Английская Википедия:Future of rail transport in India

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use Indian English Шаблон:Use dmy dates The Indian Government is undertaking several initiatives to upgrade its aging railway infrastructure and enhance its quality of service. The Railway Ministry has announced plans to invest Шаблон:INRConvert to upgrade the railways by 2030.[1] Upgrades include 100% electrification of railways, upgrading existing lines with more facilities and higher speeds, expansion of new lines, upgrading railway stations, introducing and eventually developing a large high-speed train network interconnecting major cities in different parts of India and development of various dedicated freight corridors to cut down cargo costs within the country.

The Research Design and Standards Organisation (RDSO) is undertaking all research, designs and standardisation work for modernisation, National High Speed Rail Corporation Limited (NHSRCL) is overlooking the implementation of high-speed train programs across the country, Dedicated Freight Corridor Corporation of India (DFCCI) is the agency undertaking development of freight corridors around the country and Indian Railway Stations Development Corporation (IRSDC) is engaged in railway stations upgrade and development programs.

Trains

Semi-high-speed rail

A semi-high-speed rail network will be introduced for connecting important routes, including Delhi–Agra, Delhi–Kanpur, Chennai–Hyderabad, Nagpur–Secunderabad, Mumbai–Pune–Solapur–Hyderabad and Mumbai–Goa. Initially, the trains will operate at a maximum speed of 160 km/h, which will be increased to 200 km/h after the rails are strengthened and fenced off. The Gatimaan Express began services on April 5, 2016, after safety clearances were obtained on its first route.[2][3] Currently, Vande Bharat Express is the fastest train running on 41 routes with highest trail speed of 183 km/hr, with potential of reaching upto 200 km/hr.[4]

Mission Raftaar was announced in the Railway Budget of 2016-17 with the target of increasing the average speed of freight and superfast mail/express trains.The railway is focusing on the New Delhi-Mumbai and New Delhi-Howrah routes as part of the Golden Quadrilateral. Mission Raftar compromises several measures have been taken to achieve the medium- and long-term goals of Mission Raftaar, including the construction of tracks, bridges, rail flyovers, bypasses, right-powering of trains, third and fourth line construction, replacement of conventional loco-hauled trains by MEMUs, changes in timetable, and modification of the 1×25 KV traction system to the 2×25 KV traction system, among others.[5][6]

The country has made target of have 4,500 Vande Bharat trains running across India by 2047.[7] Indian Railways have planned to introduce Vande Bharat trains in inner parts of India such as Ranchi-Puri, Raipur-Ranchi, Indore-Pune, Raipur-Varanasi, Indore-Lucknow, Ranchi-Varanasi to increase connectivity and economic development.[8][9] Indian Railways will soon start the upgradation of tracks with high strength rails (R-350).The railways has started the work to increase the design speed limit of the next-generation Vande Bharat sleeper trains to 220 kmph and work has also started to improve the Delhi-Mumbai and Delhi-Howrah lines to allow trains to run at 160 km/hr.[10]

Dedicated freight corridors(dfc)

Dedicated freight corridors of 3,300 km length will also be completed thus freeing the dual use high demand trunk routes for running more high-speed passenger trains.[11] The project will continue to figure on the high priority list of all the government agencies associated with it. DFCs will help India reduce its high logistics costs from some 13-15 per cent of the GDP and help it move towards the target of 8 per cent.[12]

Till date in the commissioned sections, a total of 4000 trains have been run. Some of the trains in the section are achieving the average speed of 99.38 kmph in EDFC and the average speed is 89.50 kmph in WDFC.[13][14][15] Passenger train such as Vande Bharat Express have already ran on DFC tracks during exigencies.[16][17]

High-speed rail

Шаблон:Main The Indian government conducted joint surveys with a Japanese government team in 2014, finally approving a corridor between Mumbai and Ahmedabad. The new high-speed service will use a Japanese Shinkansen system and rolling stock. The cost of procuring the technology is estimated to be around Шаблон:INRConvert. India and Japan signed agreements for the project in December 2015; the Japanese government will fund 81% of the total cost with a soft loan fixed at a nominal interest rate.[18] A special committee has recommended the trains be run on an elevated corridor for an additional cost of Шаблон:INRConvert, to avoid the difficulties of acquiring land, building underpasses and constructing protective fencing.[19] Indian Railways will operate the corridor for a five-year period after its commissioning and afterwards will be turned over to a private operator.[20]

Construction work of the corridor began in 2017 and will be completed by 2028.[21] However, there is uncertainty in other routes as many of the routes have been junked as unfeasible.[22]

Rolling stock

Modern locomotive factories

Шаблон:See also In 2015, plans were disclosed for the construction of two locomotive factories with foreign partnerships in the state of Bihar, at Madhepura (electric) and at Marhowra (diesel). The diesel locomotive works will be jointly operated in a partnership with General Electric, which has invested Шаблон:INRConvert for its construction and the electric locomotive works with Alstom, which has invested Шаблон:INRConvert. The factories will provide IR with 800 electric locomotives of 12,000 horsepower and a mix of 1,000 diesel locomotives of 4,500 and 6,000 horsepower each.[23] In November 2015, it was announced IR and GE would engage in an 11-year joint venture in which GE would hold a majority stake of 74%. IR would purchase 100 goods locomotives a year for 10 years, beginning in 2017; the locomotives would be modified versions of the GE Evolution series.[24] The diesel locomotive works will be built by 2018; GE will import the first 100 locomotives and manufacture the remaining 900 in India from 2019 onwards, also assuming responsibility for their maintenance over a 13-year period.[25]Шаблон:Update inline In the same month, a Шаблон:INRConvert partnership with Alstom to supply 800 electric locomotives from 2018 to 2028 was announced.[26]

Indian Railways is now moving to manufacturing high-end aluminium self-propelled 160 km/hour indigenous Make in India coaches that require no locomotive and are 10% cheaper than the comparable imports. The first such self-propelled train, Vande Bharat Express, was rolled out in October 2018. It is estimated to be 40% cheaper than foreign-built trains. By 2020 an even cheaper and lighter aluminum version is planned to follow.[27]

Railway coach refurbishment

Railway coach refurbishment project aims for the refurbishment of 12 to 15 years old coaches at Carriage Rehabilitation Workshop in Bhopal to enhance passenger amenities and fire safety measures.[28][29]

Bio-toilets in all trains

In 2014, IR and DRDO developed a bio-toilet to replace direct-discharge toilets, which was the primary type of toilet used in railway coaches.[30] Upgrade of all trains to bio-toilet was completed by the end of fy2018-19 (c. Dec 2017).[31]

The direct discharge of human waste from trains onto the tracks corrodes rails, costing IR tens of millions of rupees a year in rail-replacement work. Flushing a bio-toilet discharges human waste into an underfloor holding tank where anaerobic bacteria remove harmful pathogens and break the waste down into neutral water and methane, which can then be harmlessly discharged onto the tracks.[30] IR plans to completely phase out direct-discharge toilets by 2020 or 2021. All-new coaches were installed in 2016, with older rolling stock to gradually becoming retrofitted. After Comptroller and Auditor General of India found 200,000 complaints related to the foul smelling and blocked bio-toilets, IR announced that it will add 80,000 bio-toilets (each costing INR 1 lakh) in fy2018-2019 and will start installing much improved "vacuum bio-toilets" (each costing INR 2.5 lakh) as well.[32] By Feb 2018, over 100,000 biotoilets have been installed and the project is on target to have 100% biotoilets by 31 March 2019.[33]

Hyperloop

Mumbai–Pune hyperloop

Mumbai–Pune hyperloop is a proposed 1000 km/h Hyperloop system that will take 14 minutes compared to current 3 hours to commute between these two cities while carrying 10,000 commuters per hour (5,000 in each direction). The route is found feasible and can be made operational by 2026 as per the Detailed Project Report (DPR) submitted to "Pune Metropolitan Region Development Authority" (PMRDA) by "Virgin Hyperloop company" in January 2018. Commuters and cargo will travel in pods traveling in the near-vacuum tubes at the speed of 1,000 km/h. DPR provided three feasible terminal end-points options in Mumbai, namely Dadar, Santacruz and the international airport. Currently, 300,000 people commute between these two cities daily in 110,000 vehicles (including 80,000 cars and 6,000 buses).[34] (as of Jan 2018)

Infrastructure

Stations

Station redevelopment

Under a INR 1 trillion initiative,[35] 600[35] railway stations will be redeveloped by monetizing 2700 acres of spare railway land under the Шаблон:INRConvert plan undertaken by Indian Railway Stations Development Corporation by converging it with the Atal Mission for Rejuvenation and Urban Transformation and Smart Cities Mission in collaboration with Ministry of Urban Development, Rail Land Development Authority and National Buildings Construction Corporation. Following monetization of land, Шаблон:INRConvert will be used for the commercial development, Шаблон:INRConvert for station redevelopment and the remaining Шаблон:INRConvert as surplus with the Railways. Initially A1 and A category stations will be prioritised.[36] To begin with 22 stations will be developed by end of 2018.[31]

Under Amrit Bharat Station Scheme, invited proposals in February 2023 for redeveloping 2000 stations over next decade, including the Gandhinagar railway station, Banaras railway station , Chandigarh railway station, Bijwasan railway station and Anand Vihar railway station costing Rs140 crore, Rs310 crore and Rs206 crore respective.[35]

Tracks

Dedicated freight corridors

There are 2 under implementation and 4 approved DFCs with many more planned. DFC will convert existing and implement new DFC as High-speed rail corridors of India. [11]

Geostrategic border rail lines

Шаблон:Anchor Шаблон:See also Шаблон:See also

Ministry of Defence (MoD) a list of at least 15 new geostrategic rail lines to be constructed. In 2012, MoD had identified following 14 geostrategic new rail lines to be built near China, Pakistan and Nepal border for the rapid and easier deployment of troops while simultaneously undertaking development of 73 similar geostrategic India-China Border Roads (ICBR) roads as border rail and road transport development in India is lagging much behind China:[37][38] China has built lines up to Shigatse in Tibet, with plans to connect it to Nepal and further to India.[38] After these lines proposed by MoD in 2013, GoI approved the initial surveys of all 14 lines in 2014,[39] of which at least 12 surveys had been already completed by 2014.[37] Later additional "Bilaspur–Manali–Leh line" was also added to the list of strategic lines.[40]

In 2016, the "Final Location Survey" (FLS) at the cost of INR345 crore for 4 lines to be taken up in the first phase was approved by the Cabinet, funding has been already provided by MoD and railway is undertaking survey of Missamari–Tenga–Tawang, Bilaspur–Manali–Leh, Pasighat–Tezu–Rupai and Lakhimpur–Bame–Silapathar lines.[40][41] Undulating terrain of young Himalayas and difficult geological conditions affect the pace of survey.[42][38]

As of July 2020, Cabinet approval for the funding for construction of any of these lines has not been granted yet.

Phase Line[39] length Border State FLS Cabinet construction funding approval Construction status Comment
Phase-I[40][41] Murkongselek–Pasighat–Tezu–Rupai line 227 km[40][41] China (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Missamari–Tenga–Tawang line 378 km[40][41] China, Bhutan (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Lakhimpur–Along–Silapathar line 249 km[40][41] China (Eastern sector) Arunachal Pradesh, Assam Yes No Not commenced Map
Bhanupli–Manali–Leh line 498 km[40][41] China, Pakistan (Western sector) Himachal Pradesh, Ladakh Yes No Not commenced Map
Srinagar–Kargil–Leh line China, Pakistan (Western sector) Ladakh, Jammu and Kashmir ? No Not commenced Map
Pathankot–Leh line China, Pakistan (Western sector) Ladakh, Punjab No No Not commenced Map
Dehradun–Uttarkashi line (Gangotri) China (Central sector) Uttarakhand Completed Yes Under construction, see Char Dham Railway. Map
Rishikesh–Karanprayag line (via Chamoli) (Central sector) Uttarakhand Completed Yes Under construction, also see Char Dham Railway. Map
Tanakpur–Jauljibi line Nepal (Central sector) Uttarakhand No No Not commenced Map
Tanakpur–Bageshwar line (Central sector) Uttarakhand No No Not commenced Map
Jammu–Akhnoor–Poonch line (Western sector) Jammu and Kashmir No No Not commenced Map
Patti–Ferozepur line Pakistan (Western sector) Punjab No No Not commenced Map
Anupgarh–Chattargarh–Motigarh–Bikaner line Pakistan (Western sector) Rajasthan No No Not commenced Map
Jodhpur–Agolai–Shergarh–Phalsund line Pakistan (Western sector) Rajasthan No No Not commenced Map
Jodhpur–Jaisalmer line doubling Pakistan (Western sector) Rajasthan Yes Map

Following projects along the LAC with China are also of relevance, only one of these is included in the MoD's list of strategically important defence projects, however all of these have been declared projects of strategic national importance.

Track gauge conversion

Шаблон:Main

Indian Railways is converting its entire network to Шаблон:RailGauge broad gauge to enhance viability. New and converted broad gauge tracks are being introduced at the rate of 7.7 km per day. IR has projected completion date of the same till 2022.[47][48][49][50]

Track electrification

Electrification of all routes to save on the imported fuel costs and improve running speed, IR launched "Mission Electrification" in 2017 to electrify 100% or the remaining 38,000 km of the broad gauge network in five years from fy2017-18 to fy2022-23,[51] Railways annual fuel bill is Шаблон:INRConvert, including Шаблон:INRConvert on diesel and converting to 100% electricity will save Шаблон:INRConvert by bringing the total fuel bill to Шаблон:INRConvert (c. Dec 2017).[52][51] Completion of electrification at the end of March 2021 was Шаблон:Convert or 71%.[53]

Doubling of tracks

Doubling of tracks to reduce congestion and delays while improving safety. 15,000 km double tracks already exist by 2016 and funding for 12,500 km more track doubling was approved in 2016.[50] In fy2018-19 budget, 18,000 km of broad gauge track doubling and conversion was approved along with 36,000 km of track renewal for safety.[54]

Track renewal

In FY 2018-19 budget, 36,000 km of broad gauge renewal was approved to enhance the safety.[54]

Power and fuel

Off-the-grid solar-powered trains

Off-the-grid solar powered trains by installing 1 gigawatt of solar and 130 megawatts of wind power between 2017 and 2022.[55][56] India introduced world's first solar powered train in June 2017 as well as 50 coaches with rooftop solar farms.[57] In July 2017, IR rolled out its first DEMU train with rooftop solar panels that power the lights, fans and information display systems inside passenger coaches.[58]

Rooftop solar electricity

Rooftop solar electricity at stations to reduce long-term fuel cost and protect the environment.[59]

Traintop solar electricity

In 2017, first train with solar rooftop panels started. Increasingly more trains will be operated with renewal onboard solar electricity generation.

LED lighting

Sustainable LED lighting on all stations by March 2018 to cut electricity costs (Dec 2017).[60]

Safety

Elimination of unmanned level crossings on broad gauge network

Target completion date for this is March 2020.[54] Fy2017-18 has allocated funds to eliminate remaining 4,267 unmanned railway crossings on broad gauge routes in the next two years by March 2020.[54] A Шаблон:INRConvert "National Rail Safety Fund," for a complete safety upgrade by 2022, was announced in the 2017 Union Budget; among other improvements, the program would eliminate unmanned level crossings by March 2020.[61] Elimination of Unmanned Level Crossings at an average of 1217 per year by building an average of 1066 Road Over Bridges (ROB) and Road Under Bridges (RUB) per year (May 2016).[62][50]

Automated fog pilot assistance system

GPS-enabled Fog Pilot Assistance System railway signalling devices, old practice of putting firecrackers on train tracks to alert train divers was done away with by initially installing 6,095 devices in four most affected zones in 2017, Northern Railway zone, North Central Railway zone, North Eastern Railway zone and North Western Railway zone.[63]

Automated fire alarm system

Automated fire alarm system project started from 2013 when improved automated fire alarm System in Rajdhani Express trains were installed, these will be installed in the AC coaches of all regular trains.[64]

CCTV camera on stations

963 stations will have CCTV camera by the end of 2018.[31] Progressively CCTV cameras and wifi will be installed on all trains and stations.[54]

CCTV camera inside trains

IR has started to install cameras in some of the trains from fy2017-18 under the Nirbhaya fund. Progressively CCTV cameras will be installed in all trains.[54]

Information technology

Шаблон:See also

On 7 August 2019, IRCTC launched a payment wallet named iMudra.[65][66] On 11 August 2021, IRCTC introduced a smart card system through which unreserved train tickets which can be bought either at railway stations or online.[67]

Digital India driven digitalisation of railway to improvement efficiency and reduce cost. Шаблон:INRConvert funding was approved in 2016.[50]

Services

Wi-fi-enabled trains and stations

Шаблон:See also Progressively CCTV cameras and wifi will be installed on all trains and stations (announcement c. March 2018).[54] In September 2015, the IR and Google announced a joint initiative intent on delivering high-speed wi-fi access across 400 major railway stations. The first 100 stations were connected to the network by the end of 2016, with Mumbai Central station the first to be connected.[68] The Railtel-Google free high-speed public WiFi service is currently available at Mumbai Central, Chennai Central, Chennai Egmore, Madurai Junction, Coimbatore Junction, Chandigarh, Old Delhi, Pune, Bhubaneshwar, Bhopal, Ranchi, Raipur, Vijayawada, Kacheguda, Ernakulum, Thiruvananthapuram, Thrissur, Jabalpur, Vishakhapatnam, Jaipur, Kanpur, Lucknow, Gorakhpur, Patna, Guwahati, Ujjain, Allahabad, Howrah , Varanasi, etc.[69]

Tickets

Select passengers with confirmed tickets will now be allowed to transfer tickets to someone else. Indian Railway Catering and Tourism Corporation (IRCTC) is now offering a pay-on-delivery option for train tickets on its website and app, where the customers can book their tickets and pay on delivery.

Escalators

Progressively escalators will be installed on all stations with a footfall of more than 25,000 per day.[54]

Station upgrades

600 stations will be upgraded, including 400 to be redeveloped, progressively to enhance services, safety and security.[54]

Social responsibility

Rainwater harvesting

Rainwater harvesting with 1885 rainwater harvesting systems already installed at different locations by December 2016.[70]

Reforestation

Reforestation on the railway land and along the tracks is being undertaken.[71]

See also

Шаблон:Portal

Similar roads development
Similar ports and river transport development
Similar air transport development
General

References

Шаблон:Reflist

Шаблон:Indian Railways

  1. Шаблон:Cite news
  2. Шаблон:Cite web
  3. Шаблон:Cite news
  4. Шаблон:Cite web
  5. Шаблон:Cite web
  6. https://indianrailways.gov.in/railwayboard/uploads/directorate/Mobility/Presentation/SER-SECR-WCR.pdf
  7. Шаблон:Cite web
  8. Шаблон:Cite news
  9. Шаблон:Cite web
  10. Шаблон:Cite news
  11. 11,0 11,1 Шаблон:Cite news
  12. Шаблон:Cite news
  13. https://dfccil.com/images/uploads/img/DFC-Press-Release_DFC-achieves-avg-speed-of-99.38-kmph-on-EDFC_30.05.2021_SV17.pdf
  14. Шаблон:Cite web
  15. Шаблон:Cite web
  16. Шаблон:Cite news
  17. Шаблон:Citation
  18. Шаблон:Cite news
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. Шаблон:Cite news
  22. Шаблон:Cite news
  23. Шаблон:Cite web
  24. Шаблон:Cite web
  25. Шаблон:Cite news
  26. Шаблон:Cite web
  27. Шаблон:Cite news
  28. Шаблон:Cite news
  29. Шаблон:Cite news
  30. 30,0 30,1 Шаблон:Cite web
  31. 31,0 31,1 31,2 Шаблон:Cite news
  32. Railways target 80,000 bio-toilets in 2018, vacuum bio-toilets next in line, Economic Times, 20 Dec 2017.
  33. Over 1 lakh biotoilets installed, Economic Times, 17 Mar 2018.
  34. Pune-Mumbai in 14 minutes: Firm’s project report says Hyperloop transport system feasible, Hindustan Times, 9 Jan 2018.
  35. 35,0 35,1 35,2 Indian Railways unit invites proposals to modernize 3 stations, Livemint, 17 Mar 2018.
  36. Railways appoints IRSDC as nodal agency for station redevelopment, Livemint, 5 Dec 2017.
  37. 37,0 37,1 India to lay 14 strategic railway lines near China, Pakistan border, Pakistan Today, APRIL 4, 2014.
  38. 38,0 38,1 38,2 Real reason why India is building 14 strategic rail lines, International Business Times, , Dec 1, 2016.
  39. 39,0 39,1 Government gives go-ahead to 4 strategic rail lines along China border, Indian Express, October 22, 2014.
  40. 40,0 40,1 40,2 40,3 40,4 40,5 40,6 India to construct strategic railway lines along border with China, Hindustan Times, 30 Nov 2016.
  41. 41,0 41,1 41,2 41,3 41,4 41,5 2019 target to survey 3 strategic rail lines along China border, Arunachal Observer, January 5, 2019.
  42. Defence ministry has identified 4 strategic lines, Times of India, 4 April 2018.
  43. 43,0 43,1 43,2 Good news for Chardham rail line, approved budget for this big work, Live Hindustan, 18 January 2018.
  44. Achilles Heel in India's Border Defence with China!, Indian Defence Review, 20 June 2017.
  45. After 24 years of work, strategic military outpost near India-China border connected with motorable road, Times of India, 11 Nov 2016.
  46. North East to get better Indian Railways connectivity! 5 major rail projects lined up, Financial Express, July 17, 2020.
  47. Indian narrow gauge shrinks further under Project Unigauge, The Railway Magazine, March 2017.
  48. Uni-gauge Policy of Indian Railways, 29 Jul 2016.
  49. Speeding up gauge conversion, The Hindu, 2012.
  50. 50,0 50,1 50,2 50,3 Шаблон:Cite web
  51. 51,0 51,1 Railways set to electrify 38,000 km route in next five years, Economic Times, 15 Dec 2017.
  52. Шаблон:Cite web
  53. Шаблон:Cite web
  54. 54,0 54,1 54,2 54,3 54,4 54,5 54,6 54,7 54,8 Шаблон:Cite web
  55. Шаблон:Cite news
  56. Railways, IIT-Madras tie up to power AC coaches with solar energy | News | Eco-Business - Asia's Cleantech & Sustainable Business Community. Eco-Business (5 August 2013). Retrieved on 17 August 2013.
  57. India’s new solar-powered train is the first in the world, June 2017
  58. Шаблон:Cite news
  59. Шаблон:Cite news
  60. Шаблон:Cite news
  61. Шаблон:Cite web
  62. Indian Railways commissions around 4800 kilometer of broad gauge track in last two financial years which is a record performance, 12 May 2016.
  63. "Indian Railways to use GPS-enabled devices to fight fog this season", The Economic Times, 12 December 2017.
  64. Шаблон:Cite web
  65. Шаблон:Cite web
  66. Шаблон:Cite news
  67. Шаблон:Cite news
  68. Шаблон:Cite web
  69. Шаблон:Cite news
  70. Rain Water Harvesting System In Indian Railway, 7 Dec 2016.
  71. India Plants 50 Million Trees in One Day, Smashing World Record, National Geographic, July 2016.