Английская Википедия:Energlyn & Churchill Park railway station

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short descriptionШаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station

Energlyn & Churchill Park railway station (Шаблон:Lang-cy) is a railway station in Caerphilly, Wales, on the Rhymney Line. The northbound platform is in the Energlyn suburb of Caerphilly, whilst the southbound one is in Churchill Park. The station is between Шаблон:Rws and Шаблон:Rws.

The first services from the station ran on 8 December 2013.[1] The station was formally opened on 16 December 2013 by Edwina Hart, the Welsh Government Transport Minister.[2]

History

Файл:Energlyn and Churchill Park railway station - Geograph-3822789-by-Jaggery.jpg
Platforms 1 (right) on the Churchill Park side and 2 (left) on the Energlyn side

The provision of a station on the Rhymney Line at Energlyn was raised in January 2001 when Sue Essex AM was reported to have instructed that £16 million should be set aside for works to improve capacity on the line, including a new station.[3] The failure of Railtrack delayed the project, which was next mentioned in Network Rail's Wales Route Utilisation Strategy for Control Period 4 (2009-2014).[4][5] The station was identified as a longer-term option to be undertaken beyond the Control Period as part of the Sewta strategy which also involved installing a passing loop at Шаблон:Rws, allowing an increased service on the Rhymney Line.[6] The station would serve new housing around Energlyn and Churchill Park,[6][7] as well as Pwllypant, Penyrheol, Abertridwr and Bedwas.[8] The population in the area is large enough to warrant a station but it is thought unlikely that patronage on the Rhymney Line will dramatically increase, as many potential passengers already use neighbouring stations.[8] The initial service provision was four trains an hour to and from Шаблон:Rws and Шаблон:Rws.[8]

In December 2008, Sewta submitted a £350 million five-year spending programme to the Welsh Government which included £38.7 million for works on the Rhymney Line, including Energlyn station.[9] Plans for the station were put on hold when the works were not included in the Government's spending plans for 2011-2012, the reason given being the spending cuts imposed by the UK Coalition government.[4] The project was, however, identified as a priority in the Welsh Government’s National Transport Plan in January 2012, with a projected completion date in 2015.[10]

The design for the station was unveiled by Network Rail on 9 February 2012. It comprises two six-car length platforms with step-free access, parking for 17 cars including disabled spaces,[11] a drop-off point, CCTV, waiting shelters, ticket machines, a bicycle storage area, emergency help points and train information displays.[6][12][13] The design was developed jointly by the Welsh Assembly Government, Network Rail, Caerphilly County Borough Council, Sewta and Arriva Trains Wales.[12] Provision of the new station was scheduled to cost £5.2 million.[7] From opening to October 2018, it was operated by Arriva Trains Wales. Transport for Wales took over operation from October 2018.[14]

Construction

The station was built by a Colas Rail and Morgan Sindall joint venture.[11]

Services

In the December 2016 timetable, the basic daytime service remains two trains per hour each way, to Caerphilly, Cardiff Central & Шаблон:Rws southbound and to Шаблон:Rws northbound. One per hour of the latter continues to Шаблон:Rws.[15] This drops to hourly in the evening and two-hourly on Sundays. Increasing the frequency of services to four per hour in each direction has been proposed, but is not currently possible due to timetabling issues at Шаблон:Rws.[16]

Шаблон:Rail start Шаблон:Rail line Шаблон:S-end

References

Шаблон:Reflist

External links

Шаблон:Commons category Шаблон:Stn art lrnk

Шаблон:Transport in Caerphilly County Borough Шаблон:Cardiff, Newport and the Valleys railway stations Шаблон:South Wales Metro