Английская Википедия:Daniel Gooch standard gauge locomotives
Шаблон:Use dmy dates Шаблон:Use British English The Daniel Gooch standard gauge locomotives comprise several classes of locomotives designed by Daniel Gooch, Superintendent of Locomotive Engines for the Great Western Railway (GWR) from 1837 to 1864.
History
In 1854 the GWR absorbed two standard gauge lines, the Shrewsbury and Chester Railway and the Shrewsbury and Birmingham Railway to become the GWR's Northern Division. Consequently, from then until his retirement in 1864, Daniel Gooch (the company's Superintendent of Locomotive Engines, a post he had occupied since 1837), although a passionate advocate of the GWR's original broad gauge, of necessity also became responsible for designing standard gauge locomotives for the new Northern Division. From 1858 the construction of standard gauge engines started at the newly enlarged Northern Division Works at Stafford Road, Wolverhampton; these were designed by Joseph Armstrong, the Wolverhampton Locomotive Superintendent that the GWR had inherited along with the S&BR.
Alongside these Armstrong locomotives, several other standard gauge locomotive classes were built during these years under the aegis of Gooch himself, either at the Great Western's principal works at Swindon, or else by outside firms, Swindon and Wolverhampton between them not yet having sufficient capacity for all the necessary new construction. Though these engines were mostly designed by Gooch himself, sometimes the influence of Joseph Armstrong may be evident.
Classes
The classes concerned are as follows:
57 Class
Nos. 57-68, twelve Шаблон:Whyte freight engines designed by Gooch built at Swindon in 1855-6. They were typical Gooch engines, resembling his broad gauge Standard Goods, suitably narrowed for the standard gauge. On delivery they had to be transported to Wolverhampton on specially constructed broad gauge wagons. Between 1873 and 1890, all were "renewed" at Wolverhampton - that is, built afresh with minimal use of parts from the original engines - and in 1890-91 William Dean added, for some reason, three more to the class, as Nos. 316-8. With a few exceptions the class remained in the Northern Division, and the last was withdrawn in 1927.Шаблон:Sfn Nos. 60 and 67 ran between 1876/7 and 1886 as saddle tank engines, having been renewed in that form by George Armstrong.Шаблон:Sfn
69 Class
Nos. 69-76, eight Gooch Шаблон:Whytes for the Wolverhampton-Shrewsbury line, built 1855-6 by Beyer, Peacock & Co. in Manchester. Four of these engines were the very first to be built by Beyer, Peacock, at their brand-new Gorton Works. In 1861, when standard gauge trains started to run through on the mixed gauge to Paddington, the engines moved south to work on the London-Oxford-Wolverhampton sections. In the 1872–75 period, the locomotives were "renewed" by George Armstrong at Wolverhampton, i.e. replaced by what were "from an engineering viewpoint new engines." Cabs were fitted from 1880, and new boilers of a different design were fitted to all except no. 69 between 1887 and 1893. Then in 1895–97, under William Dean at Swindon, they were reconstructed once more, emerging as Шаблон:Whytes of the "River" Class.Шаблон:SfnШаблон:Sfn
77 and 167 classes
Nos. 77, 78 and 167-170, seven Шаблон:Whytes built in 1857 and 1861 with boilers to Gooch's design but otherwise designed by the builders, Beyer, Peacock & Co.Шаблон:SfnШаблон:Sfn
79 Class
Nos.79-90 and 119-130, 24 Шаблон:Whyte freight engines designed by Gooch and built at Swindon in 1857 (79-90) and 1861-2. Very similar to the 57 class but with smaller driving wheels, they hauled the important coal traffic between Pontypool Road and Birkenhead (carrying fuel for the Atlantic liners, which burned Welsh steam coal). 13 of them were renewed under William Dean at Swindon, and they were withdrawn between 1905 and 1918.Шаблон:Sfn The other 11 were rebuilt by George Armstrong as saddle tank locomotives, becoming the 119 class.
91 Class
Nos. 91 and 92, two Шаблон:Whytes supplied in 1857 by Beyer, Peacock & Co., to their own design, for shunting at the collieries around Wrexham. Though No.91 was withdrawn in 1877, its sister had a very long life, surviving until 1942, having spent its last three years as a stationary boiler at Wellington.Шаблон:Sfn
93 Class
Nos 93 and 94, built 1860 at Swindon. These were the GWR's first Шаблон:Whyte locomotives. In 1875 and 1877 they were completely renewed at Wolverhampton to become members of the 1901 Class; just before this they are known to have been at Chester and Wolverhampton respectively.Шаблон:Sfn
131 Class
28 Шаблон:Whytes designed by Gooch: Nos. 131-6, built 1862 at Swindon; 137-148, built 1862 by Slaughter, Grüning & Co. of Bristol; and 310-19 built 1864-5 at Swindon. These locomotives used Stephenson, not Gooch valve gear, for the first time at Swindon; this may have been at Armstrong's suggestion. They were later renewed at Wolverhampton.Шаблон:SfnШаблон:Sfn
"Sharps" or 157 Class
Nos. 157-166, ten Шаблон:Whytes built in 1862 "to Gooch's specifications" by Sharp, Stewart and Company, and closely resembling the 69 Class. In 1879 Nos. 157, 161 and 163 were renumbered 172, 173 and 174 respectively, while the others were "renewed" in 1878-9, that is, withdrawn and replaced by ten officially new engines, William Dean's 157 Class. In their original form, the "Sharps" worked mainly on the Paddington-Wolverhampton expresses.Шаблон:Sfn
"England" or "Chancellor" Class
Nos. 149-156, eight Шаблон:Whytes built in 1862 "to GWR drawings" by George England & Co. at the Hatcham Ironworks, New Cross, Surrey. They were stationed at Wolverhampton for expresses to the north, and were renewed in 1878-1883, also at Wolverhampton.Шаблон:SfnШаблон:Sfn
320 Class
Nos. 320 and 321, two Шаблон:Whytes built at Swindon in 1864 for working on the underground Metropolitan Railway in London. They were the first standard gauge engines anywhere to have condensers, though the system was not a success. Within ten years both were converted to tender engines, and they were withdrawn in 1881.Шаблон:Sfn
322 or "Beyer" Class
Thirty Шаблон:Whytes built by Beyer, Peacock & Co. of Manchester. The first 20, Nos. 322-41, were ordered by Gooch and built in 1864; ten more, Nos. 350-59 followed in 1866, having been ordered by Armstrong. The latter were the last 19th-century GWR locomotives to be built by an outside contractor. Like the 79 Class, they were initially used between Pontypool Road and Birkenhead. Between 1878 and 1885, six were rebuilt at Wolverhampton as saddle tank engines. The rest were withdrawn between 1912 and 1934, and quite exceptionally three of the class, Nos. 354, 355 and 388, achieved mileages of over 1,500,000.Шаблон:Sfn
Notes
Sources
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Great Western Railway locomotives
- 2-2-2 locomotives
- 0-4-0 locomotives
- 2-4-0 locomotives
- 0-6-0 locomotives
- Scrapped locomotives
- Standard gauge steam locomotives of Great Britain
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии