Eighth Street Bridge is a road bridge over the Passaic River in northeastern New Jersey, United States. It connects the City of Passaic in Passaic County with the Borough of Wallington in Bergen County and is jointly owned by both counties. The bridge connects Eighth Street in Passaic with County Route 507 in Wallington.

Originally opened in 1915 as a bascule bridge, the bridge was fixed in place in 1977. The Eighth Street Bridge was closed to traffic permanently on July 24, 2017 so work could begin on its replacement, which was completed in 2019.

Location and operations

Eighth Street Bridge passes over the Passaic Шаблон:Convert from the river mouth at Newark Bay, at the Passaic and Bergen county line.

The lower Шаблон:Convert of the Шаблон:Convert Passaic River downstream of the Dundee Dam is tidally influenced and channelized.[1] Once one of the most heavily used waterways in the Port of New York and New Jersey, it remains partially navigable for commercial marine traffic.

The original bridge had been in fixed closed position in 1977. Only bridge at MP 11.7 and those downstream from it are required by federal regulations to open.[2][3][4] [5]

Design and construction of first bridge

Built in 1914, the Eight Street Bridge was a Warren pony truss bridge, originally a bascule bridge. The total length Шаблон:Convert with a deck width was Шаблон:Convert. The length of largest span: Шаблон:Convert It followed the design of Strauss Bascule Bridge Company of Chicago and was fabricated by the F.R. Long - W.G. Broadhurst Company of Hackensack. The main span was an Шаблон:Convert long is a Strauss articulated overhead counterweight single leaf bascule span. The entire bridge is supported on a concrete substructure. It originally was composed of built-up members as were the trunnion columns, braced counterweight tower, and counterweight linkages that permitted the counterweight to pivot and move parallel to itself during operation of the bridge.

The bridge was significantly rehabilitated 1965, when a steel grid deck was installed. Between 1976 and 1979 the bridgeman's shanty was demolished and operating controls for the electric-motor powered span were removed and the bridge was fixed in the closed position. The gear sets and shafts were left in place as was the chain-operated manual operation. The original metal sidewalk railings are intact.[6] The 300-ton counterweight, used to open the bridge, began to crumble onto passing cars and had to be removed.[7]

The bridge carried a two-lane road, two sidewalks, and a utility pipe from 8th Street in Passaic to Main Avenue in Wallington. As of 2014, was used by about 6,500 vehicles per day.

The State Historic Preservation Office determined in that Eighth Street Bridge was of historical and engineering merit to be included in the state (ID#3426) and federal register of historic places.[8]

Replacement

The 1914 bridge had seriously deteriorated and as of 2015 was in a state of severe disrepair and considered to be structurally deficient and fracture critical. There were 13 ton, 19 ton and 30 ton weight restrictions.[9] Plans to replace the bridge had been in place since 2012. Funding was provided by state and federal sources.[7][10] Land acquisition of parcels in the vicinity of the bridge has been mired in legal eminent domain battles have hampered replacement.[11]

After delays of several months, the bridge was closed to traffic on July 24, 2017.[12]

The new Шаблон:Convert Eighth Street Bridge with two lanes of traffic in each direction was completed in August 2019 with the assistance of $15 million in aid from the federal government[13] [14]

See also

References

Шаблон:Reflist

Шаблон:Crossings navbox

  1. Шаблон:Cite web
  2. Шаблон:Cite web
  3. Шаблон:Cite web
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. Ошибка цитирования Неверный тег <ref>; для сносок NJDOThist не указан текст
  7. 7,0 7,1 Шаблон:Cite web
  8. Шаблон:Cite web
  9. FY 2013 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
  10. Шаблон:Cite web
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. Sobko, Katie. "After years of construction, Passaic bridge to Bergen County finally reopens", The Record, August 9, 2019. Accessed July 27, 2022. "Although replacing the century-old Eighth Street Bridge had been on the drawing board for decades, it wasn't until 2012 that the federal government allocated the $15 million to do the project.... The Eighth Street Bridge connects the heavily industrial lower Dundee section of Passaic with Wallington, which is more residential. Before it closed, about 6,300 vehicles a day crossed the bridge.... The plan calls for a 290-foot bridge with two lanes on both sides and a left-hand turning lane onto Main Avenue in Wallington."