Шаблон:Short description Шаблон:Infobox damThe Cirata Dam is an embankment dam on the Citarum River in West Java, Indonesia. It is located Шаблон:Convert southeast of Jakarta. It was constructed between 1984 and 1988 for the primary purpose of hydroelectric & photovoltaic power generation. Other purposes include flood control, aquaculture, water supply and irrigation. The Шаблон:Convert tall concrete-face rock-fill dam is situated just before a sharp bend in the river and withholds a reservoir with a gross storage capacity of Шаблон:Convert. The reservoir has a surface area of Шаблон:Convert which caused the relocation of 6,335 families. The construction of the dam resulted in involuntary resettlement of 56,000 people.[1]<mapframe latitude="-6.736895" longitude="107.384491" zoom="10" width="256" height="400" text="From bottom to top, Saguling dam (Green), Cirata dam (Blue), Jatiluhur dam (Orange).">{

 "type": "FeatureCollection",
 "features": [
   {
     "type": "Feature",
     "properties": {
       "marker-symbol": "dam",
       "marker-color": "0050d0",
       "title": "Cirata Dam"
     },
     "geometry": {
       "type": "Point",
       "coordinates": [ 107.294712, -6.734338 ]
     }
   },
   {
     "type": "Feature",
     "properties": {
       "marker-symbol": "dam",
       "marker-color": "ffb100",
       "title": "Jatiluhur Dam"
     },
     "geometry": {
       "type": "Point",
       "coordinates": [ 107.347412, -6.530916 ]
     }
   },
   {
     "type": "Feature",
     "properties": {"marker-symbol":"dam", "marker-color":"208020", "title":"Saguling Dam"},
     "geometry": {
       "type": "Point",
       "coordinates": [ 107.406163, -6.918453 ]
     }
   }
 ]

}</mapframe>

Hydroelectricity

The hydroelectric power station is located on the north side of the river bend and contains eight 126 MW Francis turbine-generators. It has a total installed capacity of 1,008 MW and an annual generation of 1,426 GWh. The power station was completed in two phases, the second was completed in 1998. It serves mostly as a peaking power plant and is the largest hydroelectric power station in Indonesia.[2][3]

Floating solar panels

On 9th November 2023, the floating solar panels that were built above the dam became operational. It has the capacity of 192 MW, making it the largest floating solar power plant in Southeast Asia.[4]

The solar power plant alone is giving a contribution to the Net zero emissions of 245 Gigawatt-hours (GWh) of clean & renewable energy and reducing carbon emissions by 210,000 tons of CO2 annually.[5]

See also

References

Шаблон:ReflistШаблон:StackШаблон:Citarum River dams

  1. B. Terminski, Development-Induced Displacement and Resettlement: Theoretical Frameworks and Current Challenges, Geneva 2013.
  2. Шаблон:Cite web
  3. Шаблон:Cite web
  4. Шаблон:Cite web
  5. Шаблон:Cite web