Английская Википедия:Chinggis Khaan International Airport

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:For Шаблон:Short description Шаблон:Redirect Шаблон:Infobox airport Chinggis Khaan International AirportШаблон:Efn Шаблон:Airport codes, also referred to as New Ulaanbaatar International Airport,[1]Шаблон:Efn is the primary airport serving Ulaanbaatar, and is Mongolia's only international airport. It opened on 4 July 2021,[2][3][4][5][6][7] replacing Buyant-Ukhaa International Airport.

It is the largest air facility in the country, serving as a hub for all major Mongolian airlines, and is located in the Khöshig Valley of Sergelen, Töv Province, 52 km south of Ulaanbaatar and 20 km southwest of Zuunmod. The airport is connected via highway to Ulaanbaatar, with shuttle bus routes operating to and from various points in the city.[8] It features direct flights to 11 domestic destinations and various international destinations in Asia and Europe.

In 2023, it served about 1.7 million domestic and international passengers.[9]

Name

The new airport was given its current name on 2 July 2020, with the former Chinggis Khaan International Airport reverting to its pre-2005 name of Buyant-Ukhaa International Airport.[10] Chinggis Khaan is a transliteration of the modern Mongolian pronunciation of Genghis Khan.

The airport was referred to by various names during its planning and construction phases, including New Ulaanbaatar International Airport[11]Шаблон:Efn and Khöshig (or Khöshigt) Valley Airport.Шаблон:Efn

History

Ulaanbaatar's former main airport, Buyant-Ukhaa International Airport, established in 1957, is located in close proximity to two mountains to its south and east, so only one end of its runway was able to be used, and was often adversely affected by weather events.[12] The new airport was designed with a capacity of handling up to 1,100 passengers per hour[3][4] and three million passengers per year,[13] with cargo capacity set at 11,900 tons.[14][15]

Its development was majority funded by a Japanese government (JICA) soft loan (93%), with the rest provided by the Mongolian government.[16]

Development

Initial planning for the airport was done in 2006 with Japanese government assistance.[17]

In May 2008, a Шаблон:JPY (Шаблон:USD) 40-year soft loan agreement at 0.2% interest was signed between the Government of Mongolia and the Japan Bank for International Cooperation to build a new international airport.[5][6] The loan required that the project is to be carried out by Japanese consultants and contractors; however, the materials and equipment the contractors use could be up to 70% from any country. Between 2009 and 2011, Azusa Sekkei and Oriental Consultants Joint Venture made the design and bid documentation for the airport. In 2011, a call for bids was announced for the construction of the airport, with the Mitsubishi-Chiyoda Joint Venture (MCJV) successful in the technical bidding. An extended price review and contract negotiation were completed on 10 May 2013 when the main construction contract was signed between MCJV and the Civil Aviation Authority of Mongolia.[7]

The final amount of loans from the Japanese Government for the development of the airport totaled Шаблон:JPY (Шаблон:USD), to be paid over forty years.[17]

Construction

The groundbreaking ceremony was on 22 April 2012,[18][19] with initial construction starting with a site flood-protection scheme. Other works under way included the construction of the electric power line from Nalaikh.

Main construction lasted from May 2013 to April 2020.[20] The concrete pouring work for the control tower started on 13 September 2013.Шаблон:Citation needed On 29 January 2014, the airport's electric substation construction was completed and connected to the Mongolian central grid.[21]

Construction of a six-lane, 30 km-long highway to Ulaanbaatar started in May 2016,[22] and ended in 2019.[23]

While the initial opening date was slated for December 2016,[24] the bulk of construction only ended in 2017. Opening of the airport was repeatedly delayed to 2018,[17] 2019,[25][26] 2020,[27] and 2021.[28] These delays were related to contract negotiations regarding the operation and ownership of the airport, the construction of the highway to Ulaanbaatar, and the impact of the COVID-19 pandemic in Mongolia.

Operations at the airport started on 4 July 2021, with an inaugural flight to Tokyo operated by MIAT Mongolian Airlines, flying Ulaanbaatar-Narita-Ulaanbaatar with a Boeing 737.[29][30]

Operations

Файл:Chinggis Khaan International Airport international departure area.jpg
International departure area

Governance

Chinggis Khaan International Airport is managed by New Ulaanbaatar International Airport LLC (Шаблон:Lang-mn),[31] which is responsible for the airport's operations until 2036.[32] It was formed as a partnership between two companies: Japan Airport Management LLC (owned by Mitsubishi Corporation, Narita International Airport Corporation, Japan Airport Terminal, and JALUX), and will hold 51% of the company, while Khushigiin Khundii Airport (Шаблон:Lang-mn), funded by the Government of Mongolia, owns a 49% stake.[12] JALUX manages the airport's retail businesses.[32]

Airlines and destinations

Шаблон:Airport destination list

Traffic and statistics

Файл:ZMCK Flughafenlayout.png
Runway
Annual statistics
Year Domestic passengers International passengers Domestic aircraft movements International aircraft movements Domestic cargo (tonnes) International cargo (tonnes)
2022[33] 333,805 618,960 8,819 5,334 24.2 12,869
2023[9] 419,124 1,312,167 10,310 9,654 17.9 8,555

Шаблон:Col-begin Шаблон:Col-1-of-2

Top international routes by passenger count, 2023[9]
Destination Passengers to Passengers from
Seoul-Incheon 288,436 283,778
Istanbul 69,341 71,233
Beijing-Capital 64,527 59,421
Tokyo-Narita 50,546 48,162
Frankfurt 36,354 34,606

Шаблон:Col-2-of-2

Top domestic routes by passenger count, 2023[9]
Destination Passengers to Passengers from
Khanbumbat (Oyu Tolgoi) 178,431 178,398
Ölgii 5,980 7,096
Khovd 5,811 5,504
Mörön 5,436 5,595
Dalanzadgad 4,254 4,409

Шаблон:Col-end

Airport overview

Файл:20230924 191918 Chingis khaan airport in Mongolia.jpg
Airport departures board

The airport covers an area of 104,200 m2.[13] It has one runway with a length of Шаблон:Convert and width of Шаблон:Convert. It also contains a Шаблон:Convert (Шаблон:Convert wide) parallel taxiway, two rapid taxiways, and three exit taxiways.[32]

Passengers

The airport's passenger terminals have an area of Шаблон:Convert[13] with arrivals on the first (ground floor) and departures on the second floor.[34]

Cargo

The cargo terminal has an area of Шаблон:Convert, with the airport having a yearly cargo capacity of 11,900 tonnes. It also contains separate facilities for the import/export of dangerous, high-value, and refrigerated goods.[15]

Ground transportation

Файл:Ulaanbaatar to Chinggis Khaan International Airport road, towards city.jpg
Newly built highway from the airport to Ulaanbaatar city center

The airport is connected to Ulaanbaatar by highway, and is approximately Шаблон:Convert from the city center. Shuttle bus services, taxis, and private vehicles are the modes of transport.

See also

Notes

Шаблон:Notelist

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:Portalbar Шаблон:Airports in Mongolia

Шаблон:Authority control