Dallas City Hall is the seat of municipal government of the city of Dallas, Texas, United States. It is located at 1500 Marilla Street in the Government District of downtown Dallas. The current building, the city's fifth city hall, was completed in 1978 and replaced the Dallas Municipal Building.
History
The City of Dallas' idea for a centralized municipal center began when city planning consultants Harland Bartholomew & Associates presented their ideas in 1944. The idea was to relocate from the current Dallas Municipal Building to a grand Beaux-Arts complex of city and federal offices, a convention center and cultural facilities. Two sites downtown were possible contenders: one north centered on Federal Street and Akard, and one south centered on Young Street.Шаблон:Fact
Plans proceeded until cost estimates shocked city leaders and the plan was shelved, although land at the southern site was acquired by the city for future use.Шаблон:Fact
The 1963 assassination of President John F. Kennedy turned the world against the city, as Dallas became known as the "City of Hate".[1] Dallas Mayor Erik Jonsson made it a priority to reinvent the city's image, and the "Goals for Dallas" program was enacted to accomplish this. One of the goals, Design of the city, was summarized by the statement, "We demand a city of beauty and functional fitness that embraces the quality of life for all its people."[2] This was the start of the movement to create a new modern City Hall and municipal center.Шаблон:Fact
Planning for the Dallas Municipal Center commenced in 1964 when the Dallas City Council appointed a Citizen's City Hall Site Committee to select an appropriate location for new municipal administration offices.[3] The mayor was closely involved with the project, and a committee of prominent citizens settled on I.M. Pei to design the new facility.Шаблон:Fact
Construction began on June 26, 1972, under the direction of contractor Robert E. McKee and Pei. The project was completed in three phases. The City accepted the garage parking areas in November 1974; the Park Plaza in May 1976; and the building in December 1977. The cost of design and construction of the building, the Park Plaza and the garage was over $70 million. Controversies arose over cost overruns (the original estimated cost was $42.2 million) and aesthetic issues (was the building too avant-garde?), though most problems were addressed and work moved on to completion.[3]
The first Dallas City Council meeting was held in the building's City Council Chamber on February 1, 1978, and the entire facility was formally opened and dedicated on March 12, 1978.[4]
Design
When you do a city hall, it has to convey an image of the people, and this had to represent the people of Dallas ... The people I met – rich and poor, powerful and not so powerful – were all very proud of their city. They felt that Dallas was the greatest city there was, and I could not disappoint them.
– I.M. Pei[5]
I.M. Pei's modernist inverted pyramid design is a result of space requirements from city government. Public areas and citizen services required much less space than offices that ran the government and overhanging the upper floors allowed them to be larger than the public spaces below. The building slopes at a 34° angle, with each of the 7 above-grade floors being 9½ feet wider than the one below. This inclined façade interacts with the buildings it faces downtown and provides protection from the weather and Texas sun.[6]
The foundation and basement levels are considerably wider than the apparent footprint of the structure, extending out beneath the inclined facade. The cantilevered roof is Шаблон:Convert wide, the ground floor is Шаблон:Convert wide, and the basement Шаблон:Convert wide.[7] When Mayor Jonsson reacted to the apparent top-heaviness of the building's shape, 3 cylindrical pillars that appear to hold up the structure were created. These contain stairwells that had originally been concealed within the design. These pillars only provide visual support and do not bear the load of the building.[7]
Pei also persuaded the city to acquire an additional 6 acres in front of the building as a plaza and buffer zone for his grand public structure. A 1,325 car parking garage was built beneath the plaza, and the extra income helped supplement the funding of the building.Шаблон:Fact
A buff-colored concrete was chosen for the main building material; its color resembled local earth tones. Since concrete was both the primary structural and finish material, close attention was paid to every aspect of its mix and placement.[7]
The design of Dallas City Hall inspired the J. Erik Jonsson Central Library building located across the street – whereas the upper floors of City Hall are oriented toward Marilla Street, the upper floors of the Central Library are oriented away from Marilla (and, in a form of symmetry, away from City Hall).Шаблон:Fact
The building features in the RoboCop movies of the 1980s and 1990s, as the Headquarters of the OCP company. Special effects were employed to make the building appear taller than it is.[8][9]
Facilities
- City Hall contained 1,400 workstations when it opened in 1978. It had few floor-to-ceiling walls, using instead five-, six-, and seven-foot-high partitions to create separate offices. The absence of walls allowed employees and visitors to have window views from all areas.
- The second floor of Dallas City Hall is referred to as the Great Court because of its Шаблон:Convert length and the uninterrupted height to the vaulted ceiling approximately Шаблон:Convert above.Шаблон:Fact
- The Park Plaza is two blocks long and one block wide and is bounded by Young, Ervay, Marilla and Akard streets. The Plaza includes a Шаблон:Convert-diameter reflecting pool, a variable-height fountain, park benches and three distinctive Шаблон:Convert-high flagpoles. The Plaza is landscaped with trees native to Texas: live oaks and red oaks. The reflective pool contains large floating sculptures designed by artist Marta Pan.Шаблон:Fact
- A Шаблон:Convert-high by Шаблон:Convert-wide, three-piece sculpture titled "The Dallas Piece" was designed by Henry Moore for the plaza and resembles vertebrae.Шаблон:Fact
- A state-of-the-art Conference Center that includes a 156-seat auditorium and three conference rooms was recently Шаблон:Whenadded to Dallas City Hall.Шаблон:Fact
- A tunnel and station for future rail transit was constructed in the third level basement beneath the parking garage and Marilla Street. This tunnel has remained unused but has been considered for DART's second light rail route through downtown Dallas.Шаблон:Fact
Gallery
-
City Hall Plaza is regularly used for marches and protestsШаблон:Citation needed
-
View from City Hall toward downtown
-
Side view of City Hall
-
Interior corridors of City Hall
-
View of City Hall from Reunion Tower
References
External links
Шаблон:Commons category Шаблон:Portal
- Dallasarchitecture.info - Dallas City Hall
- Dallascityhall.com - Official City of Dallas website
- Architecture Week: "Engineering a Pei Cantilever — Dallas City Hall" Шаблон:Webarchive
- Pei Cobb Freed & Partners
- Dallas Morning News: City Hall Blog — by Dave Levinthal and Rudolph Bush.
Шаблон:Downtown Dallas Шаблон:I. M. Pei Шаблон:Authority control
- Страницы с неработающими файловыми ссылками
- Английская Википедия
- Buildings and structures in Dallas
- City halls in Texas
- Downtown Dallas
- Government of Dallas
- I. M. Pei buildings
- Inverted pyramids
- Modernist architecture in Texas
- Pyramids in the United States
- 1978 establishments in Texas
- Government buildings completed in 1978
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии