The Changping Line of the Beijing Subway (Шаблон:Zh) is a rapid transit line in northern Beijing. It is Шаблон:Convert[1] in length with 20 stations (18 stations in operation). Changping line's color is pink.

Route

Шаблон:Unreferenced section The Changping Line runs parallel to, and to the east of, the Badaling Expressway, passing near Shahe and Nanshao.

Stations (North to South)

Service Routes:

  • Regular: Changping Xishankou – Шаблон:Stl
  • Short rush hour: Shahe Univ. Park – Шаблон:Stl
  • Middle rush hour: Changping Dongguan – Шаблон:Stl, with Beishaowa bypassed in the morning (○)
  • Long rush hour (▲△): Шаблон:Stl → Changping Xishankou, with some trains bypassing Gonghuacheng; only available in the morning[2]
  • Some trains before or after rush hours, and near the last train: Шаблон:Stl → Zhuxinzhuang, then return to the Dingsilu Depot
Service Route[3] Station Name[4][5] Connections Nearby Bus Stops Distance
Шаблон:Small[6][7]
Location
Шаблон:Small Шаблон:Small
Шаблон:Stl Шаблон:Large Шаблон:Small 0.000 0.000 Changping
Шаблон:Stl Шаблон:Large Шаблон:Small 1.213 1.213
Шаблон:Stl Шаблон:Large Шаблон:Small 3.508 4.721
Шаблон:Stl Шаблон:Large Шаблон:Small 2.433 7.154
Шаблон:Stl Шаблон:Large Шаблон:Small 1.683 8.837
Шаблон:Stl Шаблон:Large Шаблон:Small 1.958 10.795
Шаблон:Stl Шаблон:Large Шаблон:Small 5.357 16.152
Шаблон:Stl Шаблон:Large Шаблон:Small 1.964 18.116
Шаблон:Stl Шаблон:Large Шаблон:Small 2.025 20.141
Шаблон:Stl Шаблон:Large Шаблон:Rint Шаблон:Small 3.799 23.940
Шаблон:Stl Шаблон:Nowrap Шаблон:Small 2.367 26.307
Шаблон:Stl Шаблон:Large Шаблон:Rint Шаблон:Small 5.440 31.747 Haidian
Шаблон:Stl Шаблон:Large Шаблон:RintШаблон:Nowrap
Шаблон:Nowrap
Шаблон:Small 1.546 33.293
Шаблон:Stl[5]Шаблон:Efn Шаблон:Large 1.652 34.945
Шаблон:Stl[5] Шаблон:Large Шаблон:Small 1.158 36.103
Шаблон:Stl[5] Шаблон:Large Шаблон:Small 2.366 38.469
Шаблон:Stl Шаблон:Large Шаблон:Rint Шаблон:Small 1.683 40.152
Шаблон:Stl Шаблон:Large Шаблон:Small 1.312 41.464
Шаблон:Stl Шаблон:Large Шаблон:Rint Шаблон:Small 1.481 42.945
Шаблон:StlШаблон:Efn Шаблон:Large Шаблон:RouteBox

Шаблон:Notelist

Opening timeline

The line started construction in 2009. In September 2010, construction of Phase I was completed, and was followed by a three-month test run. Phase I of the line opened on December 30, 2010, and ran north from the Xi'erqi station on Line 13 to Nanshao station.[8] It connects the central Changping District with the Beijing subway network.[9]

On December 26, 2015, Phase II of the line opened, extending the line northwards to the Ming Tombs Scenic Area and terminating at Changping Xishankou station.

On December 31, 2021, the one-station extension to Шаблон:Stl opened.

On February 4, 2023, the extension to Шаблон:Stl opened.[1] (Шаблон:Stl station was not opened)

Segment Commencement Length Station(s) Name
Nanshao — Xi'erqi 30 December 2010 Шаблон:Convert[10] 7 Phase 1
Changping Xishankou — Nanshao 26 December 2015 Шаблон:Convert[11] 5 Phase 2
Xi'erqi — Qinghe Railway Station 31 December 2021 Шаблон:Convert 1 South extension
Qinghe Railway Station — Xitucheng 4 February 2023[1] Шаблон:Convert[1][12] 5
Xitucheng — Jimenqiao To be determined Шаблон:Convert 1
Zhufangbei To be determined Infill station 1

Future development

Through service with Line 8

Through service between Line 8 and Changping line via Zhuxinzhuang station is under planning.[13][14]

South extension (section 1) to Jimenqiao

The southern extension to Jimenqiao station is Шаблон:Cvt in length,[15] including a Шаблон:Cvt elevated section and a Шаблон:Cvt underground section.[16] The extension will add 8 underground stations to the line.[15] The one-station extension to Шаблон:Stl opened on December 31, 2021, and the section between Qinghe railway station and Шаблон:Stl opened on February 4, 2023, with 5 new stations.[1][12] The opening date of Шаблон:Stl station and Шаблон:Stl station (interchange to Line 12) has not been announced yet.

South extension (section 2) to Xueyuannanlu

A further southern extension to Xueyuannanlu is planned. It will interchange with Line 9 and Line 13A at Xueyuannanlu station (formerly known as Mingguangqiaoxi station).[17][18] This extension is still under planning and construction has not started.[19]

History

Файл:Gonghuasheng rail.jpg
The stretch of Changping line, south of Gonghuacheng station.

The planned route of the Changping Line was chosen from three alternatives. The other original options placed the southern terminus of the line at the Beijing North railway station, near Line 2 at Xizhimen, or at Huoying, with transfers to Line 8 and Line 13. One original alternative plan set Phase II at Шаблон:Convert, with one extra station beyond the Ming Tombs.[20]

On January 5, 2009, the Changping District government signed land clearing contracts with townships along routes through Huilongguan, Shahe, and Nanshao, marking the official beginning of Phase I construction.[9] Phase I was set to be completed by the end of 2010, and Phase II was scheduled for completion by 2012.[9]

On September 19, 2010, the line commenced trial running with empty cars.[21]

On December 30, 2010, Phase I of the line entered into operation.

On December 26, 2015, Phase II of the line entered into operation, extending the line north underground for another 5 stations.

On December 31, 2021, a one-station extension to Шаблон:Stl opened.

On February 4, 2023, the extension to Шаблон:Stl opened.[1]

Ridership

During rush hours, in 2013, the section between Life Science Park and Xi'erqi Stations was the most congested section in the Beijing subway network, operating at 132% capacity.[22]

Accident

Шаблон:Main

On December 14, 2023, two Changping line trains collided between Xi'erqi station and Life Science Park station, causing one of the carriages broke apart, at least 515 people onboard were injured.[23][24][25][26] The service between Xi'erqi and Zhuxinzhuang station was suspended due to the accident. On December 16, the full service on Changping line resumed.[27]

Rolling stock

Model Image Manufacturer Year Built Amount in Service Fleet Numbers Depot Notes
SFM13 Файл:CP002 entering Xi'erqi (20220405165111).jpg CRRC Qingdao Sifang 2009
2019
32 CP 001–CP 032 Shisanling Jingqu (Ming Tombs)
Dingsilu
12 cars (CP0241-CP0246, CP0321-CP0326) wrecked on December 14, 2023.
SFM93/BDK07 Файл:CP067 entering Xi'erqi (20220405180509).jpg CRRC Qingdao Sifang
Beijing Subway Rolling Stock Equipment
2021 36 CP 033–CP 068 Shisanling Jingqu (Ming Tombs)
Dingsilu

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:Beijing transit Шаблон:Beijing Subway Station