Английская Википедия:Europipe II

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:About Шаблон:Use British English Шаблон:Use dmy dates Шаблон:Infobox pipeline

Europipe II is a natural gas pipeline from the Kårstø processing plant north of Stavanger to a receiving terminal at Dornum in Germany. It came on stream on 1 October 1999.[1]

Route

It starts from Kårstø processing plant and runs about Шаблон:Convert onshore from Kårstø to Vestre Bokn. From there, the Шаблон:Convert offshore pipeline runs through Norwegian, Danish and German sectors of the North Sea. The German onshore section is Шаблон:Convert long.[2] At Dornum the gas is supplied into the Netra (Norddeutsche Erdgas Transversale) gas pipeline, which runs to Salzwedel in eastern Germany.

Technical description

The diameter of pipeline is Шаблон:Convert and the capacity is Шаблон:Convert of natural gas per year.[3] Most of the gas is supplied from Equinor's Åsgard, Sleipner East/West, Gullfaks and Statfjord fields.

The Europipe II pipeline was laid by Semac I, Castoro Sei and Solitaire pipe-laying ships.[4] Europipe II was commissioned in 1999 and it cost 9.6 billion NOK. The pipeline is operated by Gassco, the technical service provider is Equinor. It was built with an option to branch out to a separate pipeline to Denmark. A pipeline end manifold was installed in April 2022 for the Baltic Pipe to Poland.[5]

See also

Шаблон:Portal

References

Шаблон:Reflist

External links

Шаблон:Coord missing

de:Europipe Gasleitung