Шаблон:Short description Шаблон:Infobox road Cibitung-Cilincing Toll Road is a Шаблон:Convert toll road which extends from Cibitung, West Java, to Cilincing, Jakarta in Indonesia. This is one of the toll roads which are part of the Jakarta Outer Ring Road 2.[1] This toll road is expected to reduce the burden of freight and vehicle transportation on the Jakarta–Cikampek Toll Road that crosses the Cawang area.[2][3]

History

The toll road consists of four sections. Construction of this toll road has been delayed by eight years due to land acquisition problems. The toll road was expected to be operational by 2019.[4][5] The first section of the toll road has been operating since 31 July 2021,[6] followed by the inaugurations of sections 2 and 3 on 20 September 2022.[7]

Sections

Section

Route

Length

Inauguration Date

Section 1 Cibitung–Telaga Asih Шаблон:Convert 31 July 2021
Section 2 Telaga Asih–Tambelang Шаблон:Convert 20 September 2022
Section 3 Tambelang–Mekarjaya Шаблон:Convert
Section 4 Mekarjaya–Cilincing Шаблон:Convert 1 April 2023

Exits

Файл:Gerbang Tol Marunda di Jalan Tol Cibitung Cilincing (JTCC).jpg
Marunda Toll Gate

Шаблон:Jcttop

Шаблон:Jctbridge

Шаблон:Jctint

Шаблон:Jctint

Шаблон:Jctint

Шаблон:Jctint

Шаблон:Jctbridge

Шаблон:Jctint Шаблон:Jctbtm

See also

Шаблон:Portal

References

Шаблон:Reflist

External links

Шаблон:Toll Roads in Indonesia

Шаблон:Indonesia-road-stub