Английская Википедия:Crystal River Energy Complex

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Use mdy dates Шаблон:Short description Шаблон:Infobox power station

The Crystal River Energy Complex consists of seven power-generating plants on a Шаблон:Convert site near the mouth of the Crystal River in Citrus County, Florida. Crystal River 1, 2, 4, and 5 are fossil fuel power plants. Crystal River 3 was previously the sole nuclear power plant on the site (1977-2013). The Crystal River Combined Cycle site consists of two Mitsubishi gas turbines, which came on-line in 2018. The complex was developed in the early 1960s by the Florida Power Corporation and sold to Progress Energy Inc in 2000.[1] Following Progress Energy's merger with Duke Energy in 2012,[2] the facility is owned and operated by Duke Energy.[1]

In February 2013, Duke Energy announced that Crystal River 3 would be permanently shut down.[3]

Power plants

Reactor unit Reactor type Capacity Construction started Electricity grid connection Commercial operation Shutdown
Net Gross
Unit 1 Coal, water-cooled 373 MW 441 MW October 1966 2019
Unit 2 Coal, water-cooled 469 MW 524 MW November 1969 2019
Unit 3 Nuclear 860 MW 890 MW September 25, 1968[4] January 30, 1977 March 13, 1977 February 5, 2013
Unit 4 Coal, air, and water-cooled 717 MW 739 MW December 1982
Unit 5 Coal, air, and water-cooled 717 MW 739 MW October 1984