China General Nuclear Power Group (CGN) (Шаблон:Zh), formerly China Guangdong Nuclear Power Group (Шаблон:Zh), is a Chinese state-owned energy corporation[1] under the SASAC of the State Council.

In China, CGN operates nuclear plants at Daya Bay Nuclear Power Plant, Ling Ao Nuclear Power Plant, Hongyanhe Nuclear Power Plant and Ningde Nuclear Power Plant, with five new nuclear power stations under construction and another two planned.[1] CGN operates in wind energy and solar energy, as well as hydroelectricity. Шаблон:As of CGN operates power generation plant of the following capacities: nuclear 8.3 GW, wind 4.7 GW, hydro 4.0 GW and solar 600 MW.[1]

CGN has been sanctioned by the United States for attempting to acquire advanced U.S. nuclear technology to divert to military uses in China.[2][3] In November 2020, Donald Trump issued an executive order prohibiting any American company or individual from owning shares in companies that the United States Department of Defense has listed as having links to the People's Liberation Army, which included CGN. CGN's proposals to operate two nuclear plants in the UK have received criticism from MPs as a potential threat to national security.[4][5]

History

China Guangdong Nuclear Power Holding Co., Ltd. (CGNPC) was established in September 1994 with a registered capital of RMB 10.2 billion with nuclear power as its core business. With CGNPC as its core enterprise, China Guangdong Nuclear Power Group (CGNPG) comprises more than twenty wholly owned or controlling subsidiaries.

In April 2009, a fund run by China Guangdong Nuclear Power Group signed a deal raising US$1.03 billion for nuclear and related energy projects. Guangdong Nuclear's fund, the first industrial fund set up by a state-owned enterprise with approval from the State Council signed the fund-raising agreement with Bank of China, China Development Bank and other institutions, which will become shareholders in the fund. The financing is the first of two phases for the fund, which plans to raise a total of 10 billion yuan.[6]

In May 2013, the organization changed its name to China General Nuclear Power Group (CGN) to signify that its operations extend beyond Guangdong province.[7]

In December 2014, CGN raised $3 billion by an initial public offering (IPO) in Hong Kong.[8][9]

In December 2014, the firm announced it was acquiring three wind farms in the UK with a combined capacity of 73 megawatts from British energy company EDF Energy for a fee estimated to be in the region of £100 million.[10]

In November 2015, the company and its subsidiaries agreed to acquire 1Malaysia Development Berhad's energy assets, worth around $2.3 billion.[11] The transaction was part of the wider 1Malaysia Development Berhad scandal which resulted in billions of dollars being stolen from the Government of Malaysia and the arrest of Malaysian Prime Minister Najib Razak for corruption and fraud[12]

In 2016, the United States Department of Justice charged CGN with stealing nuclear secrets from the United States.[13][14][15] The Guardian reported: "According to the US Department of Justice, the FBI has discovered evidence that China General Nuclear Power (CGN) has been engaged in a conspiracy to steal US nuclear secrets stretching back almost two decades. Both CGN and one of the corporation’s senior advisers, Szuhsiung Ho, have been charged with conspiring to help the Chinese government develop nuclear material in a manner that is in clear breach of US law."[16]

U.S. sanctions

Шаблон:Further In August 2019, the U.S. Department of Commerce added CGN to its Entity List, barring U.S. companies from selling products to CGN. In its reasoning, the United States Department of Commerce explained that CGN attempted to acquire advanced U.S. nuclear technology to divert to military uses in China".[2][17] The Chinese state-owned China Daily claimed that, "[T]he real aim is to try to thwart the country’s 'Made in China 2025' and was part of the US-China trade war".[18] In September 2021, the Nuclear Regulatory Commission suspended shipments of nuclear materials to CGN on national security grounds.[19]

Reactor designs

CGN's first nuclear station uses reactors designed and built by the French National Company, Framatome, specifically the M310 plants at Daya Bay Plant.

CPR-1000

Шаблон:Main On the basis of the M310, CGN developed an improved Generation II pressurized water reactor called CPR-1000.[20] CPR-1000 takes a large proportion in all the reactors being built in China. The M310 uses as its base design units 5 & 6 of the Gravelines Nuclear Power Station in France.[21]

The CPR-1000 has a 1086 MWe capacity, a three-loop design and 157 fuel assemblies (active length 12ft), enriched to 4.5% U-235. The fuel assembly design is AREVA's 17x17 AFA 3G M5, which can be fabricated in China. Other features include has a design life that could extend beyond 40 years and an 18-month fuel cycle. It has a digital instrumentation and control system, and is equipped with hydrogen recombiners and containment spray pumps.[22]

Some CPR-1000 intellectual property rights are retained by Areva, which limits overseas sales potential.[23]

ACPR-1000

Шаблон:Main In 2010, CGNPG announced a further design evolution to a Generation III level, the ACPR-1000, which would also replace intellectual property right-limited components from the CPR-1000. CGNPG aimed to be able to independently market the ACPR-1000 for export by 2013.[24] CGNPG has been conducting the development work in cooperation with Dongfang Electric, Shanghai Electric, Harbin Electric, China First Heavy Industries and China Erzhong.[25]

The core of the ACPR1000 comprises 157 fuel assemblies (active length 14ft) and has a design life of 60 years.[26] Other features include a core catcher and double containment as additional safety measures[27] and ten major technical improvements over its predecessor the CPR-1000. It was the first Chinese reactor to have a domestically developed digital control system.[28]

Hualong One

Шаблон:Main In 2012, central planners in Beijing directed China General Nuclear (CGN) and the other large nuclear builder and operator, CNNC to 'rationalise' their Generation III reactor design programs. This meant CGN's ACPR1000 and CNNC's ACP1000, both of which were based on the French Generation II M310, were 'merged' into one standardised design - the Hualong One.[23] After the merger, both companies retain their own supply chain and their versions of the Hualong One will differ slightly (units built by CGN will retain some features from the ACPR1000) but the design is considered to be standardised. Some 85% of its components will be made domestically.[29]

The Hualong One power output will be 1170 MWe gross, 1090 MWe net, with a 60-year design life, and would use a combination of passive and active safety systems with a double containment.[30] It has a 177 assembly core design with an 18-month refuelling cycle. The power plant's utilisation rate is as high as 90%. CNNC has said its active and passive safety systems, double-layer containment and other technologies meet the highest international safety standards.[31]

Hualong Two

Шаблон:Main CNNC plans to start building Hualong Two by 2024. It will be a more economical version using similar technology, taking a year less to build with about a quarter less in construction costs.[32]

EPR

In November 2007, CGN signed a contract with Areva to build Taishan nuclear station with Areva's EPR, making the company among the first to build a nuclear station with generation III reactors.[33]

Nuclear stations

Operating stations:

  1. Daya Bay Nuclear Power Plant,
  2. Ling Ao Nuclear Power Plant,
  3. Ningde Nuclear Power Plant phase I,
  4. Hongyanhe Nuclear Power Plant phase I,
  5. Yangjiang Nuclear Power Station,
  6. Taishan Nuclear Power Plant,

Under construction: Hongyanhe Nuclear Power Plant phase II,[34] Ningde Nuclear Power Plant phase II,

Planned: Lufeng Nuclear Power Plant,[35] Xianning Nuclear Power Plant (entering early construction),[36] Wuhu Nuclear Power Plant[37] and Jiangsu's Second Nuclear Power Project[38]

See also

References

Шаблон:Reflist

External links

Шаблон:Power companies of China Шаблон:Nuclear power in China Шаблон:Portal bar

  1. Перейти обратно: 1,0 1,1 1,2 Шаблон:Cite web
  2. Перейти обратно: 2,0 2,1 Шаблон:Cite web
  3. Шаблон:Cite web
  4. Шаблон:Cite news
  5. Шаблон:Cite news
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite news
  9. Шаблон:Cite news
  10. Шаблон:Cite press release
  11. Шаблон:Cite web
  12. Шаблон:Cite news
  13. Шаблон:Cite news
  14. Шаблон:Cite news
  15. Шаблон:Cite news
  16. Шаблон:Cite news
  17. Шаблон:Cite web
  18. Шаблон:Cite news
  19. Шаблон:Cite news
  20. Шаблон:Cite web
  21. Шаблон:Cite web
  22. Шаблон:Cite web
  23. Перейти обратно: 23,0 23,1 Шаблон:Cite web
  24. Шаблон:Cite news
  25. Шаблон:Cite news
  26. Шаблон:Cite web
  27. Шаблон:Cite news
  28. Шаблон:Cite news
  29. Шаблон:Cite web
  30. Шаблон:Cite journal
  31. Шаблон:Cite web
  32. Шаблон:Cite news
  33. Шаблон:Cite news
  34. Hongyanhe 1 enters commercial operation Шаблон:Webarchive. World Nuclear News (07 June 2013). Retrieved 19 May 2014
  35. Agreement for building Lufeng AP1000s Шаблон:Webarchive. World Nuclear News (30 September 2013). Retrieved 19 May 2014
  36. Nuclear power plants mulled in Hubei Шаблон:Webarchive. China Daily. (06 April 2009). Xinhua. Retrieved 19 May 2014
  37. Wuhu Nuclear Power Company issued Wuhu NPP environmental impact report Nuclear Power News. (12 January 2010) Dynabond Powertech Service. Retrieved 19 May 2014.
  38. Nexans awarded 9 million Euro cable contract for China’s Tianwan nuclear power plant Шаблон:Webarchive. Nexans (26 September 2013, Paris). Retrieved 19 May 2014