Шаблон:Short description Шаблон:Infobox power station The Fuqing Nuclear Power Plant (Шаблон:Zh) is a nuclear power plant in Fuqing, Fujian Province, China. The plant is located on the coast of Xinghua Bay, near Qianxue Village, Sanshan Town.[1] The station has four 1,089 megawatt (MW) CPR-1000 pressurized water reactors (PWRs).[2] The CPR-1000 is an advanced PWR design developed by China from the Areva-designed PWRs at the Daya Bay Nuclear Power Plant.[3] The plant was jointly constructed and is operated by China National Nuclear Corporation (51%), China Huadian Corp. (39%) and the Fujian Investment & Development Co Ltd. (10%).

Construction of the first unit began on 21 November 2008[2] and was completed in 2014. First concrete for Unit 2 was poured on 17 June 2009[4] and the unit was started in October 2015. First concrete for Unit 3 was poured on 31 December 2010. Construction of Unit 4 was to begin in 2011, but was delayed until November 2012 by China's nuclear safety review following the Fukushima nuclear disaster.

In November 2014 it was announced that units 5 and 6 would be of the Hualong One (updated CPR-1000) design, with unit 5 scheduled to be in operation about 2019.[5] The first concrete was poured for Fuqing 5 on 7 May 2015.[6] Unit 5 achieved criticality in October 2020, the first Hualong One reactor to reach the milestone.[7] The unit was connected to the grid the following month.[8] It began commercial operation on 30 January 2021.[9] Unit 6 achieved criticality in December 2021, was connected to the grid in January 2022,[10] and began commercial operation on 25 March 2022.[11]

Reactor data

The Fuqing Nuclear Power Plant consist of 6 operational reactors.

Unit Type / Model Net power Gross power Thermal power Start construction First criticality Grid connection Commercial operation Notes
Phase I
Fuqing 1 PWR / CNP-1000 1000MW 1089MW 2905MW 2008-11-21 2014-07-24 2014-08-20 2014-11-22 [3][12]
Fuqing 2 PWR / CNP-1000 1000MW 1089MW 2905MW 2009-6-18 2015-07-22 2015-08-06 2015-10-16 [4][13]
Phase II
Fuqing 3 PWR / CNP-1000 1000MW 1089MW 2905MW 2010-12-31 2016-07-03 2016-09-07 2016-10-24 [14][15][16]
Fuqing 4 PWR / CNP-1000 1000MW 1089MW 2905MW 2012-11-17 2017-07-16 2017-07-29 2017-09-17 [2][17]
Fuqing 5 PWR / HPR-1000 1060MW 1150MW 3060MW 2015-05-07 2020-10-21 2020-11-27 2021-01-30 [6][18]
Fuqing 6 PWR / HPR-1000 1060MW 1150MW 3060MW 2015-12-22 2021-12-13 2022-01-01 2022-03-25 [19][20]