Шаблон:Short description Шаблон:Infobox Public transit The Changzhou Metro is a rapid transit system in Changzhou, Jiangsu province, China. The system started operation on 21 September 2019, with the opening of its first line, Line 1 becoming the 35th city in China with a subway in Mainland China.[1] The Changzhou metro currently has Line 1 and Line 2 in operation, while Line 5 is still under construction.[2]

Announcements are made in Mandarin and English.

Lines in operation

Файл:Changzhou Metro Route Map.png
Line Terminals
(District)
Commencement Length
km
Stations
Шаблон:RouteBox Шаблон:Stl
(Xinbei)
Шаблон:Stl
(Wujin)
21 September 2019 34.24[3] 29
Шаблон:RouteBox Шаблон:Stl
(Zhonglou)
Шаблон:Stl
(Wujin)
28 June 2021 19.79[4] 15
Total 54.03 44

Line 1

Шаблон:Main Line 1 started operation on 21 September 2019.[1] Construction for Line 1 began on 28 October 2014. The first phase runs from Шаблон:Stl (Шаблон:Lang) in the north to Шаблон:Stl (Шаблон:Lang) in the south. It is Шаблон:Convert[3] in length with 29 stations, including 27 underground and 2 elevated. The line will be extended North for 3.5 km and South for 3.2 km.[5]

In its first year of operation, the highest passenger flow in a single day was 243,000 on October 2 and total ridership in 2019 was 10.3 million.[6]

Line 2

Шаблон:Main Construction for Line 2 began on 13 February 2017.[7] It is Шаблон:Convert[4][7] in length with 15 stations, from Шаблон:Stl to Шаблон:Stl.[7] It was opened on 28 June 2021.[4]

Planned

Short term

Line Construction start Estimate opening Section Stations Length References
Шаблон:Rint (North ext.) Forest Park - Chunjiang 2 3.5 [5]
Шаблон:Rint (South ext.) Nanxiashu - Changzhou South railway station 2 3.2 [5]
Шаблон:Rint (West ext.) Hexi - Qingfeng Park 7 8.6 [5]
Шаблон:Rint (East ext.) Wuyi Lu - Qishuyan railway station 4 5.0 [5]
Шаблон:Rint Lanyuewan - Dongqing 25 31.4 [5]
Шаблон:Rint Wujin Yanjiang railway station - Jianye Lu 25 34.0 [5]

Long term

According to the "Changzhou Urban Rail Transit Construction Plan (2011~2018)", the urban rail transit network of Changzhou City planned by 2050 consists of 6 lines.[8]

Line Construction start Estimate opening Section Stations Length References
Шаблон:Rint Changzhou North railway station(metro) - Lijia
Шаблон:Rint Photovoltaics Industry Part - Jianhu Parking

Fares

Changzhou Metro has a starting price of 2 yuan, a starting mileage of 5 kilometers, and an upgrade mileage of "5, 5, 7, 7, 9" kilometers, and an increase of 1 yuan for each level. Namely: the fare of less than 5 kilometers (inclusive) is 2 yuan, the fare of 5-10 (inclusive) kilometers is 3 yuan, the fare of 10-15 (inclusive) kilometers is 4 yuan, and the fare is 15-22 (inclusive) kilometers. 5 yuan, 6 yuan fare for 22-29 (inclusive) kilometers, an increase of 1 yuan for every 9 kilometers above 29 kilometers.[9]

Trains

Trains for the first phase were manufactured by CRRC Nanjing Puzhen. The trains used by Changzhou Rail Transit Line 1 are Type B cars. Each train is 6 cars and is composed of 4 motor cars and 2 trailer cars. The first phase of the project ordered 36 trainsets. A 6 car set has a total length of about Шаблон:Convert and trains are Шаблон:Convert wide, the maximum operating speed is Шаблон:Cvt, each car has 4 pairs of Шаблон:Convert wide doors on each side. The maximum passenger capacity of each train is 2062 people. At the same time, the train adopts lightweight aluminum alloy material with a service life of 30 years.[10]

Network map

Шаблон:Rapid transit OSM map

References

Шаблон:Reflist

Шаблон:Southern Jiangsu transit Шаблон:Urban rail transit in China

  1. 1,0 1,1 Ошибка цитирования Неверный тег <ref>; для сносок cz0921 не указан текст
  2. Шаблон:Cite web
  3. 3,0 3,1 Шаблон:Cite web
  4. 4,0 4,1 4,2 Шаблон:Cite web
  5. 5,0 5,1 5,2 5,3 5,4 5,5 5,6 Шаблон:Cite web
  6. Шаблон:Cite web
  7. 7,0 7,1 7,2 Шаблон:Cite web
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite web