Английская Википедия:Far North Line

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use British English Шаблон:Use dmy dates Шаблон:Infobox rail line Шаблон:Far North Line

The Far North Line is a rural railway line entirely within the Highland area of Scotland, extending from Inverness to Thurso and Wick. As the name suggests, it is the northernmost railway in the United Kingdom. The line is entirely single-track, with only passing loops at some intermediate stations allowing trains to pass each other. In common with other railway lines in the Highlands and northern Lowlands, it is not electrified and all trains are diesel-powered.

Route

The line links the city of Inverness, the largest city in the Scottish Highlands, with the towns of Wick and Thurso at the northeastern tip of Britain.

Like the A9 trunk road north of Inverness, the Far North Line broadly follows the east-facing coastline of the Moray Firth, with all three termini located on the coast. As such, the railway links many of the same places as the road.

Many more places were served by both the railway and the road before three new road bridges were built: across the Beauly Firth (between Inverness and the Black Isle), the Cromarty Firth and the Dornoch Firth. As a result, at some locations the railway is now a long way inland from the modern route of the A9.

The railway also loops a long way inland between Tain and Golspie, running via Lairg, which has never been on the A9; it was envisaged at the time of construction that this diversion would open the centre of Sutherland to trade. It also takes a large inland detour north of Helmsdale, running via the Flow Country, which the A9 also never passed through; this diversion was dictated by the unfavourable terrain of the Caithness coastline.

Inverness–Tain: through Ross-shire

Файл:16.07.18 Inverness 158720 and 158721 (42708007715).jpg
The Far North Line platforms at Inverness station, the southern terminus of the line

The railway line begins at Inverness station,Шаблон:Efn-ua where passenger connections are available for the Highland Main Line (to Perth, Glasgow, Edinburgh and London) and the Aberdeen–Inverness line (to Inverness Airport, Elgin and Aberdeen), as well as for bus services to destinations throughout the Scottish Highlands. While the A9 leaves Inverness by crossing the Beauly Firth on the Kessock Bridge, the Far North Line instead heads west and runs alongside the Firth.

Файл:Beauly A862.jpg
The short platform of Beauly station

The single track crosses both the River Ness and the Caledonian Canal before it leaves Inverness and parallels the A862 roadШаблон:Efn towards the village of Beauly. After Шаблон:Convert, the line crosses the River Beauly and then takes a sharp, almost 180° right turn (from a west-southwest heading to north-northeast); Beauly stationШаблон:Efn-ua is located halfway along this curve. Closed in 1960, the station reopened in 2002[1] and its single operational platform has the distinction of being the shortest on the National Rail network, at just Шаблон:Convert.[2]

The line then carries on north, crossing the historic county boundary from Inverness-shire into Ross and Cromarty just before reaching Muir of Ord station,Шаблон:Efn-ua which has two platforms and is the site of the first passing loop on the line.[3] The line continues to parallel the A862 as it passes through Conon Bridge station,Шаблон:Efn-ua which reopened in 2013 in a similar style to Beauly[4] and whose platform is just Шаблон:Convert longer than that at Beauly. Shortly afterwards, the line crosses the River Conon and passes through the village of Maryburgh before reaching Dingwall stationШаблон:Efn-ua – the busiest station on the line aside from Inverness, with just over 80 thousand passengers recorded in the 2019–20 financial year.[5]

At Dingwall JunctionШаблон:Efn-ua just north of the station, the Kyle of Lochalsh line diverges to the west.[6] The Far North Line, meanwhile, rejoins the coast and continues northeast along the shoreline of the Cromarty Firth; the railway meets the A9 again shortly after, at the north end of the Cromarty Bridge.

Файл:Invergordon railway station 2017, 7251.jpg
Invergordon railway station

The next station on the line is Шаблон:Rws,Шаблон:Efn-ua which closed in 1960 but reopened 13 years later. After Alness the line turns gently eastwards to reach Invergordon stationШаблон:Efn-ua before turning northeast again. The line continues in this direction for nearly Шаблон:Convert without another station until Шаблон:Rws.Шаблон:Efn-ua Located approximately Шаблон:Convert west of Hill of Fearn, the primary source of traffic at the station, it is also the nearest railway stop to the Seaboard Villages. The railway then takes a sharp turn to run northwest for approximately Шаблон:Convert until it reaches Tain stationШаблон:Efn-ua on the south side of the Dornoch Firth.

Tain–Helmsdale: Lairg loop and the Sutherland coast

A short distance west of Tain, the Far North Line and the A9 part ways again – while the road crosses the Dornoch Firth by means of [[Dornoch Firth Bridge|a Шаблон:Convert bridge]],Шаблон:Efn the railway line instead follows the coast of the Firth. In fact, the railway does not return to an open coastline for another Шаблон:Convert until Golspie, even though the distance between Tain and Golspie as the crow flies is only Шаблон:Convert. There have been many unsuccessful proposals to build a new, shorter railway line between the two villages via Dornoch,Шаблон:Efn which led to the existing route via Lairg being sometimes unofficially called the "Lairg loop".[7]

Soon after the A9 splits away, the line crosses the lieutenancy area boundary from Ross and Cromarty into Sutherland. The track follows the route of the A836 until the next station on the line, Шаблон:Rws,Шаблон:Efn-ua at the end of the Dornoch Firth. The station is in the village of Ardgay and also serves the slightly larger village of Bonar Bridge on the opposite side of the Kyle of Sutherland.

Файл:Oykel Viaduct over the Kyle of Sutherland - geograph.org.uk - 2967014.jpg
Invershin Viaduct over the Kyle of Sutherland; the public footpath across the Kyle can be seen immediately adjacent to the viaduct.

From Ardgay, the line runs northwards alongside the Kyle, and after just over Шаблон:Convert it reaches the first two request stops en route – Шаблон:RwsШаблон:Efn-ua and Шаблон:Rws,Шаблон:Efn-ua which lie on either side of the Invershin Viaduct over the Kyle. At just Шаблон:Convert, the distance between these two stations is among the shortest in all of Britain.[8]Шаблон:Efn There is no direct road connection between the two sides of the Kyle at this location, and a public footpath was only built alongside the viaduct in 2000; prior to this, the railway was the only way to travel between the two stations without taking a Шаблон:Convert detour via Bonar Bridge. The Kyle once also marked the boundary between the historic counties of Ross and Cromarty and Sutherland; however, the modern boundary between the respective lieutenancy areas lies several miles to the south, putting both stations in modern-day Sutherland.

Файл:Lairg Station Footbridge - geograph.org.uk - 2919027.jpg
Lairg railway station

The track then continues northwards along the River Shin for another Шаблон:Convert until it reaches Lairg station,Шаблон:Efn-ua located about Шаблон:Convert south of the village itself. This is the furthest point away from the coast on the Lairg loop; beyond the station the line curves sharply eastwards and heads back towards the Moray Firth along Strath Fleet, now paralleling the A839 road. The line then passes through another request stop, Шаблон:Rws,Шаблон:Efn-ua which actually lies in the small hamlet of Pittentrail and about Шаблон:Convert south of Rogart itself; the station briefly closed in 1960, only to be reopened less than 9 months later. Immediately east of the station there is an open level crossing – one of only two on the line.[3] Шаблон:Convert after Rogart, the railway meets the A9 again, as it passes by Mound Alderwoods and Loch Fleet. This was once the site of The Mound station and a junction with the Dornoch Light Railway to Dornoch;[9] both the station and the branch closed in 1960.[10] The railway then turns northeast and returns to the coast at Golspie, with the stationШаблон:Efn-ua located at the western end of the village.

Файл:Dunrobin Castle station.jpg
Dunrobin Castle railway station

Just east of Golspie, the line meets Dunrobin Castle station,Шаблон:Efn-ua which was built as a private, single-platform halt for the Duke of Sutherland to serve Dunrobin Castle a short distance south of the track.Шаблон:Sfn The station closed in 1965 but reopened in 1985;Шаблон:Sfn today, the station is a public request stop, although it is only open during the summer months (one of only two such stations on the National Rail network, alongside Шаблон:Rws elsewhere in Scotland),[11] corresponding to the castle's annual opening times.[12] The station is also notable for its lack of lighting; as such, no trains are scheduled to call at the platform before 9 am or after about 6 pm.[11]

The line continues along the coast for another Шаблон:Convert, occasionally coming just metres away from the shoreline, passing through Brora stationШаблон:Efn-ua before reaching the village of Helmsdale, located at the mouth of the river of the same name. Helmsdale stationШаблон:Efn-ua lies on the other side of the river from most of the village.

Шаблон:Clear left

Helmsdale–Wick/Thurso: Strath of Kildonan and Caithness

Файл:Kildonan Railway Station, September 2018.jpg
Kildonan railway station
Файл:Altnabreac Station Approaching Train to Wick (16351516469).jpg
An Abellio ScotRail Class 158 (158720 "Inverness & Nairn Railway - 150 years") heads into Altnabreac station.
Файл:Georgemas.jpg
The platform and freight terminal at Georgemas Junction station, looking west towards Inverness; the branch to Thurso can be seen diverging off the main line to the right immediately beyond the platform.

Beyond Helmsdale, the railway is forced to divert away from the Moray Firth coast and from the A9 once again, avoiding the unfavourable terrain of the Ord of Caithness. Instead, the line takes a sharp turn northwest and heads inland towards the Flow Country – the largest expanse of blanket bog in Europe. This is by far the most remote section of the entire line: the majority of the intermediate stations along this stretch are request stops,[11] and each station only serves a handful of isolated houses.

Initially, the single track follows the course of the Strath of Kildonan together with the A897. Kildonan station,Шаблон:Efn-ua one of the least-used stations on the line,[5] lies approximately halfway along the Strath; the second open level crossing on the line is just to the southeast of the station.[3] The far end of the Strath, close to the point where the A897 meets the B871 road, marks the location of Kinbrace station.Шаблон:Efn-ua

Beyond Kinbrace, in stark contrast to the rest of the line (and most of the Scottish Highlands), the topography of the surrounding area becomes flat and low-lying, and will remain so until the railway's two northern termini. The line carries on northwards alongside the A897 for Шаблон:Convert until it reaches Forsinard stationШаблон:Efn-ua which, despite its isolation, is not a request stop.[11] With two platforms, this station is the last place on the line where passenger trains running in opposite directions can pass each other.[3] The station serves the Forsinard Flows National Nature Reserve, among other nearby parts of the Flow Country; an RSPB visitor centre is adjacent to the station platforms. At Forsinard, the line crosses the A897, turns east-northeast, and does not meet another public road for over Шаблон:Convert. Soon, the line leaves the county of Sutherland and enters Caithness.

As the track passes through Caithness countryside, it eventually reaches Altnabreac station.Шаблон:Efn-ua This single-platform halt is often listed as one of Britain's most geographically isolated railway stations, being about Шаблон:Convert from the nearest village and Шаблон:Convert from the nearest paved road.[8] There are, however, a handful of houses in the immediate vicinity of the station, accessed by a private dirt road, which is marked as a public cycle trail on Ordnance Survey maps.

The line then turns gently to the northeast, passing by several small lochs en route, before passing under the B870 road (the first public road close to the line since Forsinard). This is the site of Scotscalder station,Шаблон:Efn-ua which is among the least-used stations on the line, typically averaging less than 1 passenger per day.[5] After another Шаблон:Convert, the track passes south of Halkirk – the first unscattered village in over Шаблон:Convert, although there is no longer a railway station serving it (the old stationШаблон:Efn-ua having closed in 1960 along with 19 others on the line). The line reaches its penultimate station, Шаблон:Rws,Шаблон:Efn-ua at the point where the line crosses the A9 again. Adjoining the station on the south side is a freight terminal built in 2012 by Direct Rail Services; this was used by trains taking nuclear material from Dounreay to Sellafield.[13]

Шаблон:Multiple image At Georgemas Junction, which is not a request stop, the lines to Thurso and Wick diverge; this is the northernmost railway junction in the United Kingdom.[3] The Wick-facing Thurso branch curves north immediately west of the station and runs alongside the River Thurso, paralleling the A9 until it reaches Thurso stationШаблон:Efn-ua – the northernmost railway station in Britain, by the northern coast of Scotland. Thurso is the nearest station to the ferry terminal at Scrabster, which has ferry services to and from the town of Stromness in the Orkney Islands. Meanwhile, the main line to Wick continues in an east-southeasterly direction, sandwiched between the A882 and B874 roads, and terminates at Wick stationШаблон:Efn-ua on the east coast. At Шаблон:Convert, the distance between Georgemas Junction and Wick is the longest between any two adjacent stations on the line,[3] although three other stations existed along this stretch until 1960. Wick is the nearest station to Wick Airport as well as to the village of John o' Groats (approximately Шаблон:Convert to the north) at the northeastern tip of mainland Britain, which is linked to the town by a bus service operated by Stagecoach Highlands.

Infrastructure

The full line between Шаблон:Rws and Шаблон:Rws (excluding the Thurso branch) is Шаблон:Convert long; the Шаблон:Rws branch has a length of Шаблон:Convert.[3] The whole line is unelectrified.[3] Despite its considerable length and passing through the mostly mountainous Scottish Highlands, there are no tunnels on the line.[3]

The line is almost entirely single-track, but there are 10 double-track passing loops along the route, which allow trains to pass each other: these are at Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws and Шаблон:Rws.[3] The loops at Rogart and Brora are not timetabled to be the passing place for any scheduled passenger services,[11] but they can be used as such during major disruption on the line.

The whole line north of the former Clunes station (about Шаблон:Convert west of Inverness), together with the Kyle of Lochalsh line, are signalled using the Radio Electronic Token Block system, which is very cost-effective in both implementation and maintenance, but significantly limits the capacity of the lines.[14]

"Press & Ride" request stops

Between 2022 and 2023, the Far North Line became the first railway line in the United Kingdom to implement a new "Press & Ride" system for its request stops.[15]

Under the traditional system (still in use on the rest of the National Rail network), passengers wishing to board the train at a request stop had to flag the train by raising their arm; this meant that the driver needed to reduce the train's speed before a request stop (to look out for any potential passengers on the platform and be able to stop if necessary), even if the platform was empty. The new system, developed by Transport Scotland, envisaged the installation of an automatic kiosk (with a button for passengers to press) at each request stop. This alerts the driver about any waiting passengers in advance; if there is no requirement to stop, the train can maintain line speed through the station, thus improving reliability on the whole line.[16]

The first of these kiosks was installed at Шаблон:Rws on Шаблон:Date on a trial basis.[17][15] Following the successful trial, the system was expanded on Шаблон:Date to cover five more request stops on the line, namely Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws and Шаблон:Rws.[18] A further kiosk was added at Шаблон:Rws in Шаблон:Date.[19] The last kiosk, at Шаблон:Rws, was also expected to be in operation from spring 2023;[18] however, this has been delayed indefinitely, reportedly due to local homeowners blocking access to the station,[20] and Шаблон:Asof the kiosk is yet to be installed.

History

Файл:Dingwall geograph-2565738-by-Ben-Brooksbank.jpg
The steam engine from the Dornoch Branch shunting the goods yard at Шаблон:Stnlnk

Шаблон:Main

Pre-Nationalisation

The line was built in several stages:

Much of the work was done by the Inverness-based Highland Railway company or, when completed, taken over by that company. In 1923 the Highland Railway was grouped into the London, Midland and Scottish Railway, under the Railways Act 1921.

Like railway lines generally in Britain, the line was not a product of any strategic plan, but was an ad hoc development, facilitated by Private Acts of Parliament (which were themselves a significant expense for developers) and dependent on cooperation between companies and individuals, each with their own private vested interests. The line became strategically important during World War I and World War II as part of a supply route for Scapa Flow, Orkney.

That the line extends beyond Ardgay in the county of Ross and Cromarty is due, to a large extent, to the railway enthusiasm (some might say madness) of the 3rd Duke of Sutherland. The duke realised his dream of running his own private train to and from his own station at Dunrobin Castle.

The duke's enthusiasm took the line as far as Gartymore, a little south of Helmsdale, in the county of Sutherland, but this development was more of a financial liability than an asset: the long-term viability of the line then depended on a Caithness willingness, not least from the 17th Earl of Caithness, to link the line to the population centres of Wick and Thurso.

North of Helmsdale the line was built by the Sutherland and Caithness Railway. Turning inland, it reaches Forsinard in the Flow Country. The building of the line through the Flow Country – one of the most scarcely populated parts of Scotland – was to avoid the Berriedale Braes. North of Helmsdale as far as Lybster, it would have been impractical to build a railway without massive civil engineering projects. Thus coastal villages such as Latheron and Lybster are not served by the line.

In 1902, under the provisions of the Light Railways Act 1896, the standard gauge Wick and Lybster Railway was built along the east coast of Caithness, running south from Wick to Lybster.Шаблон:Efn This line was never profitable, and it closed in 1944.

Historic branch lines also served Dornoch and the Black Isle.

1989–90 flooding

On 7 February 1989, Ness Viaduct, just west of Inverness station, collapsed in unprecedented flooding. The remaining Шаблон:Convert of network to Kyle of Lochalsh and The Far North line had to be operated from a temporary maintenance site at Muir of Ord. A new viaduct was opened in time for the 1990 summer season on 14 May 1990.[21]

Services

Current passenger services

Файл:158704 at Invergordon 20210923 094435.jpg
A train calling at Invergordon station
Файл:A Train in Tain (geograph 5791379).jpg
Tain station is the terminus for some Far North Line services.
Файл:Class 158 at Kinbrace Crossing (geograph 2736445).jpg
Kinbrace station is a request stop.

All passenger trains are operated by ScotRail using Class 158 "Express Sprinter" diesel multiple units. The exact stopping pattern varies between each station, as not all trains run the full length of the Far North Line. All passenger services on the line start or terminate at Шаблон:Rws.[11]

The service pattern is infrequent and very irregular, with intervals between consecutive trains at Inverness varying from just 15 minutes to as long as two-and-a-half hours.[11] As of 2022, on weekdays (including Saturdays), there are 14 trains per day (tpd) arriving at Inverness from the north, and 12 northbound departures:[11]

On Sundays the services are even less frequent, with just 1 tpd (2 in the summer) to/from Kyle of Lochalsh, 1 tpd to/from Invergordon, 3 tpd to/from Tain, and just a single train each way running all the way to/from Wick.

With the exception of some Wick services,Шаблон:Efn all trains are timetabled to stop at every intermediate station.[11] Dunrobin Castle station is only open during the summer months; no services call there in the winter.

The stations at Шаблон:Rws, Шаблон:Rws, Шаблон:Rws, Dunrobin Castle, Шаблон:Rws, Шаблон:Rws, Шаблон:Rws and Шаблон:Rws are designated as request stops: passengers wishing to board the train at these stations must press a button at a designated kiosk on the platform (except at Altnabreac, where passengers need to flag the train by raising their arm – see above), while those wishing to alight must inform the on-board guard to arrange for the train to stop. If there are no passengers wishing to get on or off the train, it will pass through without stopping.[11]

Since 2000, trains to and from Wick have run via Thurso. On arrival at Georgemas Junction from Inverness, trains reverse to serve Thurso, then reverse again from Thurso to run back to Georgemas Junction (stopping there for a second time) and continue on to Wick. This procedure is mirrored for Inverness-bound services.[11]

Services between Inverness and Wick typically have a journey time of about 4 hours 20 minutes end-to-end.[11]

Freight

Шаблон:Rws has been used for freight handling and had a new railhead opened in 2012 for the transportation of nuclear flasks, but the terminal has not attracted any commercial operators since.[22] In 2020, a trial project funded by a £195,000 grant from the Scottish Government saw timber transported from Georgemas Junction to a processing facility near Inverness by Victa Railfreight.[23][24]

Previous services

1923–1948 (London Midland and Scottish Railway)

The London, Midland and Scottish Railway introduced two titled trains in 1936, the Orcadian and John O'Groat.[25]

1948–1997 (British Rail Scottish Region)

Файл:Muir of Ord railway station in 1988.jpg
A Class 37 at Шаблон:Rws in 1988

In 1963, the line was listed for closure on the Beeching Report; however, the Far North Line remained open due to pressure from protesters.[26]

Following the elimination of steam traction by the early 1960s, trains on the line were normally hauled by Inverness allocated Class 24 diesel locomotives (D5114-32), then subsequently by Class 26 diesel locomotives. In the 1980s these were replaced by more powerful Class 37 locomotives, still with Mark 1 rolling stock. These were replaced by Class 156s in the 1990s by British Rail. Three trains each way per day (Mon-Sat) was the standard service pattern at this time.

1997–2004 (ScotRail)

Файл:Thurso station - geograph.org.uk - 1724781.jpg
A Class 158 leaving Шаблон:Rws with a service to Inverness

The service provided by ScotRail replicated that provided in the latter years of BR Scottish Region. ScotRail was owned by ScotRail (National Express) until 17 October 2004 when First ScotRail took over the franchise.

Until 2000, when the line was served by Шаблон:Brcs, trains to Caithness were split at Шаблон:Rws – one half of the train would continue to Шаблон:Rws and the other to Шаблон:Rws. This practice ended when Шаблон:Brcs were introduced on the line, adopting the current calling pattern. Шаблон:Expand section

2005–2015 (First ScotRail)

Along the full length of the line there were four services each way Monday to Saturday, including a service allowing a connection from the Orkney ferry, and one service each way on Sundays. In the Winter 2008/9 timetable the number of trains to and from Wick was increased to four each way on Mondays to Saturdays.

First ScotRail also operated a number of shorter distance services on the line from Inverness terminating at Шаблон:Rws and Шаблон:Rws, as an alternative commuter route to Inverness in addition to the A9 road.

Passenger volumes

PassengerШаблон:NbspvolumesШаблон:NbsponШаблон:NbsptheШаблон:NbspFarШаблон:NbspNorthШаблон:NbspLine[5] 
(StationsШаблон:NbspinШаблон:NbspitalicsШаблон:NbspareШаблон:NbsprequestШаблон:Nbspstops)
Entries and exits 2002-03 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23
Шаблон:HsШаблон:Rws 721,358 822,928 873,011 915,840 975,570 1,043,712 1,070,924 1,127,718 1,180,160 1,213,382 1,282,445 1,303,662 1,306,556 1,259,496 1,238,770 1,243,338 1,214,648 231,894 753,228 974,808
Шаблон:HsШаблон:Rws 21,337 26,616 28,384 35,860 41,878 52,422 51,094 49,858 54,536 55,236 57,946 57,446 59,406 52,870 51,522 48,270 46,510 14,918 30,178 36,588
Шаблон:HsШаблон:Rws 22,055 24,365 24,783 32,573 39,200 51,104 57,396 62,428 74,462 74,064 72,832 66,576 66,480 64,480 64,820 67,554 70,850 13,556 41,230 47,688
Шаблон:HsШаблон:RwsШаблон:Efn 0 0 0 0 0 0 0 0 0 3,788 18,114 15,510 15,276 15,494 15,100 17,530 18,022 2,598 9,212 10,898
Шаблон:HsШаблон:Rws 31,849 34,898 43,508 55,034 64,404 72,086 80,324 84,920 101,730 104,746 101,996 87,782 82,508 80,900 86,276 81,408 80,154 9,864 46,524 55,536
Шаблон:HsШаблон:Rws 3,717 6,950 7,633 9,822 11,550 13,722 14,306 17,782 25,498 28,384 27,796 25,934 23,614 26,376 29,272 30,426 27,050 3,220 15,810 16,804
Шаблон:HsШаблон:Rws 7,069 8,109 9,195 12,949 15,853 19,974 20,648 23,444 34,564 34,974 36,355 31,962 29,054 27,886 28,958 28,806 27,826 3,134 13,308 18,758
Шаблон:HsШаблон:Rws 1,909 5,157 5,143 6,069 5,581 7,724 6,790 6,720 7,818 7,226 6,606 6,130 5,396 5,262 5,256 4,304 4,182 850 2,980 3,754
Шаблон:HsШаблон:Rws 10,883 11,174 13,837 18,521 20,847 23,922 24,340 26,944 33,638 34,016 34,578 30,004 27,896 28,622 29,774 29,384 28,036 3,522 19,664 19,606
Шаблон:HsШаблон:Rws 2,503 2,297 3,067 3,964 5,851 6,516 7,388 7,404 8,890 8,108 8,806 8,416 6,732 7,144 7,140 6,998 6,408 624 3,968 4,412
Шаблон:HsШаблон:Rws 1,756 2,016 1,707 1,771 1,785 1,886 1,722 1,708 526 474 628 530 432 372 300 280 312 42 164 304
Шаблон:HsШаблон:Rws 287 229 408 199 310 220 282 512 386 690 790 486 706 826 438 284 216 50 210 232
Шаблон:HsШаблон:Rws 4,326 4,096 4,126 3,724 4,790 5,280 5,542 6,098 6,330 6,176 7,440 7,514 6,592 5,576 5,426 6,016 6,264 742 2,960 3,348
Шаблон:HsШаблон:Rws 1,503 1,633 1,645 1,356 1,472 1,538 1,844 1,456 1,736 1,662 1,662 1,522 1,710 1,948 1,630 1,574 1,656 150 992 884
Шаблон:HsШаблон:Rws 7,032 7,530 7,429 6,956 7,587 9,154 8,486 8,092 6,852 7,550 7,788 6,770 5,192 5,718 5,786 6,150 5,586 576 4,536 4,056
Шаблон:HsШаблон:Rws 191 299 357 357 423 572 488 594 628 628 916 822 782 882 1,030 1,224 1,240 114 770 1,428
Шаблон:HsШаблон:Rws 4,024 3,462 3,483 3,277 3,723 4,660 5,614 5,780 5,164 5,556 6,380 5,616 5,524 5,616 5,994 6,992 6,354 648 4,722 4,594
Шаблон:HsШаблон:Rws 3,972 3,513 3,514 4,456 5,348 5,646 5,680 5,656 6,086 5,828 5,778 5,096 6,204 5,768 4,636 5,044 5,086 564 3,168 3,484
Шаблон:HsШаблон:Rws 89 145 165 231 244 174 204 142 240 62 144 96 170 76 206 168 214 16 140 148
Шаблон:HsШаблон:Rws 754 518 562 537 737 792 410 448 778 1,090 1,092 528 456 464 376 510 456 44 370 436
Шаблон:HsШаблон:Rws 1,432 1,674 1,497 1,098 1,256 1,836 1,496 1,770 1,970 2,088 1,718 1,456 1,516 2,124 2,210 2,530 2,866 160 660 936
Шаблон:HsШаблон:Rws 93 164 171 222 177 212 156 172 238 296 138 240 312 356 658 408 232 46 230 280
Шаблон:HsШаблон:Rws 208 187 212 142 212 256 184 246 214 460 376 388 294 200 182 238 232 18 116 124
Шаблон:HsШаблон:Rws 1,129 1,108 1,018 989 893 1,500 1,482 1,630 1,682 1,906 1,652 1,696 1,572 1,502 1,320 1,576 1,570 234 1,032 1,318
Шаблон:HsШаблон:Rws 38,112 37,338 35,083 32,906 37,064 43,450 47,792 48,172 48,090 46,024 43,802 42,082 38,426 37,322 39,174 39,974 39,702 6,474 25,200 31,446
Шаблон:HsШаблон:Rws 19,566 19,582 19,079 17,321 20,202 21,708 24,454 25,666 24,838 22,788 21,884 21,442 19,766 18,438 17,546 17,890 16,664 3,442 12,980 14,924

The statistics cover twelve-month periods that start in April.

Future

Electrification

In the Scottish Government's National Transport Strategy, published in February 2020, it was stated that the section between Inverness and Tain would be electrified with overhead lines by 2035; an alternative to diesel traction - ostensibly hydrogen - would be used for the remainder of the route.[27]

Delmore Loop

There are plans to construct a new passing loop between Inverness and Beauly.[28]

Proposals

Lairg loop bypass

For many years there have been proposals to bypass the Lairg loop with a line across the Dornoch Firth, linking Tain more directly with Golspie via Dornoch.[29]Шаблон:Efn British Rail attempted to get funding for this when the road bridge was built, but the government declined.[30] On 6 March 1987 the government confirmed that it would not fund the project.[31]

This project would involve building a new bridge over the Dornoch Firth, or making the existing A9 road bridgeШаблон:Efn dual-purpose. Discussions have been held concerning the shortening of the Far North Line involving a bridge over the Firth and the possible use of the trackbed of the former light railway;[7][32] however, there have been no confirmed plans for such a shortcut to date.

New stations

Following the successful campaigns to reopen the previously closed stations at Шаблон:Rws in 2002[1] and at Шаблон:Rws in 2013,[4] there have been several proposals to reopen more stations on the line. One campaign, supported by the Highland Council and HITRANS, seeks to build a new station at Шаблон:Rws (between Dingwall and Alness), which was closed in 1960.[33] The Friends of the Far North Line campaign group, meanwhile, proposes the reopening of Halkirk station near Georgemas Junction; it also looks into the possibility of constructing a new curve of track at Georgemas so that trains could serve the Thurso branch directly, without having to reverse at Georgemas Junction station.[34]

Notes

Шаблон:Notelist-ua Шаблон:Notelist Шаблон:Reflist

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:Railway lines in Scotland