Английская Википедия:Cross Country Route

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:About Шаблон:Redirect Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox rail line Шаблон:Cross Country Route RDT The Cross Country Route is a long-distance rail route in England. It runs from Шаблон:Rws to Шаблон:Rws via Шаблон:Rws, Шаблон:Rws, Шаблон:Rws and Шаблон:Rws or Шаблон:Rws. InterCity services on the route, which include some of the longest passenger journeys in the UK such as Шаблон:Stnlnk to Шаблон:Stnlnk, are run by CrossCountry.

The line is classed as a high-speed line because its sections from Birmingham to Шаблон:Rws and from Leeds to York have a speed limit of Шаблон:Convert, though the section from Birmingham to Bristol is limited to Шаблон:Convert because of numerous level crossings, especially half-barrier level crossings, and the section from Wakefield to Leeds has the same limit because of a number of curves.Шаблон:Citation needed

History

The Birmingham–Bristol section was built as the Birmingham and Gloucester and Bristol and Gloucester RailwaysШаблон:Refn before joining the Midland Railway, the southern forerunner to the cross-country route. From Birmingham to the north-northeast, the line had three separately owned sections, namely the:

From the Labour Government's nationalisation in 1948 until privatisation in 1990, the route ran through all six regions of British Rail but did not have timetabling priority in any of them. Therefore the services were poorly promoted and thus not always well-patronised.Шаблон:Citation needed

Most DerbyNottingham local passenger trains were taken over by diesel units from 14 April 1958, taking about 34 minutes between the two cities.[1]Шаблон:Full citation needed

In the 1990s most services were operated by British Rail's InterCity business unit. As part of the privatisation of British Rail, these were taken over by Virgin CrossCountry in 1997, with the Class 47 hauled Mark 2 and High Speed Train sets replaced by Class 220 and Class 221 diesel multiple units in the early 2000s.[2][3]

The use of the route for freight has decreased, because of the bulk of haulage switching to roads and the building of the M5, M6 and M1 motorways.

Abortive British Rail proposals for complete electrification

In the 1960s the route was considered for electrification.Шаблон:Citation needed In the early 1980s, electrification was again discussed at length and documentation for various proposals was produced in 1981.[4] This would have been particularly beneficial for climbing the Lickey Incline between Cheltenham and Birmingham, as many of the early diesels were under-powered. In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network, and by 1979 BR presented a range of options that included electrifying the cross-country route by 2000.[5] Under the governments that succeeded the 1976–79 Labour government, the proposal was not implemented.

Route

Файл:CrossCountry route map.png
Map of Cross Country network. The core Cross Country Route is between Bristol and York

The route is well connected, and aside from its own alignment it uses parts of the South Wales Main Line, Midland Main Line, Swinton–Doncaster line, and the East Coast Main Line. Major cities and towns served along the route include:

Nominal start-point at Derby

Milepost zero for the main predecessor Derby to Bristol route has always been Derby, hence a train travelling the whole route starts out going "up" then becomes "down". The Birmingham to Derby section of the route has a line speed of Шаблон:Convert, while Birmingham to Bristol is restricted to Шаблон:Convert because of a number of half-barrier level crossings.

Electrification

The line is not fully electrified, but some sections are overhead electrified at 25 kV AC such as Bromsgrove to Grand Junction,[6] with further electrified sections around Шаблон:Stnlnk and the East Coast Main Line near Шаблон:Stnlnk. Network Rail stated in 2014 that the line between Шаблон:Stnlnk and Шаблон:Stnlnk would be electrified as part of the Midland Main Line upgrade.[7] However, the electrification programme was severely cut back in July 2017.[8] Шаблон:As of, Network Rail is working on the section between York and Church Fenton.[9] The rest of the section between Leeds and York has electrification planned as part of the Transpennine Route Upgrade, which itself is part of the Integrated Rail Plan for the North and Midlands.[10][11] This plan also includes full Midland Main Line electrification and upgrades.

Electrification between Westerleigh Junction (near Yate, Gloucestershire) and Шаблон:Rws was planned as part of the 21st-century modernisation of the Great Western Main Line, but Шаблон:As of work has yet to progress beyond Filton East Curve, south-west of Шаблон:Rws.

Services

Most long-distance services on the route are operated by Class 220/221 Voyagers, although a few services, until recently, operated using High Speed Trains. These trains are capable of achieving Шаблон:Convert, compared to the previous Class 47s and Mk 2 coaching stock, which had a top speed of Шаблон:Convert.

See also

Notes

Шаблон:Reflist

References

Шаблон:Reflist Шаблон:Commons category

Шаблон:Main inter-regional railway lines in Great Britain Шаблон:Transport in Gloucestershire