Coire Glas power station is a proposed 1.3GW pumped storage hydroelectric power station in the Scottish Highlands. If built, it will double the UK's ability to store energy for long periods. [1] [2] [3]
Geography
Loch Lochy lies along the Great Glen of Scotland, at an altitude of 29m above ordnance datum (AOD).[4][2]
Above its north-western shore, the Munro mountain Sròn a' Choire Ghairbh reaches a height of 937m. The north-east slope of the summit forms the headwall of the Coire Glas, a horseshoe-shaped glacial corrie. The corrie tarn, Loch a’ Choire Ghlais, lies at an altitude over 500m AOD.
Proposal
Damming the mouth of the Corrie Glas will create the upper reservoir. The crest of the dam will be around 700m long and 92m above ground level at its tallest point. When full, the reservoir will be approximately 1km long and 500m across,[2]Шаблон:Rp with a maximum surface area of 0.63km2. The water level will vary between 494m and 558m AOD, corresponding to a storable volume of 25.9 million m3.[5]
A sloping headrace tunnel will take water down from the upper reservoir through the mountain to a vertical high-pressure shaft leading down to turbines located in a cavern within the mountain itself, and thence to an upwards sloping tailrace discharging into Loch Lochy. The turbines, motor-generator sets and water channels are reversible, so that water from the loch can be pumped back uphill to store electrical energy when needed.[5]
As of May 2023, the power station is planned to have four 324MW turbines with a total generating capacity of 1300MW. When full, the system would store 30GWh of energy, enough for 24 hours of non-stop generation at full output. The power station would be able to switch from standby to stable generation within 30 seconds.[3]
Current status
In December 2023, the exploratory tunnel had reached 720m in length.[6]
A final investment decision will depend on UK government assurances about how the regulated electricity market would reward storage schemes. SSE hope to make that £1.5Bn decision in 2024, in which case the scheme could be completed in 2031.[1]
Project history
The Scottish Government approved the scheme in 2020.[1]
In March 2023, SSE announced plans to spend £100M in exploratory work, including drilling a tunnel 1km into the mountainside to assess the geology.[1]
References
External links
Stakeholder briefing (May 2023)
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Pumped-storage hydroelectric power stations in the United Kingdom
- Hydroelectric power stations in Scotland
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии