The Charing Cross, Euston and Hampstead Railway (CCE&HR), also known as the Hampstead Tube, was a railway company established in 1891 that constructed a deep-level underground "tube" railway in London.Шаблон:Refn Construction of the CCE&HR was delayed for more than a decade while funding was sought. In 1900 it became a subsidiary of the Underground Electric Railways Company of London (UERL), controlled by American financier Charles Yerkes. The UERL quickly raised the funds, mainly from foreign investors. Various routes were planned, but a number of these were rejected by Parliament. Plans for tunnels under Hampstead Heath were authorised, despite opposition by many local residents who believed they would damage the ecology of the Heath.
When opened in 1907, the CCE&HR's line served 16 stations and ran for Шаблон:Convert[1] in a pair of tunnels between its southern terminus at Charing Cross and its two northern termini at Archway and Golders Green. Extensions in 1914 and the mid-1920s took the railway to Edgware and under the River Thames to Kennington, serving 23 stations over a distance of Шаблон:Convert.[1] In the 1920s the route was connected to another of London's deep-level tube railways, the City and South London Railway (C&SLR), and services on the two lines were merged into a single London Underground line, eventually called the Northern line.
Within the first year of opening, it became apparent to the management and investors that the estimated passenger numbers for the CCE&HR and the other UERL lines had been over-optimistic. Despite improved integration and cooperation with the other tube railways, and the later extensions, the CCE&HR struggled financially. In 1933 the CCE&HR and the rest of the UERL were taken into public ownership. Today, the CCE&HR's tunnels and stations form the Northern line's Charing Cross branch from Kennington to Camden Town, the Edgware branch from Camden Town to Edgware, and the High Barnet branch from Camden Town to Archway.
Establishment
Origin, 1891–1893
In November 1891, notice was given of a private bill that would be presented to Parliament for the construction of the Hampstead, St Pancras & Charing Cross Railway (HStP&CCR).[2] The railway was planned to run entirely underground from Heath Street, Hampstead to Strand in Charing Cross. The route was to run beneath Hampstead High Street, Rosslyn Hill, Haverstock Hill and Chalk Farm Road to Camden Town and then under Camden High Street and Hampstead Road to Euston Road. The route then continued south, following Tottenham Court Road, Charing Cross Road and King William Street (now William IV Street) to Agar Street adjacent to Strand. North of Euston Road, a branch was to run eastwards from the main alignment under Drummond Street to serve the main line stations at Euston, St Pancras and King's Cross.Шаблон:Sfn Stations were planned at Hampstead, Belsize Park, Chalk Farm, Camden Town, Seymour Street (now part of Eversholt Street), Euston Road, Tottenham Court Road, Oxford Street, Agar Street, Euston and King's Cross.Шаблон:Sfn Although a decision had not been made between the use of cable haulage or electric traction as the means of pulling the trains, a power station was planned on Chalk Farm Road close to the London and North Western Railway's Chalk Farm station (later renamed Primrose Hill) which had a coal depot for deliveries.Шаблон:Sfn
The promoters of the HStP&CCR were inspired by the recent success of the City and South London Railway (C&SLR), the world's first deep-tube railway. This had opened in November 1890 and had seen large passenger numbers in its first year of operation.Шаблон:Refn Bills for three similarly inspired new underground railways were also submitted to Parliament for the 1892 legislative session, and, to ensure a consistent approach, a Joint Select Committee was established to review the proposals. The committee took evidence on various matters regarding the construction and operation of deep-tube railways, and made recommendations on the diameter of tube tunnels, method of traction, and the granting of wayleaves. After preventing the construction of the branch beyond Euston, the Committee allowed the HStP&CCR bill to proceed for normal parliamentary consideration. The rest of the route was approved and, following a change of the company name, the bill received royal assent on 24 August 1893 as the Charing Cross, Euston, and Hampstead Railway Act, 1893.[3]
Search for financing, 1893–1903
Although the company had permission to construct the railway, it still had to raise the capital for the construction works. The CCE&HR was not alone; four other new tube railway companies were looking for investors – the Baker Street and Waterloo Railway (BS&WR), the Waterloo & City Railway (W&CR) and the Great Northern & City Railway (GN&CR) (the three other companies that put forward bills in 1892) and the Central London Railway (CLR, which had received assent in 1891).Шаблон:Refn Only the W&CR, which was the shortest line and was backed by the London and South Western Railway with a guaranteed dividend, was able to raise its funds without difficulty.Шаблон:Sfn For the CCE&HR and the rest, much of the remainder of the decade saw a struggle to find investors in an uninterested market. A share offer in April 1894 had been unsuccessful and in December 1899 only 451 out of the company's 177,600 £10 shares had been part sold to eight investors.[4]
Like most legislation of its kind, the act of 1893 imposed a time limit for the compulsory purchase of land and the raising of capital.Шаблон:Refn To keep the powers granted by the act alive, the CCE&HR submitted a series of further bills to Parliament for extensions of time. Extensions were granted by the Charing Cross Euston and Hampstead Railway Acts, 1897,[5] 1898,[6] 1900,[7] and 1902.[8]
A contractor was appointed in 1897, but funds were not available and no work was started.Шаблон:Sfn In 1900, foreign investors came to the rescue of the CCE&HR: American financier Charles Yerkes, who had been lucratively involved in the development of Chicago's tramway system in the 1880s and 1890s, saw the opportunity to make similar investments in London. Starting with the purchase of the CCE&HR in September 1900 for £100,000, he and his backers purchased a number of the unbuilt tube railways, and the operational but struggling Metropolitan District Railway (MDR).Шаблон:Refn
With the CCE&HR and the other companies under his control, Yerkes established the UERL to raise funds to build the tube railways and to electrify the steam-operated MDR. The UERL was capitalised at £5 million with the majority of shares sold to overseas investors.Шаблон:Refn Further share issues followed, which raised a total of £18 million (equivalent to approximately £Шаблон:Formatprice today)Шаблон:Inflation-fn to be used across all of the UERL's projects.Шаблон:Refn
Deciding the route, 1893–1903
While the CCE&HR raised money, it continued to develop the plans for its route. On 24 November 1894, a bill was announced to purchase additional land for stations at Charing Cross, Oxford Street, Euston and Camden Town.[9] This was approved as the Charing Cross, Euston and Hampstead Railway Act, 1894 on 20 July 1895.[10] On 23 November 1897, a bill was announced to change the route of the line at its southern end to terminate under Craven Street on the south side of Strand.[11] This was enacted as the Charing Cross, Euston and Hampstead Railway Act, 1898 on 25 July 1898.[6]
On 22 November 1898, the CCE&HR published another bill to add an extension and to modify part of the route.[12] The extension was a branch from Camden Town to Kentish Town where a new terminus was planned as an interchange with the Midland Railway's Kentish Town station. Beyond the terminus, the CCE&HR line was to come to the surface for a depot on vacant land to the east of Highgate Road (occupied today by the Ingestre Road Estate). The modification changed the Euston branch by extending it northwards from Euston to connect to the main route at the south end of Camden High Street. The section of the main route between the two ends of the loop was omitted. Included in the bill were powers to purchase a site in Cranbourn Street for an additional station (Leicester Square). It received royal assent as the Charing Cross, Euston and Hampstead Railway Act, 1899 on 9 August 1899.[13]
On 23 November 1900, the CCE&HR announced its most wide-ranging modifications to the route. Two bills were submitted to Parliament, referred to as No. 1 and No. 2. Bill No. 1 proposed the continuation of the railway north from Hampstead to Golders Green, the purchase of land and properties for stations and the construction of a depot at Golders Green. Also proposed were minor adjustments to route alignments previously approved.[14]Шаблон:Sfn Bill No. 2 proposed two extensions: from Kentish Town to Brecknock Road, Archway Tavern, Archway Road and Highgate in the north and from Charing Cross to Parliament Square, Artillery Row and Victoria station in the south.[15]Шаблон:Sfn
The extension to Golders Green would take the railway out of the urban and suburban areas and into open farmland. While this provided a convenient site for the CCE&HR's depotШаблон:Refn it is believed that underlying the decision was Yerkes' plan to profit from the sale of development land previously purchased in the area that would rise in value when the railway opened.Шаблон:Refn
The CCE&HR's two bills were submitted to Parliament at the same time as a large number of other bills for underground railways in the capital.Шаблон:Refn As it had done in 1892, Parliament established a joint committee under Lord Windsor to review the bills.Шаблон:Sfn By the time the committee had produced its report, the parliamentary session was almost over and the promoters of the bills were asked to resubmit them for the following 1902 session.Шаблон:Sfn Bills No. 1 and No. 2 were resubmitted in November 1901 together with a new bill – bill No. 3. The new bill modified the route of the proposed extension to Golders Green and added a short extension running beneath Charing Cross main line station to the Victoria Embankment where it would provide an interchange with the existing MDR station (then called Charing Cross).[16]
The bills were again examined by a joint committee, this time under Lord Ribblesdale.Шаблон:Refn The sections which dealt with the proposed north-eastern extension from Archway Tavern to Highgate and the southern extension from Charing Cross to Victoria were deemed to not comply with parliamentary standing orders and were struck-out.Шаблон:SfnШаблон:Refn
Hampstead Heath controversy
A controversial element of the CCE&HR's plans was the extension of the railway to Golders Green. The route of the tube tunnels took the line under Hampstead Heath and strong opposition was raised, concerned about the effect that the tunnels would have on the ecology of the Heath. The Hampstead Heath Protection Society claimed that the tunnels would drain the sub-soil of water and the vibration of passing trains would damage trees. Taking its lead from the Society's objections, The Times published an alarmist article on 25 December 1900 claiming that "a great tube laid under the heath will, of course, act as a drain; and it is quite likely that the grass and gorse and trees on the Heath will suffer from the loss of moisture ... Moreover, it seems to be established beyond question that the trains passing along these deep-laid tubes shake the earth to its surface, and the constant jar and quiver will probably have a serious effect upon the trees by loosening their roots."[17]
In fact, the tunnels were to be excavated at a depth of more than Шаблон:Convert below the surface,Шаблон:Sfn the deepest of any on the London Underground.Шаблон:Sfn In his presentation to the joint committee, the CCE&HR's counsel disparagingly refuted the objections: "Just see what an absurd thing! Disturbance of the water when we are 240 feet down in the London clay – about the most impervious thing you can possibly find; almost more impervious than granite rock! And the vibration on this railway is to shake down timber trees! Could anything be more ludicrous than to waste the time of the Committee in discussing such things presented by such a body!"[18]
A second railway company, the Edgware & Hampstead Railway (E&HR), also had a bill before Parliament which proposed tunnels beneath the Heath as part of its planned route between Edgware and Hampstead.[19] The E&HR had planned to connect to the CCE&HR at Hampstead but, to avoid the needless duplication of tunnels between Golders Green and Hampstead, the two companies agreed that the E&HR would instead connect to the CCE&HR at Golders Green.Шаблон:Sfn
The Metropolitan Borough of Hampstead had initially objected to the line but gave consent on the condition that a station be constructed between Hampstead and Golders Green to provide access for visitors to the Heath. A new station was added to the plans at the northern edge of the Heath at North End where it could also serve a new residential development planned for the area.Шаблон:Refn Once Parliament was satisfied that the extension would not damage the Heath, the CCE&HR bills jointly received royal assent on 18 November 1902 as the Charing Cross, Euston and Hampstead Railway Act, 1902.[8] On the same date, the E&HR bill received its assent as the Edgware and Hampstead Railway Act, 1902.[8]
Construction, 1902–1907
With the funds available from the UERL and the route decided, the CCE&HR started site demolitions and preparatory works in July 1902. On 21 November 1902, the CCE&HR published another bill which sought compulsory purchase powers for additional buildings for its station sites, planned the take-over of the E&HR and abandoned the permitted but redundant section of the line from Kentish Town to the proposed depot site near Highgate Road.[20]Шаблон:Refn This bill was approved as the Charing Cross, Euston and Hampstead Railway Act, 1903 on 21 July 1903.[21]
Tunnelling began in September 1903.Шаблон:Sfn Stations were provided with surface buildings designed by architect Leslie Green in the UERL house-style.Шаблон:Sfn This consisted of two-storey steel-framed buildings faced with red glazed terracotta blocks with wide semi-circular windows on the upper floor.Шаблон:Refn Each station was provided with two or four lifts and an emergency spiral staircase in a separate shaft.Шаблон:Refn
While construction proceeded, the CCE&HR continued to submit bills to Parliament. The Charing Cross, Euston and Hampstead Railway Act, 1904, which received assent on 22 July 1904, granted permission to buy additional land for the station at Tottenham Court Road, for a new station at Mornington Crescent and for changes at Charing Cross.[22][23] The Charing Cross, Euston and Hampstead Railway Act, 1905 received assent on 4 August 1905.[24][25] It dealt mainly with the acquisition of the subsoil under part of the forecourt of the South Eastern Railway's Charing Cross station so that the CCE&HR's station could be excavated during the 3 months closure following the recent roof collapse.Шаблон:Refn
The sale of the building land at North End to conservationists to form the Hampstead Heath extension in 1904, meant a reduction in the number of residents who might use the station there. Work continued below ground at a reduced pace, and the platform tunnels and some passenger circulation tunnels were excavated, but North End station was abandoned in 1906 before the lift and stair shafts were dug and before a surface building was constructed.Шаблон:Sfn
Tunnelling was completed in December 1905, after which work continued on the construction of the station buildings and the fitting-out of the tunnels with tracks and signalling equipment.Шаблон:Sfn As part of the UERL group, the CCE&HR obtained its electricity from the company's Lots Road Power Station, originally built for the electrification of the MDR; the proposed Chalk Farm generating station was not built. The final section of the approved route between Charing Cross and the Embankment was not constructed, and the southern terminus on opening was Charing Cross. After a period of test running, the railway was ready to open in 1907.
Opening
The CCE&HR was the last of the UERL's three tube railways to open and was advertised as the "Last Link".Шаблон:Sfn The official opening on 22 June 1907 was made by David Lloyd George, President of the Board of Trade, after which the public travelled free for the rest of the day.Шаблон:Sfn[26] From its opening, the CCE&HR was generally known by the abbreviated names Hampstead Tube or Hampstead Railway and the names appeared on the station buildings and on contemporary maps of the tube lines.[27][28]
The railway had stations at:
- Charing Cross
- Leicester Square
- Oxford Street (now Tottenham Court Road)
- Tottenham Court Road (now Goodge Street)
- Euston Road (now Warren Street)
- Euston
- Mornington Crescent
- Camden Town
Golders Green branch
Highgate branch
- South Kentish Town (closed 1924)Шаблон:Sfn
- Kentish Town
- Tufnell Park
- Highgate (now Archway)
The service was provided by a fleet of carriages manufactured for the UERL by the American Car and Foundry Company and assembled at Trafford Park in Manchester.Шаблон:Sfn These carriages were built to the same design used for the BS&WR and the GNP&BR and operated as electric multiple unit trains without the need for separate locomotives. Passengers boarded the trains via folding lattice gates at each end of cars which were operated by Gate-men who rode on the outside platform and announced station names as trains arrived. The design became known on the Underground as the 1906 stock or Gate stock.
Co-operation and consolidation, 1907–1910
Despite the UERL's success in financing and constructing the Hampstead Railway in only seven years, its opening was not the financial success that had been expected. In the Hampstead Tube's first twelve months of operation it carried 25 million passengers, just half of the 50 million that had been predicted during the planning of the line.Шаблон:Sfn The UERL's pre-opening predictions of passenger numbers for its other new lines proved to be greatly over-optimistic, as did the improvement in passenger numbers expected on the newly electrified MDR – in each case achieving only around fifty per cent of their targets.Шаблон:Refn
The lower than expected passenger numbers were partly due to competition between the tube and sub-surface railway companies, but the introduction of electric trams and motor buses, replacing slower, horse-drawn road transport, took a large number of passengers away from the trains. The problem was not limited to the UERL; all of London's seven tube lines and the sub-surface MDR and Metropolitan Railway were affected to a degree and the reduced revenues generated from the lower numbers of passengers made it difficult for the UERL and the other railways to pay back the capital borrowed and pay dividends to shareholders.Шаблон:Sfn
In an effort to improve the financial situation, the UERL together with the C&SLR, the CLR and the GN&CR began, from 1907, to introduce fare agreements. From 1908, they began to present themselves through common branding as the Underground.Шаблон:Sfn The W&CR was the only tube railway that did not participate in the arrangement as it was owned by the mainline London and South Western Railway.
The UERL's three tube railway companies were still legally separate entities with their own management and shareholder and dividend structures. There was duplicated administration between the three companies and, to streamline the management and reduce expenditure, the UERL announced a bill in November 1909 that would merge the Hampstead Tube, the Piccadilly Tube and the Bakerloo Tube into a single entity, the London Electric Railway (LER), although the lines retained their own individual branding.[29]Шаблон:Refn The bill received assent on 26 July 1910 as the London Electric Railway Amalgamation Act 1910 (10 Edw. 7. & 1 Geo. 5. c. xxxii).[30]
Extensions
Embankment, 1910–1914
In November 1910, the LER published notice of a bill to revive the unused 1902 permission to continue the line from Charing Cross to Embankment.[31] The extension was planned as a single tunnel, running in a loop under the Thames, connecting the ends of the two existing tunnels. Trains were to run in one direction around the loop stopping at a single-platform station constructed to provide an interchange with the BS&WR and MDR at Embankment station.Шаблон:SfnШаблон:Refn The bill received assent as the London Electric Railway Act, 1911 on 2 June 1911.[32] The loop was constructed from a large excavation north-west of the MDR station and was connected to the sub-surface line with escalators.Шаблон:Sfn The station opened on 6 April 1914Шаблон:Sfn as:
- Charing Cross (Embankment) (now Embankment)Шаблон:Refn
Hendon and Edgware, 1902–1924
In the decade after the E&HR received royal assent for its route from Edgware to Hampstead, the company continued to search for finance and revised its plans in conjunction both with the CCE&HR and a third railway company, the Watford & Edgware Railway (W&ER) which had plans to build a line linking the E&HR to Watford.
Following the enactment of the Watford and Edgware Railway Act, 1906,[33] the W&ER briefly took over the powers of the E&HR to construct the line from Golders Green to Edgware. Struggling to find funds, the W&ER attempted a formal merger with the E&HR through a bill submitted to Parliament in 1906,[34] with the intention of constructing and operating the whole of the route from Golders Green to Watford as a light railway but the bill was rejected by Parliament and, when the W&ER's powers lapsed, control returned to the CCE&HR.Шаблон:Sfn
The E&HR company had remained in existence and had obtained a series of acts to preserve and develop its plans. The Edgware and Hampstead Railway Acts, 1905,[35] 1909[36] and 1912[37] granted extensions of time, approved changes to the route, gave permissions for viaducts and a tunnel and allowed the closure and re-routeing of roads to be crossed by the railway's tracks. It was intended that the CCE&HR would provide and operate the trains and this was formalised by the London Electric Railway Act, 1912,[37] which approved the LER's take over of the E&HR.
No immediate effort was made to start the works and they were postponed indefinitely when World War I started. With wartime restrictions in place, construction work for the railway was prevented. Yearly extensions to the earlier E&HR acts were granted under special wartime powers each year from 1916 until 1922, giving a final date by which compulsory purchases had to be made of 7 August 1924.[38] Although the permissions had been maintained, the UERL could not raise the money needed for the works. Construction costs had increased considerably during the war years and the returns produced by the company could not cover the cost of repaying loans.Шаблон:Sfn
The project was made possible when the government introduced the Trade Facilities Act 1921 by which the Treasury underwrote loans for public works as a means of alleviating unemployment. With this support, the UERL raised the funds and work began on extending the Hampstead tube to Edgware. The UERL group's Managing Director/Chairman, Lord Ashfield, ceremonially cut the first sod to begin the works at Golders Green on 12 June 1922.[39]
The extension crossed farmland, meaning it could be constructed on the surface more easily and cheaply than a deep tube line below the surface. A viaduct was constructed across the Brent valley and a short section of tunnel was required at The Hyde, Hendon. Stations were designed in a suburban pavilion style by the UERL's architect Stanley Heaps.Шаблон:Sfn The first section opened on 19 November 1923Шаблон:Sfn with stations at: Шаблон:Clear left
- Brent (now Brent Cross)
- Hendon Central
The remainder of the extension opened on 18 August 1924Шаблон:Sfn with stations at:
- Colindale
- Burnt Oak (opened 27 October 1924)Шаблон:Sfn
- Edgware
Kennington, 1922–1926
On 21 November 1922, the LER announced a bill for the 1923 parliamentary session. It included the proposal to extend the line from its southern terminusШаблон:Refn to the C&SLR's station at Kennington where an interchange would be provided.[40] The bill received royal assent as the London Electric Railway Act, 1923 on 2 August 1923.[41]
The work involved the rebuilding of the below ground parts of the CCE&HR's former terminus station to enable through running and the loop tunnel was abandoned. Tunnels were extended under the Thames to Waterloo station and then to Kennington where two additional platforms were constructed to provide the interchange to the C&SLR. Immediately south of Kennington station, the CCE&HR tunnels connected to those of the C&SLR. The new service was opened on 13 September 1926 to coincide with the opening of the extension of the C&SLR to Morden.Шаблон:Sfn The Charing Cross to Kennington link had stations at:
The C&SLR had been under the control of the UERL since its purchase by the group in 1913.Шаблон:Refn An earlier connection between the CCE&HR and the C&SLR had been opened in 1924 linking the C&SLR's station at Euston with the CCE&HR's at Camden Town. With the opening of the Kennington extension, the two railways began to operate as an integrated service using the newly built Standard Stock trains. On tube maps the combined lines were shown in a single colour although the separate names continued in use into the 1930s.Шаблон:Refn
Move to public ownership, 1923–1933
Despite improvements made to other parts of the network,Шаблон:Refn the Underground railways were still struggling to make a profit. The UERL's ownership of the highly profitable London General Omnibus Company (LGOC) since 1912 had enabled the UERL group, through the pooling of revenues, to use profits from the bus company to subsidise the less profitable railways.Шаблон:Refn However, competition from numerous small bus companies during the early 1920s eroded the profitability of the LGOC and had a negative impact on the profitability of the whole UERL group.
In an effort to protect the UERL group's income Lord Ashfield lobbied the government for regulation of transport services in the London area. Starting in 1923, a series of legislative initiatives were made in this direction, with Ashfield and Labour London County Councillor (later MP and Minister of Transport) Herbert Morrison, at the forefront of debates as to the level of regulation and public control under which transport services should be brought. Ashfield aimed for regulation that would give the UERL group protection from competition and allow it to take substantive control of the LCC's tram system; Morrison preferred full public ownership.Шаблон:Sfn After seven years of false starts, a bill was announced at the end of 1930 for the formation of the London Passenger Transport Board (LPTB), a public corporation that would take control of the UERL, the Metropolitan Railway and all bus and tram operators within an area designated as the London Passenger Transport Area.[42] The Board was a compromise – public ownership but not full nationalisation – and came into existence on 1 July 1933. On this date, the LER and the other Underground companies were liquidated.Шаблон:Sfn
Legacy
Шаблон:For Finding a suitable name for the combined CCE&HR and C&SLR routes proved a challenge for the LPTB and a number of variations were used including Edgware, Morden & Highgate Line in 1933 and Morden-Edgware Line in 1936.[43] In 1937, Northern line was adopted in preparation for the uncompleted Northern Heights plan.[43][44] Today, the Northern line is the busiest on the London Underground system, carrying 206.7 million passengers annually,[44] a level of usage which led it to be known as the Misery line during the 1990s due to overcrowding and poor reliability.[45][46]
Notes and references
Notes
References
Bibliography
Шаблон:Refend Шаблон:UERL Шаблон:Northern line navbox Шаблон:Authority control
- ↑ 1,0 1,1 Length of line calculated from distances given at Шаблон:Cite web
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:Cite journal
- ↑ Шаблон:London Gazette
- ↑ 6,0 6,1 Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ 8,0 8,1 8,2 Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:Cite news (registration required). Quoted, with slight differences, in Шаблон:Harvnb
- ↑ Quoted in Шаблон:Harvnb
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Report of the opening - Шаблон:Cite news (registration required).
- ↑ Шаблон:LTM archive – London Transport Museum photographic archive. Retrieved 27 May 2008.
- ↑ 1908 tube map Шаблон:Webarchive – A History of the London Tube Maps. Retrieved 27 May 2008.
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ 37,0 37,1 Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:LTM archive – London Transport Museum photographic archive. Retrieved 27 May 2008.
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ Шаблон:London Gazette
- ↑ 43,0 43,1 Tube maps from 1933 Шаблон:Webarchive, 1936 Шаблон:Webarchive and 1939 Шаблон:Webarchive, showing the changing names of the line from Шаблон:Cite web
- ↑ 44,0 44,1 Шаблон:Cite web
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Predecessor companies of the London Underground
- Railway companies established in 1891
- Railway lines opened in 1907
- Railway companies disestablished in 1933
- Transport in the London Borough of Barnet
- Transport in the London Borough of Camden
- Transport in the London Borough of Lambeth
- Transport in the London Borough of Southwark
- Transport in the City of Westminster
- Underground Electric Railways Company of London
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии