Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Eckington mine was a drift mine situated on the eastern edge of the township of Eckington, Derbyshire, England,[1] Шаблон:Convert South-West of Sheffield. Шаблон:Asof, it was the only colliery in production in North East Derbyshire.

The mine was operated by Eckington Colliery Partnership during whose ownership it produced Шаблон:Convert. In the 12 months leading to March 2007, the workforce was 26.[2] The mine subsequently passed under the ownership of Moorside Mining Co. Ltd.

History

Planning permission for Eckington Mine was granted in 1992, and allowed the company to extract 0.74 million tonnes of coal from a seam which covered some Шаблон:Convert.Шаблон:Sfn The mine began operating in 1993. It consisted of two drifts, which extracted coal from the Eckington Deep Soft (Flockton) Seam.[1] In 1999, planning permission was given to extract an additional 15,000 tonnes of coal from an area of Шаблон:Convert to the north of the original planning consent.Шаблон:Sfn The coal was supplied to the Ratcliffe-on-Soar Power Station. A review of the mine in 2013 led to it being granted a 10-year extension, because it was unlikely that it would cause an further environmental damage.[3] The mine workings are located above deeper historic workings of the Parkgate Seam, which is Шаблон:Convert below it, and the Thorncliffe Seam which is Шаблон:Convert below.Шаблон:Sfn

The mine was started by Moorside Mining Company, and had a good safety record for the first five years, but part of the roof collapsed in 1998, killing two miners and injuring a third. The collapse took place some Шаблон:Convert from the entrance.[4] The mine continued to be run by Moorside Mining, but by 2013 was run by Caledonian Coal Company. Ownership had passed to John Baker Barnett Ltd by 2015 and to European Coal Products by 2017.Шаблон:Sfn

It closed unexpectedly in January 2019. After closure, the site was inspected by the Coal Authority, to ensure that it would remain safe. The two roadways that entered the mine pass beneath the London to Sheffield railway line, and work was carried out to ensure that this route would not be compromised by future subsidence. The work began shortly after closure, because the mine contained underground springs, and with the pumps switched off, water levels were rising quickly. Reinforced concrete blockwork was used to construct walls across both roadways some Шаблон:Convert from the entrance. Foamed concrete was then pumped into the shafts, which rested against the walls because of the steep angle of the shafts. A total of Шаблон:Convert of the shaft was filled in this way, in stages so that the weight of the concrete would not destroy the retaining walls. Normal practice would be to use waste material from the mine to pack the shafts, but because the mine was worked by a pillar and stall method, there was no suitable material on the surface. Around Шаблон:Convert of concrete was used. Once the concrete had set, the roadways were closed off by digging out the entrances, and reprofiling the land. The project took 13 week to complete, and ended in June 2020.[5]