Английская Википедия:Fukuhoku Yutaka Line
Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску
Шаблон:Short descriptionШаблон:Use dmy dates
The Шаблон:Nihongo is the collective name for four sections of railway lines operated by Kyushu Railway Company (JR Kyushu) in Fukuoka Prefecture, Japan. It runs between Kurosaki Station and Hakata station (66.6 km).[1]
The sections called Fukuhoku Yutaka Line are:[1]
- Part of the Kagoshima Main Line, between Kurosaki Station and Orio Station - 5.2 km[2]
- Part of the Chikuhō Main Line, between Orio Station and Keisen Station - 34.5 km[3]
- The entire Sasaguri Line, between Keisen Station and Yoshizuka Station - 25.1 km[4]
- Part of the Kagoshima Main Line, between Yoshizuka Station and Hakata Station - 1.8 km[5]
Rolling stock
A pre-series two-car BEC819 series AC battery electric multiple unit (BEMU) was tested on the line from April 2016,[6] and entered revenue service on 19 October 2016.[7] This was followed by six more trainsets, entering service in spring 2017.[6]
-
The first BEC819 series BEMU set undergoing testing in June 2016
References
Шаблон:Fukuoka transit Шаблон:Kyushu Railway Company Lines