Delhi–Alwar Regional Rapid Transit System (Delhi–Alwar RRTS) is a 164 km long under-construction[1][2] semi-high speed rail corridor connecting Delhi, Gurgaon, Rewari and Alwar. It is one of the three RapidX corridors planned under Phase-1 of the Rapid Rail Transport System of the National Capital Region Transport Corporation (NCRTC). With maximum speed of 160 km/h and average speed of 105 km/h,[3] the distance between Delhi and Alwar will be covered in 104 minutes.[4] The project is expected to cost Шаблон:Indian rupee37,000 crores.[5]

History

The National Capital Region Planning Board (NCRPB) as part of its Integrated Transportation Plan 2032 identified eight rail based rapid transit corridors to improve the efficacy of transportation system in the NCR.[6] These were:

  1. Delhi - Gurgaon - Rewari - Alwar
  2. Delhi - Ghaziabad - Meerut
  3. Delhi - Sonipat - Panipat
  4. Delhi - Faridabad - Ballabhgarh - Palwal
  5. Delhi - Bahadurgarh - Rohtak
  6. Delhi - Shahadra - Baraut
  7. Ghaziabad - Khurja
  8. Ghaziabad - Hapur

Of these Delhi-Alwar, Delhi-Panipat and Delhi-Meerut are to be constructed in the first phase. The Urban Mass Transit Company was given the job of conducting a feasibility study on 23 March 2010. The study thus submitted was approved by the Planning Board in 2012. The contract was then transferred to NCRTC on 18 January 2017 to carry the study forward.[7]

On 15 June 2018, the 100 km long first phase of the project from Hazrat Nizamuddin to Shahjahanpur-Neemrana-Behror, at an estimated cost of Шаблон:INR25,000 crore, was approved by the Haryana government.[8]

Construction

Construction of Delhi-Alwar route with total 22 stations in will be completed in the following three construction phases and a pre-construction phase:[9]

  • Pre-construction phase - January 2019 to December 2019: Pre-construction activities such as Pile Loading Test and Geo-Technical Survey for one year from January 2019 to December 2019.[9]
  • Phase-1 (Delhi to Dharuhera) - January 2020 to December 2024: The 70 km Sarai Kale Khan in Delhi to Gurgaon to Dharuhera .[9] Initial 35 km with 5 stations will be underground mostly in Delhi and Gurgaon, and subsequent 71 km route with 8 stations will be overground in Haryana. To be completed by 2024.[9] In April 2020, GR Infrastructure emerged as the lowest bidder for package 1: IDPL Complex Ramp - Rajiv Chowk Ramp with 3 stations.[10]
  • Phase-2 (Dharuhera to <not updated>) - <dates>?: stations en route include Shahjahanpur, Neemrana and Behror.[9]
  • Phase-3 (Sotanala to Alwar) - <dates>?: All in Rajasthan.[9]

Stations

There will be total 22 stations in total; 16 (11 elevated and 5 underground) will be built in the first phase and the rest in later phases.[11][12][13]

No. Station Name Connections Layout Status
Phase-1
1 Sarai Kale Khan Шаблон:Rcb
Hazrat Nizamuddin railway station

Sarai Kale Khan ISBT

Elevated Planned
2 INA Шаблон:Rcb Шаблон:Rcb Underground
3 Munirka Шаблон:Rcb Underground
4 Aerocity Шаблон:Rcb Шаблон:Rcb Underground
5 Udyog Vihar Шаблон:Rcb Elevated
6 Gurgaon Sector-17 None Elevated
7 Rajiv Chowk None Elevated
8 Kherki Daula None Underground
9 Manesar None Underground
10 Panchgaon None Elevated
11 Bilaspur Chowk None Elevated
12 Dharuhera None Elevated
Phase-2
13 MBIR None Elevated
14 Rewari None Elevated
15 Bawal None Elevated
16 SNB None Elevated
17 Shahjahanpur None Elevated Planned
18 Neemrana None Elevated
19 Behror None Elevated
20 Sotanala None Elevated
Phase-3
21 Khairthal None Elevated Planned
22 Alwar None Elevated

Status updates

  • June 2018: Final Detailed Project Report (DPR) of the project is approved by the Government of Haryana.[14]
  • December 2018: The Phase-I construction project proposal for Delhi-Gurgaon-Shahjahanpur-Neemrana-Behror stretch is approved by NCRTC.
  • February 2019: The Government of Haryana approved the project.[15]
  • June 2019: The Government of Rajasthan approved the project.[15]
  • November 2019: Bids for the construction of the Gurgaon section of the project were invited.
  • September 2020: Construction started on a 10 km stretch in Gurgaon.[16]
  • November 2021: Work on the project's key stretch awaits centre's nod.[17]
  • May 2022: Pre-construction work begins on the project's corridor in Gurgaon.[18]
  • March 2023: Pre-construction work complete in Gurgaon.[19]
  • October 2023: NCRTC proposes alignment change for the corridor.[20]
  • January 2024: NCRTC proposes changes to the corridor.Phase 1 will consist of only upto Dharuhera station , Further 4 stations till SNB omittted.[21]