The El Cajón Dam is a hydroelectric dam on the Río Grande de Santiago in the Mexican state of Nayarit. Construction began in 2003 and was completed in June 2007. It cost US$800 million to build.[1] It is Шаблон:Convert long and is Шаблон:Convert high. The reservoir holds approximately Шаблон:Convert of water, and the generators are capable of producing Шаблон:Nowrap of electricity. The dam is operated by the Comisión Federal de Electricidad, a state-owned Mexican electric company. Throughout the construction of the El Cajón Dam, the following is estimated:

  • Rock fill with concrete face dam
  • A cost of 800 million dollars
  • An economic benefit of 2 billion pesos (160 million dollars)
  • The creation of approximately 10,000 direct and indirect jobs
  • The improvement of access roads that will benefit up to 20,000 inhabitants belonging to 40 communities
  • An annual mean power generation of 1,228 GWh, approximately 1.5 times the annual consumption of Nayarit
  • An installed capacity of Шаблон:Nowrap
  • An approximate annual savings of two million barrels of fuel oil
  • An increase in the firm power generation of the Aguamilpa Hydroelectric Station, due to the regulation of the Río Grande de Santiago and its effluents in the basin, as well as the diversification of the primary energy sources in the National Electric System.

See also

Шаблон:Stack

References

  1. Ошибка цитирования Неверный тег <ref>; для сносок voip не указан текст

External links

Шаблон:Río Grande de Santiago dams


Шаблон:Hydroelectric-power-plant-stub Шаблон:Mexico-struct-stub