Английская Википедия:Embraer E-Jet E2 family

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates

The Embraer E-Jet E2 family are medium-range twinjet airliners designed and produced by the Brazilian aircraft manufacturer Embraer. It was developed as a successor to the original E-Jet family.

The program was launched at the Paris Air Show in June 2013. The E-Jet 2 is a derivative of the original E-Jet family paired with several improvements, chiefly the adoption of more fuel-efficient Pratt & Whitney PW1900G turbofan engines. The family comprises three variants that share the same four-abreast narrow-body fuselage with different lengths and three different new wings, fly-by-wire controls with new avionics, and an updated cabin. The first variant, the E190-E2, made its maiden flight on 23 May 2016 and flight testing proceeded to schedule with little issue. It received certification on 28 February 2018 before entering service with launch customer Widerøe on 24 April. Certification of the larger E195-E2 was received during April 2019; Azul Brazilian Airlines was the first airline to operate this model.

Development of the smaller E175-E2 has been delayed; deliveries were originally set to begin sometime in 2021. In February 2022, Embraer announced that development of the E175-E2 would be put on hold for three years and that deliveries are thus expected to begin between 2027 and 2028.

Development

Background

During the early 2010s, the regional jets segment of the international airliner market grew more competitive with the announcement of the Airbus A320neo and the Boeing 737 MAX, thus it was thought that Embraer would have to respond or else lose the competitiveness of the E-Jet family through inaction.[1]Шаблон:Needs clarification In 2010, Embraer was reportedly considering directly challenging the Bombardier CSeries (now A220) by producing a clean-sheet five-abreast design for 100 to 150 passengers. The alternative option was to somehow improve the E-Jet family to maintain its attractiveness to customers.[1]

In November 2011, Embraer announced at the Dubai Air Show that it had committed to producing new variants of its E-Jet family.[2] This option was both lower risk and lower cost than pursuing a cleansheet design.[1] At the time, Embraer reportedly foresaw a demand for 6,400 commercial jets with capacity of up to 130 seats over the following 20 years. The smallest of the new variants, the E-175-E2, seats up to 88 passengers in a single class configuration, the medium-sized E-190-E2 seats up to 120 passengers, while the largest model, the E-195-E2 seats up to 132 passengers.[1] During the late 2000s, Embraer had studied an aircraft of such capacity, dubbed the E-195X, but had discarded the concept in 2010 in light of degraded aircraft performance in the absence of a re-engine. On account of its poor sales and decreasing demand for 70 seat jets, a redesigned counterpart to the E-170 was not pursued.[1]

One key feature of these new variants would be more efficient engines with larger diameter fans; several large engine manufacturers, GE Aviation, Pratt & Whitney, and Rolls-Royce, were all evaluated by Embraer as possible suppliers.[3] During January 2013, it was announced the Pratt & Whitney PW1000G Geared Turbofan engine had been selected to be the exclusive powerplant of the E2.[4] Embraer commercial aircraft president Paulo Cesar de Souza e Silva noted that the PW1000G was the best suited engine for the performance sought by customers.[5] The selection of the PW1000G is likely to have been eased by the parallel development of the smaller PW1200G engine for the Mitsubishi Regional Jet as well as the larger and more mature PW1500G for the Airbus A220.[1]

The E2 family made various improvements in its performance, such as a reduced specific fuel consumption, lower emissions and noise output, minimised maintenance costs, along with the use of a new aluminum or carbon fiber-based wing.[6] These wings had a higher aspect ratio, a longer wingspan, and were equipped with raked wing tips instead of winglets.[1] In early 2013, Embraer referred to this project as being "the E-jets second generation".[7] During June 2013, the $1.7 billion program was launched at the Paris Air Show, citing strong customer demand.[8][9]

The development programme made extensive use of digital model simulations and static test rigs, enabling rapid progress to be made early on.[6] By May 2016, less than three years after being launched, the E2 had 640 commitments from various airlines and leasing companies, 267 of which were firm orders while 373 were options and purchase rights.[6]

Flight testing

Файл:PR-ZGQ (39770747914).jpg
An E190-E2 prototype, the E190-E2 made its maiden flight on 23 May 2016 and was type certificated on 28 February 2018.

On 25 February 2016, the first E-Jet E2, an E190-E2, was rolled out. It performed its maiden flight from São José dos Campos on 23 May 2016, three months ahead of schedule.[6] It flew for three hours and twenty minutes to Mach 0.82, climbed to Шаблон:Convert, retracted the landing gear and flaps, and engaged the fly-by-wire in normal mode. It flew earlier than the previously anticipated second half of 2016. The program had fewer challenges than expected and introduction was then planned in the first quarter of 2018. The airplane was slightly below expected weight and the other two E190-E2 prototypes should fly within a year.[10]

On 8 July 2016, the second prototype made its maiden flight; this initial flight lasted two hours and 55 minutes and was incident-free. The first E-Jet E2 flew from Brazil to Farnborough Airshow just 45 days after its maiden flight, demonstrating maturity and confidence in the design.[11] By April 2017, 650 hours of flight tests had been completed and the program was reportedly on schedule. Embraer sought to guarantee a 99% schedule reliability in the first year of service.[12] By June 2017, half of the flight testing had been completed; the aerodynamics were reportedly better than predicted and the E190-E2 hot and high performance was also better than anticipated.[13]

The E195-E2's MTOW increased to Шаблон:Cvt and its range to Шаблон:Cvt.[14] In June 2017, the four E190-E2s and the single E195-E2 - which was presented at the 2017 Paris Air Show - had made more than 900 flight-test hours, mostly by the E190-E2s.[15] In July 2017, the five aircraft had flown 1,000 flight-test hours while the E190-E2 had accomplished 55% of its test campaign.[16] In January 2018, 98% of the test campaign was completed with 2,000 flight hours. Fuel burn was 17.3% lower than for the E190, up from 16% predicted, while range had increased by Шаблон:Cvt from hot-and-high or short runways: Шаблон:Cvt from Mexico City or London City, and noise margin to Stage 4 was 3 EPNdB better than specification at 20 EPNdB.[17]

On 28 February 2018, the E190-E2 received its type certificate from the National Civil Aviation Agency of Brazil (ANAC), Federal Aviation Administration (FAA) and European Union Aviation Safety Agency (EASA).[18] The first production engines for the larger variant were delivered in February 2019 and should deliver a 24% reduction in per-seat fuel burn compared with the E195.[19] The E195-E2 obtained its type certification in April 2019.[20]

Production

Шаблон:Update section

Файл:EGLF - Embraer E190-E2 - PR-ZGQ (42923565984).jpg
The E-Jet E2 competes with the Airbus A220 in the background.

Inspired by the automotive industry's production of multiple models on the same line, Embraer proposed building the E190/195-E2 alongside the original E175/190/195 at a steady rate of eight aircraft per month by the end of 2018. Production of the original E-Jet family was projected to slow if assembly of the E175-E2 had started in 2021.[21] As Embraer transitioned from its previous E-jets to the upgraded E2, it was expecting to deliver 85-95 airliners in 2018 with a negative $150 million free cash flow, less than in 2017 with 78 deliveries in the first nine months with a cash outflow of $700 million: return to profitability will take at least three years once the program investment is reduced and the production ramp up is complete.[22] Hybrid stations capable of work on either the E1 or E2 were more automated, moving to 90% automated drilling and riveting for the E2 wing.[23]

Elements such as the cabin were examined from a production standpoint relatively early in the design process, which included the involvement of external suppliers as well. Embraer opted for a sole-source solution for the cabin; this approach reportedly enabled more aggressive deals to be secured from key suppliers and thus lowering costs while also easing integration by reducing the number of suppliers involved.[24]

In November 2017, the E2 was forecast to account for 10% of Embraer's airliner deliveries in 2018 ahead of a planned rise in 2019.[25][26] Embraer thought Airbus would not be able to lower the A220 supply chain costs enough to make it profitable and viewed the A220 as a heavy, expensive and long-range aircraft. Embraer hoped the E2's operational capabilities would win a majority of the market share as commitments were hoped to follow certification and entry into service.[25] Embraer delivered 101 airliners in 2017, down from 162 in 2008, but targeted delivering 14 E2 monthly or even 16 or 18.[23] Throughout 2022, Embraer worked to ramp production at its Sao Jose dos Campos facility, hiring Toyota to help improve efficiency on the E-Jet line using lessons from the Toyota Production System. During the fourth quarter of that year, deliveries surged to 80 aircraft, pushing Embraer's full-year deliveries to 159, up from 141 delivered in 2021.[27]

Introduction

Файл:LN-WEA Widerøe E190 @ HEL (41763585300).jpg
A Widerøe E190-E2. The variant was introduced by the carrier on 24 April 2018.

After type certification, the first E190-E2 was delivered to launch operator Widerøe in April 2018, configured with 114-seat in single-class, followed by deliveries for Air Astana and Chinese GX Airlines. Before the aircraft were delivered, Embraer announced that some of the initial E-Jet E2s will need to be retrofitted due to the shorter life of the combustor in their Pratt & Whitney PW1900G engines. A business class is developed with a 2+2 staggered seat layout offering a seat pitch of up to Шаблон:Cvt, available from mid-2019.[28]

Embraer targets a 99% dispatch reliability after 12 months and 99.5% after four years while the E1 took 10 years to achieve its targeted reliability.[23] On 4 April 2018, Widerøe took delivery of its first E190-E2 in Sao Jose dos Campos.[29] It was introduced between Bergen and Tromsø, Norway on 24 April 2018.[30] By June 2018, the first three E190-E2s delivered to Wideroe accumulated 413 flight hours and 332 cycles, an average of 6.57 cycles per day and an average stage length of 1.28 hours, with a 99.35% dispatch reliability and a 97.74% schedule reliability.[31] Widerøe had a dispatch reliability of 98.5% after its first year of operation.[32]

Boeing–Embraer joint venture

Шаблон:Main

In December 2017, Boeing and Embraer were discussing a potential combination.[33] On July 5, 2018, Boeing and Embraer announced a Memorandum of Understanding to establish a joint venture, in which Boeing would hold an 80% stake, to produce and service Embraer's commercial airliners, including the E-Jet E2.[34] Aviation industry analysts noted that the deal would be good for both companies, as Boeing needed smaller aircraft, like the E-Jet and E-Jet E2 families, and Embraer needed the marketing power of a larger company as the E-Jet E2 family was selling slowly.[35]

On February 26, 2019, the partnership was approved by Embraer's shareholders,[36] and the new joint venture was waiting for regulatory approval. On April 24, 2020, Boeing terminated the deal, stating that Embraer did not satisfy the conditions of the agreement.[37] Embraer rejected Boeing's reasons, saying the company sought to avoid its commitments and said it would pursue "all remedies against Boeing for the damages incurred,"[38] which industry analysts believe may include damages for orders that were lost while customers were waiting for the deal to close.[39]

Design

Файл:Embaer 195-E2, Paris Air Show 2019, Le Bourget (SIAE0871).jpg
An E195-E2 from below: high wing aspect ratio and single slotted flaps

The E-Jet E2 family had been built on the first generation E-Jet, its wing is redesigned, and it introduces new pylons, landing gear, horizontal stabilizers, cabin, cabin air system, air cycle machine, bleed air system, and a new fly-by-wire system.[40] The E2 is exclusively powered by the Pratt & Whitney PW1000G Geared Turbofan engine; in comparison to traditional powerplants, the PW1000 offers double-digit improvements in fuel burn, pollutant and noise emissions, and operating costs via its lower fan pressure ratios and greater bypass ratios, achieved via the uncoupling of the fan from the low-pressure compressor and the low-pressure turbine.[41] In addition to the main engines, the auxiliary power unit is also supplied by Pratt & Whitney.[42]

The raised, 11:1 aspect ratio gull-wing partially accommodate the Шаблон:Cvt diameter geared turbofan engine, larger than the CF34 engine by Шаблон:Cvt while the trailing arm landing gear is taller for Шаблон:Cvt higher door sills, giving a Шаблон:Cvt lower nacelles than the E1.[43] The wing remains broadly similar to that of the E1, the main difference being the use of single-slotted flaps instead of the more complex and drag-generating double-slotted arrangement while the engine pylon is also shorter. The adoption of a composite wing was considered by found to be not yet economically justifiable.[23] The wing structure was lightened by Шаблон:Cvt due to the fly-by-wire ailerons, also used when braking, avoiding larger wheels and brakes.[23] The horizontal stabilizer was reduced from Шаблон:Cvt on the E190 and E195 to Шаблон:Cvt on the E2 jets.[44]

Embraer targeted 16 to 24% lower fuel burn and 15–25% lower maintenance cost per seat.[45] In the E190-E2, of the 17.3% better fuel burn, 11% comes from the geared turbofan, 4.8% from the improved aerodynamics of the new high aspect ratio wing and 1.5% from the fly-by-wire's 15% smaller tail surfaces.[43] Over a Шаблон:Cvt trip and with a US$72 fuel barrel, Embraer estimates a 97-seat E190-E2 trip cost is 7% lower for a 1% higher seat cost than a 106-seat A220-100, a 120-seat E195-E2 has a 2% higher trip cost but a 10% lower seat cost and 10% lower trip cost and 3% lower seat cost than a 129-seat A220-300; and while a 97-seat E190 had an 18% higher seat cost than a 150-seat A320 and a 23% lower trip cost, an E190-E2 has a 30% lower trip cost for an 8% higher seat cost than a 150-seat A320neo, while an E195-E2 has the same seat cost but 20% lower trip cost.[46] In October 2018, Embraer raised its E190/E195-E2 seat or trip costs claim to roughly 10% better than the A220.[47]

The cabin of the E2 was designed around customer requirements that called for greater robustness, flexible reconfiguration, and improved maintainability.[24] The lighting is entirely by LEDs; they can be controlled via the integrated cabin management system along with other functions such as cabin temperature control, water and waste system monitoring, moving map, flight attendant calls, cabin systems power, and audio digital playback amongst others. The interior features modular provisions that enable the future installation of new equipment and whole systems relatively easily and quickly either while in the original production process or mid-life retrofitting.[24] Many interior elements of the cabin, such as panels, bins, galley elements, and lavatories, are provided by EZ Air, a joint venture between Zodiac Aerospace and Embraer.[24] In comparison with the E1 family, the cabin side walls were replaced with slimmer counterparts to gain Шаблон:Cvt on each side while new overhead bins are Шаблон:Cvt deeper.[23] Baggage bins have been enlarged by 40%.[48][49]

Файл:Embraer E195 E2 (34610191664).jpg
Embraer E195-E2 prototype, seen from front, showing its gull wing

The E2 features a closed loop fly-by-wire flight control system which reduces weight, increases fuel efficiency, enhances control and increases safety by full envelope protection in all flight phases compared to the first E-Jet.[50] The fuel savings of the now closed loop fly-by-wire control come from the enhanced flight stability and the resulting increased lift (lower tail downward force) and weight savings and drag reductions related to the 26% reduction in the horizontal tail (tailplane) size.[51] The Primary Flight Control System is supplied by Moog Inc.[52] The Honeywell Primus Epic 2 avionics suite is used across the family, which aids in maintaining commonality with the E1.[6][53] The cockpit is equipped with landscape displays and advanced graphics capabilities via this suite.[1]

Basic maintenance inspections occur every 1,000 flight hours, up from 850 on the E1, while the intermediate check interval grew to 10,000 flight hours from 8,500.[17] The heavy-check downtime was reduced by 15% from the E1, no out-of-phase tasks are required, and control and corrosion prevention is required every eight years with 82 tasks down from 240.[54]

Operational history

Файл:EC-NHA Embraer 195-E2 Binter arrecife 29-02-20.jpg
Binter Canarias E195-E2 approaching Arrecife Airport

On 3 December 2018, Air Astana received its first E190-E2 of an order of five, to replace nine E190LR used on domestic and regional routes since 2011.[55]

On 31 October 2019, Helvetic Airways became the fourth airline to take delivery of an E2 aircraft and the third (after Widerøe and Air Astana) to receive an E190-E2 aircraft, configured in a single-class layout with 110 seats.[56] On 1 November 2019, Helvetic Airways made their first revenue flight with the E190-E2. The inaugural flight, LX850, was a Шаблон:Cvt, 95-minute leg from Zürich to Bremen.[57]

On 21 November 2019, Binter Canarias became the fifth airline to take delivery of an E2 aircraft and the second (after Azul Brazilian Airlines) to receive an E195-E2 aircraft, configured in a single-class layout with 132 seats.[58] On 13 December 2019, Binter Canarias made their first revenue flight with the E195-E2, which was to depart from Gran Canaria at 11:35 and to arrive at Sal at 14:00.[59][60]

On 30 December 2019, Air Kiribati received its first E190-E2 of an order of two, becoming the fourth airline to take delivery of an E190-E2 aircraft. The airliner, configured in a two-class layout with 92 seats (12 business and 80 economy class), is to serve destinations throughout the vast expanse of Kiribati, including nonstop from Tarawa to Kiritimati (Christmas) Island (the current domestic flight from Tarawa to Kiritimati requires an international stopover in Fiji).[61]

Variants

E175-E2

The E175-E2 (EMB 190-500) model is the smallest in the E-Jet Second Generation family. The E175-E2 will be extended by Шаблон:Cvt from the E175, allowing for the addition of one seat row and a capacity up to 90 passengers. In 2013, the aircraft was expected to cost US$46.8 million.[62]

While the first-generation E175 proved popular with regional airlines in the United States, the weight of the E175-E2 has prevented sales to these customers. Scope clause agreements between mainline carriers and their pilots unions prevent these airlines from contracting with regional airlines to operate aircraft with maximum takeoff weight exceeding Шаблон:Convert. The E175-E2 exceeds this limit by Шаблон:Convert, due to its heavier geared turbofan engines.[63][64]

The first E175-E2 prototype made its first takeoff on 12 December 2019 from São José dos Campos and flew for 2 hours and 18 minutes, starting a test and certification campaign that was expected to take 24 months and involve two additional aircraft.[65] At that time, Embraer said it believed there would be strong demand for the jet from outside North America,[65] but Шаблон:As of the company has received no orders for the variant.

First delivery was initially scheduled for 2021.[64] It has been repeatedly delayed and in February 2022, Embraer announced that it will be halting development of the E175-E2 for three years, with deliveries expected to begin between 2027 and 2028.[66]

E190-E2

Файл:HB-AZB.jpg
The E190-E2 keeps the original E190 36.24 m (119 ft) length and has a single overwing exit per side.

The Шаблон:Cvt PW1900G has a Шаблон:Cvt fan for a 12:1 bypass ratio. The aluminum wing span increased to Шаблон:Cvt for the highest wing aspect ratio of any airliner, just over 11, while the larger E195-E2 has a longer wingtip and the smaller E175-E2 has a downsized wing. It was moved forward to shift the center of gravity envelope aft to reduce the horizontal stabilizer downforce, lowering fuel burn by 1.5%. The trailing link main landing gear has wheel doors to reduce fuel consumption by 1% and is Шаблон:Cvt taller to provide enough engine ground clearance. The E2 have 75% new parts, closed-loop controls fly-by-wire instead of the open-loop type in the E1 gaining improved maintenance intervals. For E1-rated pilots, the transition to the new type need 2.5 days with no full flight simulator, having similar Honeywell Primus Epic 2 avionics.[67] The E190-E2 (EMB 190-300) has a Шаблон:Cvt wider wingspan but otherwise is close in size to the E190, with up to 114 seats in a single class configuration.[68][69][70][71]Шаблон:Citation needed

The E190-E2 unit cost was US$53.6 million in 2013.[62] Embraer had it certified on 28 February 2018.[18] Certification needed 46,000 test hours on ground and 2,200 in flight.[67] Due to better than expected fuel burn during tests, in January 2018 Embraer increased the range to Шаблон:Cvt, and Bombardier tried to implicate it in the CSeries dumping petition by Boeing as it could attain a Шаблон:Cvt range.[72] It entered service with Widerøe on 24 April 2018.[30] In 2018, a newly delivered E190-E2 is worth $34 million, $3 million more than the E190, falling to $20 million in seven years, a 40% decline to be compared with 30% projected for an A320neo over the same timeframe.[73]

E195-E2

Файл:Embraer E195-E2 (ERJ 190-400 STD) PS-AEF.jpg
The E195-E2 is Шаблон:Cvt longer than the E190-E2 and has dual overwing exits per side. Azul was its launch operator.

The E195-E2 (EMB 190-400) is extended by three seat rows from the E195 by Шаблон:Cvt, and accommodates up to 146 seats.

The E195-E2 unit cost was US$60.4 million in 2013.[62] In February 2016, Embraer announced that it had decided to increase the E195-E2's wingspan by Шаблон:Cvt for greater lift, along with a MTOW increase of Шаблон:Cvt to extend its range by Шаблон:Cvt at sea-level starts, and Шаблон:Cvt in hot and high conditions.[74][75] It competes with the Airbus A220-300,[76] at a lower unit cost. As well, Embraer claims E195 trip costs are 22% lower than a 154-seat A320neo and 24% below a 160-seat 737-8 - but airlines install more seats, widening seat costs further apart than the 6% and 8% quoted by Embraer.[23]

The variant rolled out on 7 March 2017 and Azul was confirmed as its launch operator.[77] It first flew on 29 March 2017, ahead of the previously scheduled second half of the year.[78] Embraer showcased the prototype at the Paris Air Show in June 2017 and planned for it to enter service in the first half of 2019.[79] By January 2019, the flight-test program preliminary results showed the E195-E2 could end up being a little above specifications at introduction.[80] It was certified on 15 April 2019, with a fuel burn 1.4% less than originally specified for 25.4% less per seat than the E195.[20] Binter Canarias was its European launch customer, taking delivery in late 2019.[81]

On 12 September 2019, Embraer delivered its first E195-E2 to Azul through lessor AerCap, configured with 136 seats in a single class.[82] On 22 July 2022, an E195-E2 landed at London City Airport (LCY) for the first time.[83] The variant received EASA certification in November 2023[84] making it the largest aircraft cleared to operate from the small airport.Шаблон:Cn

Operators

Шаблон:As of, there were 84 E2-Jet aircraft in commercial service with nine known operators; the three largest operators are Porter Airlines (27) KLM Cityhopper (18), Azul Brazilian Airlines (15).[85][86]

Airlines E175-Е2
in service
E190-Е2
in service
E195-Е2
in service
Total
Royal Jordanian Airlines 2 2
Air Astana 5 5
Air Kiribati 1 1
Air Peace 5 5
Azul Brazilian Airlines 15 15
Binter Canarias 5 5
Helvetic Airways 8 4 12
KLM Cityhopper 18 18
Porter Airlines 27 27[87]
Widerøe 3 3
Undisclosed 1 1
Total 0 18 76 94

Model summary

E2-Jet model summary
Model variant Orders Deliveries Backlog
E175-E2
E190-E2 34 18 16
E195-E2 282 76 206
E2-Jet Total 316 94 212

Source: Embraer's order book as of 30 June 2023.[85][86][88]

Deliveries by year

2018 2019 2020 2021 2022 2023 Total
Deliveries 4 14 11 21 19 25 94

Orders and deliveries

The Embraer E-Jet E2 program was officially launched during the 50th International Paris Air Show held in June 2013, with SkyWest Airlines, a North American regional airline, and ILFC, a leasing company placing the first firm orders for the aircraft.[89]

SkyWest was intended as the launch customer of the Embraer E175-E2, with the airline placing a firm order for 100 aircraft, with purchase rights for another 100, an order valued at US$9.36 billion at list price,[90] although airlines routinely receive deep discounts from the list price of planes. The order was canceled in Q3 of 2018.[91][92]

ILFC is the launch customer for the Embraer E190-E2 and E195-E2, with the leasing company placing a firm order for 25 E190-E2 aircraft and 25 E195-E2 aircraft, with purchase rights for another 25 of each type.[93] ILFC was purchased by AerCap in May 2014.[94]

Embraer E-Jets E2 firm orders[85]
Initial order Country Customer E175-E2 E190-E2 E195-E2 Order total
Шаблон:Dts[95] Ireland AerCap 5 45 50
Шаблон:Dts[96] China ICBC 10 10
Шаблон:Dts[97] Brazil AzulШаблон:Efn 51 51
Шаблон:Dts[98] United States Aircastle 2 23 25
Шаблон:Dts[99] Norway WiderøeШаблон:Efn 3 3
26 September 2018[100] Switzerland Helvetic Airways 8 4 12[101]
13 November 2018[102] Spain Binter Canarias 5 5[103]
18 December 2018[104] Kiribati Air Kiribati 2 2[105]
3 April 2019[106] Nigeria Air Peace 13 13[107]
23 April 2021 Canada Porter Airlines 75 75[108]
24 January 2022[109] United States Azorra 4 16 20[109]
Шаблон:Dts[110] Oman SalamAir 6 6[111]
30 November 2022[112] Spain Binter Canarias 5 5[113]
18 May 2023[114] Jordan Royal Jordanian 2 2
11 October 2023[115] Argentina Aerolíneas Argentinas 12 12
17 February 2023[116] Singapore Scoot - 9 - 9
Undisclosed 1 15 16
Totals 0 34 282 316

Шаблон:Notelist

Embraer E-Jets E2 leased/removed/canceled/unconfirmed orders not in latest quarter report[117]
Initial order Country Customer E175-E2 E190-E2 E195-E2 Order total
Шаблон:Dts[90] US SkyWest Airlines 100 100
Шаблон:Dts[118] China Tianjin Airlines 20 20
26 May 2020[119] Congo Congo Airways 2 2 4
Totals 100 22 2 124

Шаблон:Notelist

Binter Canarias has converted two options for Embraer E195-E2 aircraft to firm orders. Their first new Embraer aircraft is expected to be delivered in the second half of 2019 with Binter Canarias being the European launch customer.[120] KLM is to lease 25 E195-E2s from Aircastle (15) and ICBC (10) instead of buying from Embraer.[121]

Specifications

Шаблон:See also Шаблон:Sticky header

See also

Шаблон:Portal Шаблон:Aircontent

References

Шаблон:Reflist

External links

Шаблон:Commons and category

Шаблон:Embraer

  1. 1,0 1,1 1,2 1,3 1,4 1,5 1,6 1,7 Шаблон:Cite web
  2. Шаблон:Cite news
  3. Шаблон:Cite news
  4. Шаблон:Cite news
  5. Шаблон:Cite web
  6. 6,0 6,1 6,2 6,3 6,4 Шаблон:Cite web
  7. Шаблон:Cite press release
  8. Шаблон:Cite news
  9. Шаблон:Cite press release
  10. Ошибка цитирования Неверный тег <ref>; для сносок Flight24may2016 не указан текст
  11. Шаблон:Cite press release
  12. Шаблон:Cite news
  13. Шаблон:Cite news
  14. Шаблон:Cite news
  15. Шаблон:Cite news
  16. Шаблон:Cite news
  17. 17,0 17,1 Шаблон:Cite news
  18. 18,0 18,1 Шаблон:Cite press release
  19. Шаблон:Cite news
  20. 20,0 20,1 Шаблон:Cite news
  21. Шаблон:Cite news
  22. Шаблон:Cite news
  23. 23,0 23,1 23,2 23,3 23,4 23,5 23,6 Шаблон:Cite news
  24. 24,0 24,1 24,2 24,3 Шаблон:Cite web
  25. 25,0 25,1 Шаблон:Cite news
  26. Шаблон:Cite news
  27. Шаблон:Cite web
  28. Шаблон:Cite news
  29. Шаблон:Cite news
  30. 30,0 30,1 Ошибка цитирования Неверный тег <ref>; для сносок Embraer24apr2018 не указан текст
  31. Шаблон:Cite news
  32. Шаблон:Cite news
  33. Шаблон:Cite press release Boeing and Embraer
  34. Шаблон:Cite press release
  35. Шаблон:Cite news
  36. Шаблон:Cite press release
  37. Шаблон:Cite press release
  38. Шаблон:Cite press release
  39. Шаблон:Cite news
  40. Шаблон:Cite news
  41. Шаблон:Cite web
  42. Шаблон:Cite web
  43. 43,0 43,1 Шаблон:Cite news
  44. Шаблон:Cite news
  45. Шаблон:Cite web
  46. Шаблон:Cite news
  47. Шаблон:Cite news
  48. Шаблон:Cite news
  49. Шаблон:Cite news
  50. Шаблон:Cite web
  51. Шаблон:Cite news
  52. Шаблон:Cite press release
  53. Шаблон:Cite press release
  54. Шаблон:Cite news
  55. Шаблон:Cite news
  56. Шаблон:Cite press release
  57. Шаблон:Cite press release
  58. Шаблон:Cite press release
  59. Шаблон:Cite press release
  60. Шаблон:Cite web
  61. Шаблон:Cite press release
  62. 62,0 62,1 62,2 Шаблон:Cite news
  63. Шаблон:Cite news
  64. 64,0 64,1 Шаблон:Cite news
  65. 65,0 65,1 Шаблон:Cite news
  66. Шаблон:Cite news
  67. 67,0 67,1 Шаблон:Cite news
  68. Embraer ERJ 190-300 is commercially named as "EMBRAER 190-E2" or “E190-E2” From https://www.aviation.govt.nz/assets/aircraft/type-acceptance-reports/embraer-erj-190-series.pdf
  69. https://www.flyembraer.com/irj/go/km/docs/download_center/Anonymous/Ergonomia/Home%20Page/Documents/APM_E-JetsE2.PDF Шаблон:Bare URL PDF
  70. https://www.embraercommercialaviation.com/wp-content/uploads/2017/02/APM_E190.pdf Шаблон:Dead link
  71. Шаблон:Cite web
  72. Шаблон:Cite news
  73. Шаблон:Cite news
  74. Шаблон:Cite news
  75. Шаблон:Cite news
  76. Шаблон:Cite web
  77. Шаблон:Cite news
  78. Шаблон:Cite news
  79. Шаблон:Cite news
  80. Шаблон:Cite news
  81. Шаблон:Citation
  82. Шаблон:Cite press release
  83. Шаблон:Cite web
  84. Шаблон:Cite news
  85. 85,0 85,1 85,2 Шаблон:Cite news
  86. 86,0 86,1 Шаблон:Cite press release
  87. Шаблон:Cite web
  88. Шаблон:Cite news
  89. Шаблон:Cite news
  90. 90,0 90,1 Шаблон:Cite press release
  91. Шаблон:Cite news
  92. Шаблон:Cite news
  93. Шаблон:Cite press release
  94. Шаблон:Cite web
  95. Шаблон:Cite press release
  96. Шаблон:Cite web
  97. Шаблон:Cite web
  98. Шаблон:Cite press release
  99. Шаблон:Cite press release
  100. Шаблон:Cite web
  101. Шаблон:Cite news
  102. Шаблон:Cite web
  103. Шаблон:Cite web
  104. Шаблон:Cite web
  105. Шаблон:Cite web
  106. Шаблон:Cite web
  107. Шаблон:Cite news
  108. Шаблон:Cite web
  109. 109,0 109,1 Шаблон:Cite web
  110. Шаблон:Cite news
  111. Шаблон:Cite news
  112. Шаблон:Cite web
  113. Шаблон:Cite press release
  114. Шаблон:Cite web
  115. Шаблон:Cite web
  116. Шаблон:Cite web
  117. Шаблон:Cite web
  118. Шаблон:Cite web
  119. Шаблон:Cite web
  120. Шаблон:Cite journal
  121. Шаблон:Cite web
  122. Шаблон:Cite web
  123. Шаблон:Cite web
  124. Шаблон:Cite web
  125. Шаблон:Cite web
  126. Шаблон:Cite web
  127. Шаблон:Cite web
  128. Шаблон:Cite web