Английская Википедия:Expressways of Sri Lanka

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Infobox highway system Sri Lanka currently has over Шаблон:Convert of designated expressways serving the southern and central parts of the country. The first stage of the E01 Expressway (Southern Expressway), which opened in 2011 was Sri Lanka's first expressway spanning a distance of Шаблон:Convert. The second stage of the Southern Expressway opened in 2014 and extends to Matara. The E03 Expressway (Colombo–Katunayake Expressway) opened in 2013 and connects Sri Lanka's largest city Colombo with the Bandaranaike International Airport covering a distance of Шаблон:Convert. The newest expressway is the Port Access Elevated Highway running from New Kelani Bridge, Colombo to Athurugiriya, It is estimated to be finished in 2025. All E-Grade highways in Sri Lanka are access-controlled, toll roads with speeds limits in the range of Шаблон:Convert. Pedestrians, bicycles, motorcycles, three wheelers and tractors are not permitted to enter the expressways.[1]

ITS (Intelligent Transportation System) systems are being installed presently. ETC Electronic Toll Collection systems are being installed on the Southern Expressway while the Colombo-Katunayeke Expressway system is functional.

Expressways of Sri Lanka

Number Name Length (km) Length (mi) Northern end Southern end Completed Notes
Шаблон:Expressway code (Sri Lanka) E01 Southern Expressway Шаблон:Convert Kottawa, Colombo Mattala 2020 Kottawa–Galle in 2011; Galle-Matara in 2014; Matara-Hambantota in 2020.[2]
Шаблон:Expressway code (Sri Lanka) E02 Outer Circular Expressway Шаблон:Convert Kerawalapitiya   Kottawa, Colombo 2019 Kottawa–Kaduwela in 2014; Kaduwela–Kadawatha in 2015; Kadawatha-Kerawalapitiya in 2019[2]
Шаблон:Expressway code (Sri Lanka) E03 Colombo-Katunayake Expressway Шаблон:Convert Bandaranaike International Airport New Kelani Bridge, Colombo 2013 Шаблон:Convert extension to Colombo Port City is under construction and is expected to be completed in 2022. New interchanges will be added at Ingurukade and Orugodawatta.[2]
Шаблон:Expressway code (Sri Lanka) E04 Central Expressway (Section II) Шаблон:Convert Kurunegala Mirigama 2022 Partial project completion in 2022[3]
Шаблон:Expressway code (Sri Lanka) E04 Central Expressway (Section I, III & IV) Шаблон:Convert Dambulla Kadawatha Under construction. Stage 2 was opened in early 2022. Project completion up to Kandy in 2024[3]
Шаблон:Expressway code (Sri Lanka) E06 Magampura Expressway Шаблон:Convert Andarawewa Hambantota 2019 Completed in 2019[2]
Шаблон:Expressway code (Sri Lanka) E09 Port Access Elevated Highway Шаблон:Convert New Kelani Bridge, Colombo Port city Under construction. Expected completion in September, 2024[4]
Ruwanpura Expressway Шаблон:Convert Kahathuduwa Pelmadulla Under construction. Expected completion in 2023[5]
NKB-Athurugiriya Elevated Highway Шаблон:Convert New Kelani Bridge, Colombo Athurugiriya Under construction. Expected completion in 2025[6]

Шаблон:Routelist bottom

Gallery

Southern Expressway (E01)

Katunayake (E03)