas boom and increased logistical demands associated with it, Mark Murawski of the Route 15 Coalition estimates that traffic will triple along the route.[6] U.S. Route 15 north of Williamport has also been upgraded to interstate standards as a part of the future Interstate 99 resulting in an increase in traffic along the U.S. Route 15 corridor.

Funding

Former Pennsylvania Governor Ed Rendell is reported to have promised $51 million for the project, but his term in office expired before any of the money was allocated. On April 3, 2013, PennDOT announced that the state would commit to allocate $558 million for the project over the following 10 years, pending approval by the General Assembly.[2]

The project was included in the proposed $1.8 billion FY 2014 Pennsylvania transportation budget, however, that budget was not approved, creating further uncertainty for the project.[7] A $2.3 billion budget was later passed by the General Assembly and signed by then-Governor Tom Corbett, granting over $500 million for the Thruway, as well as funding other major transportation projects in the state.[8][9] In December, 2022, the project received $63 million in federal aid from the Infrastructure Investment and Jobs Act (IIJA).[10]

Construction

Файл:TyBot at CSVT River Bridge.jpg
Central Susquehanna Valley Thruway bridge over the Susquehanna River under construction

The project is expected to take approximately 11 years to construct, with an expected completion date of 2027. The first contract, for the bridge over the West Branch Susquehanna River, was awarded in August 2015,[11] with construction of the bridge commencing the following year. This was followed soon after by a second contract for smaller spans north of the main bridge.[12] Construction on the bridge over the West Branch Susquehanna River took place and, as of late 2018, was about 75% complete.[13] In 2020, construction of the bridge was completed.[14] On June 25, 2022, about 6,000 people toured the bridge over the West Branch Susquehanna River bridge via foot and bicycle ahead of it opening to traffic.[15] A ribbon-cutting ceremony to mark the completion of the northern section was held on June 29, 2022, with U.S. Senator Bob Casey Jr., U.S. Representative Fred Keller, and state and local politicians and officials in attendance.[16] The northbound lanes of the northern section of the Central Susquehanna Valley Thruway running from US 15 north across the river to PA 147 opened to traffic on July 7, 2022, with the southbound lanes opening the following day.[17] Construction of the entire northern section will be finished by the end of 2022.[18] With the opening of the northern section, PA 147 was rerouted to follow the Central Susquehanna Valley Thruway to US 15, where it continues south concurrent with US 15 and PA 61 to rejoin its original alignment in Sunbury, while PA 405 was extended south along the former alignment of PA 147 to PA 61 in Sunbury.[19]

Construction of the second phase south of Winfield was delayed when coal ash ponds on the route were found to be unsuitable for supporting surface highway construction. The design was revised to avoid the ash basins; construction of the southern section began in 2022 and be complete by 2027.

Route description

The currently opened section of the highway begins just south of Chillsquaque, where PA 147 had formerly intersected PA 405 and downgraded from the existing divided highway segment to its surface alignment. The CSVT extends the freeway and carries PA 147 across the West Branch Susquehanna River over a new bridge from Northumberland to Union Counties; meanwhile PA 405 has replaced PA 147's old alignment to Sunbury. Over the bridge, the open section of the CSVT terminates at an intersection with U.S. 15 several miles south of Winfield, in Union Township, Union County. From here, PA 147 temporarily continues south concurrently with U.S. 15, then meets its new permanent alignment at the Veterans Memorial Bridge and crosses on that bridge to meet its former alignment in Sunbury.

The section currently under construction continues south from the intersection with U.S. 15. This section will carry U.S. 15 and PA 147 concurrently south to a new trumpet interchange, from which a new spur of the highway will extend PA 61 to the CSVT. This spur will also carry a concurrency with PA 147. South of this interchange, a new freeway carrying U.S. 15 will be built around the western side of the community. The current section of U.S. 11/15 would still carry U.S. 11, but also U.S. 15 Business. The bypass would end at the partially abandoned interchange with U.S. 522, where U.S. 11/15 currently leaves the expressway.[20]

When completed, the CSVT will provide the missing link in the four lane mostly limited access route between Harrisburg and Corning, NY (and by extension, Baltimore, MD and Rochester, NY) aligned with the Susquehanna River.

Exit list

Central Susquehanna Valley Thruway

Шаблон:PAinttop Шаблон:PAint Шаблон:PAint Шаблон:PAint Шаблон:Jctbridge Шаблон:PAint Шаблон:PAint Шаблон:PAintbtm

PA 61 connector

Шаблон:PAinttop Шаблон:PAint Шаблон:PAint Шаблон:Jctbtm

See also

References

Шаблон:Reflist

External links

Шаблон:Commonscat