Шаблон:About Шаблон:Short description Шаблон:Use dmy dates Шаблон:Infobox rail line The Central line is a London Underground line that runs through central London, from Шаблон:Lus, Essex, in the north-east to Шаблон:Lus and Шаблон:Lus in west London. Printed in red on the Tube map, the line serves 49 stations over Шаблон:Convert, making it the longest line on the Underground.[1] It is one of only two lines on the Underground network to cross the Greater London boundary, the other being the Metropolitan line. One of London's deep-level railways, Central line trains are smaller than those on British main lines.

The line was opened as the Central London Railway in 1900, crossing central London on an east–west axis along the central shopping street of Oxford Street to the financial centre of the City of London. It was later extended to the western suburb of Ealing. In the 1930s, plans were created to expand the route into the new suburbs, taking over steam-hauled outer-suburban routes to the borders of London and beyond to the east. These projects were mostly realised after the Second World War, when construction stopped and the unused tunnels were used as air-raid shelters and factories. However, suburban growth was limited by the Metropolitan Green Belt: of the planned expansions one (to Шаблон:Rws, Buckinghamshire) was cut short and the eastern terminus of Шаблон:Rws ultimately closed in 1994 due to low patronage; part of this section between Epping and Ongar later became the Epping Ongar Railway. The Central line has mostly been operated by automatic train operation since a major refurbishment in the 1990s, although all trains still carry drivers. Many of its stations are of historic interest, from turn-of-the-century Central London Railway buildings in west London to post-war modernist designs on the West Ruislip and Hainault branches, as well as Victorian-era Eastern Counties Railway and Great Eastern Railway buildings east of Шаблон:Stn, from when the line to Epping was a rural branch line.

In terms of total passengers, the Central line is the second busiest on the Underground. In 2016/17 over 280 million passenger journeys were recorded on the line.[2] As of 2013, it operated the second-most frequent service on the network, with 34 trains per hour (tph) operating for half-an-hour in the westbound direction during the morning peak, and between 27 and 30 tph during the rest of the peak.[3] The Elizabeth line, which began most of its core operation from 24 May 2022,[4] provides interchanges with the Central line at Stratford, Шаблон:Stn, Шаблон:Lus, Ealing Broadway,[5] and Шаблон:Stn, relieving overcrowding.

History

Central London Railway

Шаблон:Main

Файл:Oxford Circus tube station - Central Line Entrance.jpg
Harry Bell Measures designed the surface buildings for the CLR, such as this one at Oxford Circus.

The Central London Railway (CLR) was given permission in 1891 for a tube line between Shepherd's Bush and a station at Cornhill, and the following year an extension to Liverpool Street was authorised, with a station at Bank instead of at Cornhill.Шаблон:Sfn The line was built following the streets above rather than running underneath buildings, because purchase of wayleave under private properties would have been expensive,Шаблон:Efn and as a result one line runs above another in places, with platforms at different levels at St Paul's, Chancery Lane and Notting Hill Gate stations.Шаблон:Sfn The tunnels were bored with the nominal diameter of Шаблон:Convert, increased on curves, reduced to Шаблон:Convert near to stations.Шаблон:Sfn The tunnels generally rise approaching a station, to aid braking, and fall when leaving, to aid acceleration.Шаблон:Sfn

The Central London Railway was the first underground railway to have the station platforms illuminated electrically.Шаблон:Sfn All the platforms were lit by Crompton automatic electric arc lamps, and other station areas by incandescent lamps. Both the City and South London Railway and the Waterloo and City Railway were lit by gas lamps, primarily because the power stations for these lines were designed with no spare capacity to power electric lighting. With the white glazed tiling, all underground Central London Railway platforms were very brightly lit. The use of electric lighting was further made possible because the Central London was also the first tube railway to use AC electrical distributionШаблон:Efn and the substation transformers were easily able to provide convenient voltages to run the lighting. Earlier tube lines generated DC power at the voltage required to run the trains (500 volts).

The line between Shepherd's Bush and Bank was formally opened on 30 June 1900, public services beginning on 30 July.Шаблон:Sfn With a uniform fare of 2d the railway became known as the "Twopenny Tube".Шаблон:Sfn It was initially operated by electric locomotives hauling carriages, but the locomotive's considerable unsprung weightШаблон:Efn caused much vibration in the buildings above the line, and the railway rebuilt the locomotives to incorporate geared drives. This allowed higher-speed and lighter motors to be used, which reduced the overall weight of the locomotive as well as the unsprung weight. The railway also tried an alternative approach: it converted four coaches to accommodate motors and control gear. Two of these experimental motor coaches were used in a 6-coach train, the control gear being operated by the system used on the Waterloo and City Railway.Шаблон:Efn The modified locomotives were a considerable improvement, but the motor coaches of an even lower weight were much better still. The CLR ordered 64 new motor carsШаблон:Efn designed to use Sprague's recently developed traction control system. The CLR was exclusively using the resulting electric multiple units by 1903.Шаблон:Sfn

In July 1907, the fare was increased to 3d for journeys of more than seven or eight stations. The line was extended westwards with a loop serving a single platform at Wood Lane for the 1908 Franco-British Exhibition. A reduced fare of 1d, for a journey of three or fewer stations, was introduced in 1909, and season tickets became available from 1911. The extension to Liverpool Street opened the following year, providing access to the Great Eastern station and the adjacent Broad Street station by escalators. The Central London Railway was absorbed into the Underground Group on 1 January 1913.Шаблон:Sfn

In 1911, the Great Western Railway won permission for a line from Ealing Broadway to a station near to the CLR's Shepherd's Bush station, with a connection to the West London Railway, and agreement to connect the line to the Central London Railway and for the CLR to run trains to Ealing Broadway. Construction of the extension from the CLR to Ealing Broadway started in 1912Шаблон:Sfn but opening was delayed by World War I. The CLR purchased new rolling stock for the extension, which arrived in 1915 and was stored before being lent to the Bakerloo line. The rolling stock returned when the extension opened in 1920.Шаблон:Sfn

In 1912, plans were published for a railway from Shepherd's Bush to Turnham Green and Gunnersbury,[6] allowing the Central London Railway to run trains on London and South Western Railway (L&SWR) tracks to Richmond. The route was authorised in 1913[7] but work had not begun by the outbreak of war the following year.Шаблон:Sfn In 1919, an alternative route was published, with a tunnelled link to the disused L&SWR tracks south of their Shepherd's Bush station then via Hammersmith (Grove Road) railway station.[8] Authorisation was granted in 1920,[9]Шаблон:Sfn but the connection was never built, and the L&SWR tracks were used by the Piccadilly line when it was extended west of Hammersmith in 1932.Шаблон:Sfn

London Transport and the Second World War

On 1 July 1933, the Central London Railway and other transport companies in the London area were amalgamated to form the London Passenger Transport Board, generally known as London Transport.Шаблон:Sfn The railway was known as the "Central London Line", becoming the "Central line" in 1937.[10]Шаблон:Sfn The 1935–40 New Works Programme included a major expansion of the line.[10] To the west new tracks were to be built parallel with the Great Western Railway's New North Main Line as far as Denham. To the east, new tunnels would run to just beyond Stratford station, where the line would be extended over the London & North Eastern Railway suburban branch to Epping and Ongar in Essex, as well as a new underground line between Leytonstone and Newbury Park mostly under Eastern Avenue so as to serve the new suburbs of north Ilford and the Hainault Loop.Шаблон:Sfn Twenty two level crossings would also be removed, grade separating the line.[10] Platforms at central London stations would also be lengthened to allow for 8-car trains.Шаблон:Sfn

Construction started, the tunnels through central London being expanded and realigned and the stations lengthened, but it proved impossible to modify Wood Lane station to take 8-car trains and a new station at White City was authorised in 1938.Шаблон:Sfn The line was converted to the London Underground four-rail electrification system in 1940.Шаблон:Sfn The positive outer rail is Шаблон:Convert higher than on other lines, because even after reconstruction work the tunnels are slightly smaller.Шаблон:Citation needed Most of the tunnels for the extensions to the east of London had been built by 1940, but work slowed due to the outbreak of the Second World War until eventually being suspended in June.Шаблон:Sfn The unused tunnels between Leytonstone and Newbury Park were equipped by the Plessey Company as an aircraft components factory, opening in March 1942 and employing 2,000 people.Шаблон:Sfn Elsewhere, people used underground stations as night shelters during air raids. The unopened Bethnal Green station had space for 10,000 people. In March 1943, 173 people died there when a woman entering the shelter fell at the bottom of the steps and those following fell on top of her.Шаблон:Sfn

Post war

Файл:Loughton station building.JPG
Loughton station was rebuilt in the 1930s, with a central track accessed by two platforms for the Central line extension. Opening in 1940, it was not served by Central line trains until 1948.Шаблон:Sfn Today, the station is a listed building.[11]

Construction restarted after the war, and the western extension opened as far as Greenford in 1947Шаблон:Sfn and West Ruislip in 1948.Шаблон:Sfn The powers to extend the line to Denham were never used due to post-war establishment of the Green Belt around London, which restricted development of land in the area.Шаблон:Sfn The eastern extension opened as far as Stratford in December 1946, with trains continuing without passengers to reverse in the cutting south of Leyton.Шаблон:Sfn In 1947, the line opened to Leytonstone, and then Woodford and Newbury Park.Шаблон:Sfn Stations from Newbury Park to Woodford via Hainault and from Woodford to Loughton were served by tube trains from 1948.Шаблон:Sfn South of Newbury Park, the west-facing junction with the main line closed in the same year to allow expansion of Ilford carriage depot.Шаблон:Sfn The extension transferred to London Underground management in 1949, when Epping began to be served by Central line trains. The single line to Ongar was served by a steam autotrain operated by British Rail (BR) until 1957, when the line was electrified.Шаблон:Sfn BR trains accessed the line via a link from Temple Mills East to Leyton.Шаблон:Sfn

On 8 April 1953, 12 people were killed and 46 were injured as a result of a rear-end collision in a tunnel just to the east of Stratford station, caused by driver error after a signal failure.[12][13]

The Central line stations east of Stratford kept their goods service for a time, being worked from Temple Mills, with the Hainault loop stations served via Woodford.Шаблон:Sfn The BR line south of Newbury Park closed in 1956Шаблон:Sfn and Hainault loop stations lost their goods service in 1965, the rest of the stations on the line following in 1966. Early morning passenger trains from Stratford (Liverpool Street on Sundays) ran to Epping or Loughton until 1970.Шаблон:Sfn The single-track section from Epping to Ongar was electrified in 1957Шаблон:Sfn and then operated as a shuttle service using short tube trains. However, carrying only 100 passengers a day and losing money, the section closed in 1994, and is now used by the heritage Epping Ongar Railway.Шаблон:Sfn

The entire Central line was shut between January and March 2003, after 32 passengers were injured when a train derailed at Chancery Lane due to a traction motor falling on to the track. The line was not fully reopened until June.Шаблон:Sfn[14] In 2003, the infrastructure of the Central line was partly privatised in a public–private partnership, managed by the Metronet consortium. Metronet went into administration in 2007, and Transport for London (TfL) took over its responsibilities.[15]

Route

Map

Шаблон:Wide image

Railway line

Шаблон:Central Line RDT The Central line is Шаблон:Convert long and serves 49 stations.[1][16] The line is predominantly double-track, widened to three tracks for short sections south of Leytonstone and west of White City; no track is shared with any other line, though some sections do run parallel to other routes. Total track length is Шаблон:Convert, of which Шаблон:Convert is in tunnel;[1][17] this track is electrified with a four-rail DC system: a central conductor rail is energised at −210 V and a rail outside the running rail at +420 V, giving a potential difference of 630 V.[18]

The single-track line north of Epping, which closed in 1994, is now the Epping Ongar heritage railway. Шаблон:As of shuttle services operate at weekends between North Weald and Ongar and North Weald and Coopersale.[19] These do not call at Blake Hall, as the station platform was removed by London Transport after the station closed, and the remaining building is now a private residence.

The section between Leyton and just south of Loughton is the oldest railway alignment in use on the current London Underground system, having been opened on 22 August 1856 by the Eastern Counties Railway (ECR). Loughton to Epping was opened on 24 April 1865 by the ECR's successor, the Great Eastern Railway (GER), along with the section to Ongar. The Hainault Loop was originally the greater part of the Fairlop Loop opened by the GER on 1 May 1903.Шаблон:Sfn

The line has three junctions:

  • Woodford Junction is a flat junction
  • north of Leytonstone the branch to Newbury Park descends into tube tunnels under the older route to Woodford
  • west of North Acton there is another burrowing junction separating the lines to Ealing Broadway and West Ruislip.[17]

The line has the shortest escalator on the London Underground system, at Stratford (previously at Chancery Lane), with a rise of Шаблон:Convert[20] and, at Stratford and Greenford, the only stations where escalators take passengers up to the trains. That at Greenford was the last escalator with wooden treads on the system until it was replaced in March 2014. They were exempt from fire regulations because they were outside the tunnel system.[21]

The line has the shallowest underground Tube platforms on the system, at Redbridge, just Шаблон:Convert below street level, and the sharpest curve, the Caxton Curve, between Shepherds Bush and White City.[1]

List of stations

Open stations

Station Image Distance between stations[22] OpenedШаблон:Sfn or services started Branch Notes
km mi
West Ruislip Шаблон:Rail-interchange Файл:West Ruislip stn building.JPG Шаблон:N/a Шаблон:N/a Шаблон:Dts Ruislip branch Connects with National Rail services. Opened as Ruislip & Ickenham in 1906 by Great Western and Great Central Joint Committee (GW&GCJC), renamed West Ruislip (for Ickenham) in 1947; the suffix was later dropped.Шаблон:Sfn
Ruislip Gardens Файл:Ruislip Gardens stn entrance.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch Opened in 1934 by GW&GCJC, main line services withdrawn 1958.Шаблон:Sfn
South Ruislip Шаблон:Rail-interchange Файл:South Ruislip stn building.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch Connects with National Rail services. Opened as Northolt Junction by GW&GCJC in 1908, renamed South Ruislip & Northolt Junction in 1932, and renamed in 1947.Шаблон:Sfn
Northolt Файл:Northolt station building.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch Replaced a nearby GWR station that had opened in 1907.Шаблон:Sfn
Greenford Шаблон:Rail-interchange Шаблон:Access icon Файл:Greenford station entrance.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch Connects with National Rail services to West Ealing (in bay platform). GWR station opened in 1904.Шаблон:Sfn The station was the last one to retain a wooden escalator, replaced in 2014 by the first incline lift on the Underground.[23]
Perivale Файл:Perivale station building.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch Opened by GWR as "Perivale Halt" in 1904, closed 1915–20; Halt suffix lost in 1922.Шаблон:Sfn
Hanger Lane Файл:Hanger Lane stn building.JPG Шаблон:Cvt Шаблон:Dts Ruislip branch
Ealing Broadway Шаблон:Rail-interchange Шаблон:Rail-interchange Файл:Ealing Broadway stn 8th May 2022 02.jpg Шаблон:N/a Шаблон:N/a Шаблон:Dts Ealing branch Connects with District line, Elizabeth line and National Rail services. Opened by District Railway in 1879, link to main-line station opened in 1965/6.Шаблон:Sfn
West Acton Файл:West Acton stn building.JPG Шаблон:Cvt Шаблон:Dts Ealing branch
North Acton Файл:North Acton stn entrance.JPG Шаблон:Cvt Шаблон:Smalldiv Шаблон:Dts Main route GWR station opened in 1904, moved to its current position in 1913 and closed in 1947.Шаблон:Sfn
Шаблон:Cvt Шаблон:Smalldiv
East Acton Файл:East Acton Tube Station.jpg Шаблон:Cvt Шаблон:Dts Main route Right-hand running ends some distance southeast of the station from White City.
White City Файл:White City stn entrance2.JPG Шаблон:Cvt Шаблон:Dts Main route Connects with Circle and Hammersmith & City lines from Wood Lane. Trains run right-handed through this station
Shepherd's Bush Шаблон:Rail-interchange Шаблон:Rail-interchange Файл:Shepherd's Bush tube stn eastern entrance.JPG Шаблон:Cvt Шаблон:Dts Main route Connects with London Overground and National Rail services from Shepherd's Bush National Rail station. Refurbished in 2008. To the west of the station, right-hand running starts en route to White City.
Holland Park Файл:Holland Park stn building.JPG Шаблон:Cvt Шаблон:Dts Main route
Notting Hill Gate Файл:Notting Hill Gate tube entrance 2020 south.jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Circle and District lines.
Queensway Файл:Queensway tube station.jpg Шаблон:Cvt Шаблон:Dts Main route Opened as Queens Road; renamed 1 September 1946
Lancaster Gate Файл:Lancaster Gate stn entrance.JPG Шаблон:Cvt Шаблон:Dts Main route
Marble Arch Файл:Marble Arch Underground Station.jpg Шаблон:Cvt Шаблон:Dts Main route
Bond Street Шаблон:Access icon Шаблон:Rail-interchange Файл:Bond Street station - entrance on Marylebone Lane.jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Jubilee line and Elizabeth line, the latter since 24 October 2022.
Oxford Circus Файл:Oxford Circus tube station - Central Line Entrance.jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Bakerloo and Victoria lines.
Tottenham Court Road Шаблон:Access icon Шаблон:Rail-interchange Файл:Tottenham court underground station.jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Northern line and Elizabeth line, the latter since 24 May 2022. Opened as Oxford Street; renamed 9 March 1908.
Holborn Файл:Holborn Tube Station - April 2006.jpg Шаблон:Cvt Шаблон:Dts Main route Originally opened as a Piccadilly line station on 15 December 1906, Central line platforms opened later and station renamed Holborn (Kingsway); the suffix was later dropped.
Chancery Lane Файл:Chancery Lane stn northeast entrance.JPG Шаблон:Cvt Шаблон:Dts Main route Renamed Chancery Lane (Gray's Inn) 25 June 1934; the suffix was later dropped
St Paul's Файл:St Paul's stn entrance2.JPG Шаблон:Cvt Шаблон:Dts Main route Opened as Post Office; renamed 1 February 1937. Interchangeable from City Thameslink from walking distance.
Bank Шаблон:Rail-interchange Файл:Bankwbankofengland.jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Circle, District, Northern and Waterloo & City lines and DLR.
Liverpool Street Шаблон:Rail-interchange Шаблон:Rail-interchange Шаблон:Rail-interchange Файл:Liverpool Street Underground concourse entr.JPG Шаблон:Cvt Шаблон:Dts Main route Connects with Circle, Hammersmith & City and Metropolitan lines, London Overground, Elizabeth line and National Rail services.
Bethnal Green Файл:Bethnal Green stn southwest entrance.JPG Шаблон:Cvt Шаблон:Dts Main route
Mile End Файл:Mile End stn entrance.JPG Шаблон:Cvt Шаблон:Dts Main route Cross-platform interchange with District and Hammersmith & City lines. Opened in 1902 for District Railway services.Шаблон:Sfn
Stratford Шаблон:Rail-interchange Шаблон:Rail-interchange Шаблон:Rail-interchange Шаблон:Rail-interchange Шаблон:Access icon Файл:Stratford station (7028902411).jpg Шаблон:Cvt Шаблон:Dts Main route Connects with Jubilee line, London Overground, DLR, Elizabeth line with cross-platform interchange and National Rail services. Opened by Eastern Counties Railway (ECR) in 1839.Шаблон:Sfn
Leyton Файл:Leyton stn building.JPG Шаблон:Cvt Шаблон:Dts Main route Opened as Low Leyton by ECR in 1856, renamed in 1868.Шаблон:Sfn
Leytonstone Файл:Leytonstone Station.jpg Шаблон:Cvt Шаблон:Dts Main route Opened by ECR in 1856.Шаблон:Sfn
Wanstead Файл:Wanstead Underground station, entrance.jpg Шаблон:Cvt Шаблон:Smalldiv Шаблон:Dts Hainault loop Used during the war as an air-raid shelter and the tunnels as a munitions factory for Plessey electronics.
Redbridge Файл:Redbridge station entrance east.JPG Шаблон:Cvt Шаблон:Dts Hainault loop During the war, the completed tunnels at Redbridge were used by the Plessey company as an aircraft parts factory.
Gants Hill Файл:Gants Hill stn southwest entrance.JPG Шаблон:Cvt Шаблон:Dts Hainault loop During the war, it was used as an air-raid shelter and the tunnels as a munitions factory for Plessey electronics.
Newbury Park Шаблон:Access icon Файл:Newbury Park Tube station.jpg Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Ilford to Woodford Fairlop Loop line.Шаблон:Sfn
Barkingside Файл:Barkingside station building.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Fairlop Loop, closed 1916–19.Шаблон:Sfn
Fairlop Файл:Fairlop station building.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Fairlop Loop.Шаблон:Sfn
Hainault Шаблон:Access icon Файл:Hainault stn building.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Fairlop Loop, closed 1908–30.Шаблон:Sfn
Grange Hill Файл:Grange Hill stn entr.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Fairlop Loop.Шаблон:Sfn
Chigwell Файл:Chigwell stn building.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Opened 1903 on the GER Fairlop Loop.Шаблон:Sfn
Roding Valley Шаблон:Access icon Файл:Roding Valley stn building.JPG Шаблон:Cvt Шаблон:Dts Hainault loop Trains continue to Woodford. Opened 1936 by the LNER on the Fairlop Loop.Шаблон:Sfn
Snaresbrook Файл:Snaresbrook station building.JPG Шаблон:Cvt Шаблон:Smalldiv Шаблон:Dts Epping branch Opened as Snaresbrook & Wanstead by ECR in 1856, renamed Snaresbrook for Wanstead in 1929, renamed for the transfer to the Central line.Шаблон:Sfn
South Woodford Шаблон:Access icon Файл:South Woodford entrance west.JPG Шаблон:Cvt Шаблон:Dts Epping branch Opened by ECR in 1856 as George Lane, and renamed South Woodford (George Lane) in 1937, current name from 1950. "(George Lane)" still appears on some of the platform roundels.Шаблон:Sfn
Woodford Шаблон:Access icon Файл:Woodford Station.jpg Шаблон:Cvt Шаблон:Smalldiv Шаблон:Dts Epping branch/
Hainault loop
Opened by ECR in 1856.Шаблон:Sfn
Шаблон:Cvt Шаблон:Smalldiv
Buckhurst Hill Шаблон:Access icon Файл:Buckhurst Hill stn building.JPG Шаблон:Cvt Шаблон:Smalldiv Шаблон:Dts Epping branch Opened as a single line by ECR in 1856, moved slightly when line doubled in 1881/2.Шаблон:Sfn
Loughton Файл:Loughton station building.JPG Шаблон:Cvt Шаблон:Dts Epping branch Opened by ECR in 1856, moved when line was extended to Ongar in 1865, and again in 1940.Шаблон:Sfn
Debden Шаблон:Access icon Файл:Debden Tube Station.jpg Шаблон:Cvt Шаблон:Dts Epping branch Opened by GER in 1865 as Chigwell Road, renamed Chigwell Lane later the same year. Closed 1916–19, named changed when transferred to Central line.Шаблон:Sfn
Theydon Bois Файл:Theydon Bois stn building.JPG Шаблон:Cvt Шаблон:Dts Epping branch Opened by GER in 1865 as Theydon, renamed later the same year.Шаблон:Sfn
Epping Шаблон:Access icon Файл:Epping station building2.JPG Шаблон:Cvt Шаблон:Dts Epping branch Opened by GER in 1865.Шаблон:Sfn

Former stations

Rolling stock

Former rolling stock

Файл:Central London Railway 1903 stock motor car.png
Illustration of Bank station in 1903 showing the original electric multiple units

When the railway opened in 1900, it was operated by electric locomotives hauling carriages with passengers boarding via lattice gates at each end. The locomotives had a large unsprung mass, which caused vibrations that could be felt in the buildings above the route. After an investigation by the Board of Trade, by 1903 the carriages had been adapted to run as trailers and formed with new motor cars into electric multiple units.Шаблон:Sfn The Central London Railway trains normally ran with six cars, four trailers and two motor-cars, although some trailers were later equipped with control equipment to allow trains to be formed with 3 cars.Шаблон:Sfn Work started in 1912 on an extension to Ealing Broadway, and new more powerful motor-cars were ordered. These arrived in 1915, but completion of the extension was delayed because of World War I, and the cars stored. In 1917, they were lent to the Bakerloo line, where they ran on the newly opened extension to Watford Junction. Returning in 1920/21, and formed with trailers converted from the original carriages, they became the Ealing Stock.Шаблон:Sfn In 1925–28, the trains were rebuilt, replacing the gated ends with air-operated doors, allowing the number of guards to be reduced to two.Шаблон:Sfn After reconstruction of the Central London Railway tunnels, the trains were replaced by Standard Stock transferred from other lines and the last of the original trains ran in service in 1939.Шаблон:Sfn

Файл:Epping Station auto-train geograph-2988854-by-Ben-Brooksbank.jpg
Standard Stock behind a steam autotrain service at Epping in 1957

The Standard Stock ran as 6-car trains until 1947, when 8-car trains became possible after Wood Lane was replaced by a new station at White City. More cars were transferred from other lines as they were replaced by 1938 Stock.Шаблон:Sfn In the early 1960s, there was a plan to re-equip the Piccadilly line with new trains and transfer its newer Standard Stock to the Central line to replace the older cars there, some of which had been stored in the open during the Second World War and were becoming increasingly unreliable.Шаблон:Sfn However, after the first deliveries of 1959 Stock were running on the Piccadilly it was decided to divert this stock to the Central line, together with extra non-driving motor cars to lengthen the trains from 7-car to 8-car. 1962 Stock was ordered to release the 1959 Stock for the Piccadilly line. The last Standard Stock train ran on the Central line in 1963,Шаблон:Sfn and by May 1964 all 1959 Stock had been released to the Piccadilly line.Шаблон:Sfn

The single track section from Epping to Ongar was not electrified until 1957, prior to which the service was operated by an autotrain, carriages attached to a steam locomotive capable of being driven from either end, hired from British Railways, and an experimental AEC three-car lightweight diesel multiple unit operated part of the shuttle service Monday-Friday in June 1952.Шаблон:Sfn Upon electrification, 1935 Stock was used,Шаблон:Sfn until replaced by four-car sets of 1962 Stock specially modified to cope with the limited current.Шаблон:Citation needed The section closed in 1994, and is now the heritage Epping Ongar Railway.

A shuttle operated on the section from Hainault to Woodford after a train of 1960 Stock was modified to test the automatic train operation system to be used on the Victoria line. As each 1967 Stock train was delivered, it ran in test for three weeks on the shuttle service.Шаблон:Sfn

Current rolling stock

When the signalling on the Central line needed replacement by the late 1980s, it was decided to bring forward the replacement of the 1962 Stock, due at about the time as the replacement of the 1959 Stock. The signalling was to be replaced with an updated version of the Automatic Train Operation (ATO) system used on the Victoria line, the line traction supply boosted and new trains built.Шаблон:Sfn Prototype trains were built with two double and two single doors hung on the outside of each carriage of the train, and with electronic traction equipment that gave regenerative and rheostatic braking.Шаблон:Sfn

In accordance with this plan, the first 8-car trains of 1992 Stock entered service in 1993,Шаблон:Sfn[24] and while the necessary signalling works for ATO were in progress, One Person Operation (OPO) was phased in between 1993 and 1995.Шаблон:Sfn Automatic train protection was commissioned from 1995 to 1997 and ATO from 1999 to 2001, with a centralised control centre in West London.[1]

The trains are currently undergoing a refurbishment programme known as CLIP (Central Line Improvement Programme). The trains will have passenger information displays, wheelchair areas and CCTV installed. The programme, which includes updating motors, lighting, doors and seats, is being carried out at a new Train Modification Unit (TMU) in Acton and was expected to complete in late 2023.[25] However in November 2020 TfL revealed this had been delayed, with expected completion by the end of 2025.[26]

Future rolling stock

Шаблон:Main articles In the mid 2010s, TfL began a process of ordering new rolling stock to replace trains on the Piccadilly, Central, Bakerloo and Waterloo & City lines.[27] TfL explained that the 1992 Stock used on the Central and Waterloo & City lines was significantly less reliable than more modern rolling stock.[27][28] A feasibility study into the new trains showed that new generation trains and re-signalling could increase capacity on the Central line by 25%, with 36 trains per hour.[27]

In June 2018, the Siemens Mobility Inspiro design was selected.[29] These trains would have an open gangway design, wider doorways, air conditioning and the ability to run automatically with a new signalling system.[30] TfL could only afford to order Piccadilly line trains at a cost of £1.5bn.[31] However, the contract with Siemens includes an option for 100 trains for the Central line in the future.[32] This would take place after the delivery of the Piccadilly line trains in the 2030s.[30]

Depots

There are three depots: Ruislip, Hainault and White City.[33] White City depot first opened in 1900 when the initial line went into operation; Ruislip and Hainault depots were completed in 1939. During the Second World War, anti-aircraft guns were made at Ruislip Depot and the U.S. Army Transportation Corps assembled rolling stock at Hainault between 1943 and 1945.Шаблон:Sfn As part of the construction of the Westfield London shopping centre, the depot at White City was replaced underground, opening in 2007.[34]

Services

During the off-peak, services on the Central line are grouped by branch lines: trains on the West Ruislip branch run to/from Epping, while trains to/from Ealing Broadway run on the Hainault Loop. Services at peak times are less structured, and trains can run between any two terminus stations at irregular intervals (e.g. from Ealing Broadway to Epping).[35]

Шаблон:As of, the typical off-peak service, in trains per hour (tph), is:[35]

The above services combine to give a total of 24 trains per hour each way (one every 2 minutes and 30 seconds) in the core section between White City and Leytonstone. At peak times, the frequency increases further, with up to 35 trains per hour each way in the core section.

A 24-hour Night Tube service began on the Central line on 19 August 2016, running on Friday and Saturday nights.[36] Night tube services are:

  • 3tph between Ealing Broadway and Hainault (via Newbury Park)
  • 3tph between White City and Loughton

Peak-time frequency

In September 2013, the frequency in the morning peak period was increased to 35 trains per hour, giving the line the most intensive train service in the UK at the time.[37] Before that date, the Victoria line held the record with 33 trains per hour; it regained it in May 2017 with an increased frequency of 36 trains per hour (one every 100 seconds) during peak periods.[38]

Proposed and cancelled extensions

Hillingdon

The Central crosses over the Metropolitan and Piccadilly lines' shared Uxbridge branch near West Ruislip depot, and a single track linking the two routes was laid in 1973. In the 2010s, the London Borough of Hillingdon has lobbied TfL to divert some or all Central trains along this to Uxbridge, as West Ruislip station is located in a quiet suburb and Uxbridge is a much more densely populated regional centre. TfL has stated that the link will be impossible until the Metropolitan line's signalling is upgraded in 2017.[39]

Additional stations

The Central line runs directly below Shoreditch High Street station and an interchange has been desired locally since it opened in 2010. The station would lie between Liverpool Street and Bethnal Green, one of the longest gaps between stations in inner London. Although there would be benefits to this interchange, it was ruled out on grounds of cost, the disruption it would cause to the Central line while being built and because the platforms would be too close to sidings at Liverpool Street and would not be developed until after the Crossrail-developed Elizabeth line is fully operational.[40]

The developers of the First Central business park at Park Royal, west London, were planning a new station between North Acton and Hanger Lane. This would have served the business park and provided a walking distance interchange with Park Royal station on the Piccadilly line.[41] This is not being actively pursued; London Underground said that the transport benefits of a Park Royal station on the Central line are not sufficiently high to justify the costs of construction.[42]

Harlow extension

In 2021, Harlow District Council proposed extending the line from its eastern terminus in Epping to Harlow. They argued this would reduce travel times to Epping and London, and help with efforts to add 19,000 new homes to the town and expand the population to 130,000. However, no funding has been allocated for this proposed extension.[43]