Changchun Rail Transit, is the rapid transit and light rail system in the city of Changchun, Jilin Province, China. Its first line, Line 3, is the first true light rail line in Mainland China. The system consists of three light rail lines and two rapid transit lines.
Construction of the first heavy-rail metro line, Line 1, started in 2011, and opened for service on 30 June 2017. Line 1 serves 15 stations and is Шаблон:Convert long.[1] Construction on the second heavy-rail metro line, Line 2, started in 2012, and opened for service on 30 August 2018. Line 2 serves 21 stations and is Шаблон:Convert long.[2]A new light rail line link the North Lake area, numbered Line 8, opened for service on June 30, 2018, 16 years after Line 3 opened. Line 8 is the first light rail line using the same fare with the metro system, and the first line to directly interchange with the metro system. Шаблон:Cn On May 30, 2019, the fare systems of the original light rail system (Line 3 and Line 4) and the new metro system (Line 1, Line 2 and Line 8) were combined, and passengers can directly transfer between the original light rail system and the new metro system.Шаблон:Cn
The current total length the network is Шаблон:Convert[3] with 100 stations. 3 sections of 3 lines are under construction.Шаблон:Citation needed
Network
Шаблон:Collapsible list |
Line | Terminals (District) |
Commencement | Newest Extension |
Length km |
Stations | ||
---|---|---|---|---|---|---|---|
Шаблон:Rint | Шаблон:Rint | Шаблон:Stl (Kuancheng) |
Шаблон:Stl (Nanguan) |
2017 | - | 18.14[1] | 15 |
Шаблон:Rint | Шаблон:Rint | Шаблон:Stl (Luyuan) |
Шаблон:Stl (Erdao) |
2018 | 2021 | 24.9[2] | 21 |
Шаблон:Rint | Шаблон:Rint | Шаблон:Stl (Kuancheng) |
Шаблон:Stl (Nanguan) |
2002 | 2021 | 34.3 | 32 |
Шаблон:Rint | Шаблон:Stl (Kuancheng) |
Шаблон:Stl (Nanguan) |
2011 | 2023 | 20.8[3] | 20 | |
Шаблон:Rint | Шаблон:Stl (Kuancheng) |
Шаблон:Stl (Kuancheng) |
2018 | - | 13.3[4] | 12 | |
Total | 111.2[3] | 100 |
Line 1
Line 1 is the first heavy metro line Changchun, running in the north south axis of Changchun. Line 1's color is red.
Line 2
Line 2 is the second metro line in Changchun, running in the east west axis of Changchun. Line 2's color is blue.
Line 3
Line 3 was the first rail line to open. It is a light rail line in a S shape through Changchun, using low-floor light rail vehicles instead of the typical rapid transit cars. Unlike later lines, the line is not fully grade separated, having four level crossings. Line 3's color is green.
Line 4
Line 4 is another light rail line. Unlike line 3, it has complete grade separation, but still uses low-floor light rail vehicles, similar to the Seville Metro in Spain. It runs north south, mostly on elevated viaducts with an underground section in the north. Line 4's color is purple.
Line 8
Line 8 is another light rail line. Like line 4, it is fully grade separated, but unlike line 4 is fully elevated instead of running partially underground, running entirely on viaducts. Line 8's color is teal.
Opening timeline
- 30 October 2002: Шаблон:Rint Changchun Railway Station - Weiguang Street
- 26 December 2006: Шаблон:Rint Weiguang Street - Changchun Movie Wonderland
- 30 June 2011: Шаблон:Rint Dongdaqiao Bridge - Tiangong Road
- 7 May 2012: Шаблон:Rint Changchun Railway Station (North) - Dongdaqiao Bridge
- 30 June 2017: Шаблон:Rint North Ring Road - Hongzuizi
- 30 August 2018: Шаблон:Rint Shuangfeng - Dongfang Square
- 30 October 2018: Шаблон:Rint North Ring Road - Guangtong Road
- 8 October 2021: Шаблон:Rint Shuangfeng - Qiche Gongyuan
- 31 December 2021: Шаблон:Rint Changchun Railway Station - Puppet Regime Palace Museum
- 6 June 2023: Шаблон:Rint Tiangong Road - Tianxin Road
Future development
The Phase 3 (2019-2024) expansion of Changchun Rail Transit was approved by the NDRC on November 30, 2018. According to the plan, Changchun Rail Transit will be Шаблон:Cvt in length in 2024.[5][6]
Under construction
- June 2024: Шаблон:Rint: Шаблон:Cvt with 22 stations. Heavy rail.[7][8]
- 2025: Шаблон:Rint (Eastern extension): Шаблон:Cvt with 6 stations.[9]
- April 2025: Шаблон:Rint (Phase 1): Шаблон:Cvt with 19 stations. Changchun International Automobile Park – East Ring Road. Heavy rail.[10]
- June 2025: Шаблон:Rint (Airport line): Шаблон:Cvt (Шаблон:Cvt underground, Шаблон:Cvt elevated) with 8 stations. Zhaojiagang East – Jiutai South railway station. Heavy rail.[11]
- 2027: Шаблон:Rint (Phase 1): Шаблон:Cvt with 18 stations. Southwestern Hub – Dongdaqiao Bridge. Heavy rail.[12]
Planned
- Шаблон:Rint (Southern extension): Шаблон:Cvt with 2 stations. Changchun Movie Wonderland – Changchun No.59 Middle School. Light rail.[6]
See also
References
External links
Шаблон:Rapid transit in the People's Republic of China Шаблон:Jilin transit Шаблон:Rapid transit in Asia
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Changchun Rail Transit
- Transport in Changchun
- 2002 establishments in China
- Railway lines opened in 2002
- 750 V DC railway electrification
- 1500 V DC railway electrification
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии