Английская Википедия:Daskalakis Athletic Center

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox venue

Файл:DU Daskalakis Athletic Center.jpg
The entrance to the DAC in 2006

Daskalakis Athletic Center (DAC) is a Шаблон:Convert athletic and recreational facility in Philadelphia, Pennsylvania.[1]

The facility is best known for its 2,509-seat multi-purpose arena that is home to multiple Drexel University Dragons sports teams including basketball and wrestling. While the entire recreation center, including the multi-purpose arena, gym, natatorium, rock climbing wall, and squash canter are located in the athletic center, the "DAC" generally refers solely to the multi-purpose arena.

When originally opened in 1975 as the Physical Education Center, sometimes just referred to as the "New Gym", the facility included grandstands that sat a capacity of 1,800, and was expandable to 2,700 seats with temporary bleachers.[2]

In January 2005, the basketball court was named Cozen Court after being dedicated to former Drexel men's basketball head coach Sam Cozen.[3]

At the 2006 convocation Drexel University president Constantine Papadakis announced a Шаблон:Convert, three-story addition to the existing Daskalakis Athletic Center. The project, which expanded to an Шаблон:Convert addition, broke ground in June 2008.[4] Construction finished in December 2009 and parts of the building opened to students in January 2010. The Drexel Recreational Center officially opened in February 2010.[5][6]

Notable events

Basketball

The DAC hosted games in all or part of the 1993–1996 America East Conference men's basketball tournaments, the 2005 NIT Season Tip-Off, and the 2007 and 2012 National Invitation Tournament. In 2013, the DAC hosted four games of the 2013 Women's NIT, with the Dragons defeating Utah 46-43 in the final to win the tournament.

The DAC was built in 1974 as the Physical Education and Athletic Center (PEAC)[7] and was renamed in 2001 after a gift from former Drexel Lacrosse player John A. Daskalakis ('63).[8]

The Daskalakis Athletic Center hosted the 2018 and 2022 Colonial Athletic Association women's basketball tournament, and will again host the tournament in 2024.

In 2023, the DAC will host The Basketball Tournament 2023 semifinals and championship.[9]

Concerts

Midnight Madness

The annual Midnight Madness event was held in the arena before the basketball season begins. The event was similar to those at other universities, as it serves as a pep rally for the entire men's and women's basketball seasons. During the event, the lineups for the teams are announced, and the annual DAC Pack T-shirt design was also released. Since 2011, a concert was also held as a closing to the event. The 2013 event which featured Childish Gambino held an attendance of over 2,200. In 2014 the event was replaced with the Drexel Fall Fest.

Spring Jam

The annual Spring Jam concert, which is organized by the Drexel CAB, is generally held during the spring semester. The Spring Jam was performed at the DAC in 2006 before it was relocated to the Drexel Armory in 2007. Previously, the annual event was held in other areas including the Drexel Academic Quad, and Buckley Green. In 2011, it was relocated again to Lot F, an open parking area on Drexel's campus between Main Building and 31st Street. The headlining acts of the Spring Jam concerts performed at the Daskalakis Athletic Center have included:

Homecoming Concert

Fall Concert

Previous to the Drexel Campus Activities Board hosting the Spring Jam, their annual concert was in the Fall

Winter Concert

Other Concerts

Squash

From 2011 through 2019, the annual US Open of Squash was held in the arena.

Table Tennis

In 2008, the DAC hosted the 2008 U.S. Olympic & National Table Tennis Team Trials. The event reached a capacity crowd of 2,000.[16]

Tennis

The DAC hosted the World Team Tennis Championship match between the Philadelphia Freedoms and Springfield Lasers on August, 5th 2018.

Arena Renovations

2012–2016

Over the span of multiple years, a staggered renovation took place in the main gym of the recreation center. The renovations took place during the basketball offseason each year (during Spring and Summer months) as to not interfere with the men's or women's basketball seasons.

2012

After a $3 million gift in support of Drexel athletics from John A. Daskalakis, renovations began in 2012 at the Daskalakis Athletic Center among other athletic facilities. The renovations completed in the first year of the upgrade were:

  • Major renovation to the home locker room
  • A Drexel athletics hall of fame display

2013

In the Summer of 2013, more renovations continued in the main gym including:

  • A large portion of the bleachers located on the West side of the gym were replaced with cushioned chair-back seating. This included VIP chair-back seating in the first row.
  • A small number of additional bleacher seats was added in the Southwest corner

2014

In March 2014, more renovations totaling $7.7M were approved[17] and include:

  • Chair-back and VIP seating to replace the East bleachers, similar to the West bleacher renovation that occurred the previous offseason
  • New South bleacher, 28 rows in height and approximately 1,000 seats, to hold the DAC Pack and pep band. (Previously, the DAC Pack was primarily located at the East bleachers)
  • Several additional bathrooms, meeting space, a conference/reception area, and basket storage located in the Southwest corner behind the seating
  • New visitor locker room, located in the Northwest corner

The addition of floor 'pro-style' baskets was also investigated by the design team. Following their investigation, a decision was made to not implement the floor baskets because they found that the South bleachers would have to be moved back nine feet further from the basketball court, and also that floor baskets generally cause an obstructed view for any fans seated behind the basket. Because of this, the DAC will continue to use its swing-down style baskets.

2015

Phase 4 of the Daskalakis Athletic Center renovation, completed in October 2015 included:

  • New north-end seating, reducing the capacity to 2,509 from 2,532.
  • Improved concessions

2016

Phases 5 and 6 of the renovation began in May 2016 and were completed in September 2016. Phase 5 of the renovation involved additions to the basketball court level and includes the addition of bathrooms, offices, ticket booth, conference room, storage rooms, and an audio/visual room for television broadcasts. Phase 6 included installing an air conditioning system in the arena.

2022

On May 31, 2022, Drexel announced that construction was underway to add an LED video scoreboard, sound system, LED lighting, and an upgraded video production studio to the arena.[18]

See also

Шаблон:Portal

References

Шаблон:Reflist

External links

Шаблон:Drexel University Шаблон:Drexel Dragons men's basketball navbox Шаблон:Drexel Dragons women's basketball navbox Шаблон:Colonial Athletic Association basketball venue navbox