Шаблон:Short description Шаблон:EngvarB Шаблон:Use dmy dates Шаблон:Update The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.

Future vessels

The following is a list of vessels currently ordered or under construction for the Royal Australian Navy:

Class Ship Pennant No. Builder Type Displacement Launched Commissioning Status
Шаблон:Sclass Шаблон:HMAS OPV 203 ASC Shipbuilding, Osborne Offshore patrol vessel 1,640 tonnes 16 December 2021 2024[1] Fitting out
Шаблон:HMAS OPV 204 22 November 2023 2023?[2] Fitting out
Шаблон:HMAS OPV 205 Civmec, Henderson 2023? 2023?[3] Under construction
Шаблон:HMAS OPV 206 2024[4] February 2024[3] Under construction
Шаблон:HMAS OPV 207 December 2024[3] Under construction
Шаблон:HMAS OPV 208 June 2025[3] Ordered
Шаблон:Sclass2 ADV Cape Schanck Austal, Henderson Patrol boat, general 400 tonnes 2024 Under construction
ADV Cape Solander 2024 Under construction
TBD Ordered
TBD
Шаблон:Sclass Шаблон:HMAS BAE Systems Australia and ASC Shipbuilding, Osborne Frigate, guided missile 10,000 tonnes 2032 Ordered
Шаблон:HMAS
Шаблон:HMAS
TBD Planned
TBD
TBD
Sail training ship[5] Young Endeavour II Birdon Group Barquentine N/A Under construction

The following is a list of vessels currently planned for the Royal Australian Navy:

Class Ship Pennant No. Builder Type Displacement Launched Commissioning Status
Mine countermeasures vessel class[6] TBD Mine countermeasures vessel N/A
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Multi-role sealift and replenishment vessel class[5] TBD N/A
TBD
Шаблон:Ship replacement[5] TBD N/A
Salvage and repair vessel[5] TBD N/A
SSN-AUKUS TBD Osborne Attack submarine, nuclear-powered N/A
TBD
TBD
TBD
TBD
Virginia Class TBD TBA Attack submarine, nuclear-powered 7,900 tonnes
TBD
TBD
General Purpose Frigate Program[7] TBD Overseas (shipbuilder TBD) Frigate, helicopter 3,000 - 5,000 tonnes
TBD
TBD
TBD Henderson
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Large Optionally-Crewed Surface Vessel (LOSV) Program[8] TBD Henderson Optionally Crewed Surface Vessel N/A
TBD
TBD
TBD
TBD
TBD

Surface combatants

Anzac-class FFH

Файл:HMAS Anzac F-150.jpg
Anzac-class frigate Шаблон:HMAS

The Anzac class is the main surface combatant of the Royal Australian Navy. The first unit was commissioned in 1996 and the last entered service in 2006. Starting in November 2003, all eight frigates underwent extensive upgrades under Project SEA 1448 Phase 2, the Anzac Ship Anti-Ship Missile Defence upgrade. Completed in two phases, the following systems were upgraded and installed:

  • Upgrade to the Saab Systems 9LV 453 Combat Management System.
  • Installation of a SAGEM Vampir NG Infra-Red Search and Track System capable of detecting anti-missile and low-flying aircraft near land.
  • Installation of an Australian CEAFAR S-band phased array radar and CEAMOUNT X-band multi-channel phased array missile illuminator to deliver enhanced target detection and better tracking, allowing Evolved Sea Sparrow missiles to engage multiple targets simultaneously.
  • Installation of an I-Band navigation radar to replace existing target indication and Krupp Atlas 9600 radar systems.

Final Operating Capability is scheduled for October 2017.[9][10][11] The vessels are expected to remain in service until 2032 where they will be replaced with up to nine frigates designed primarily for anti-submarine warfare.[12] Further upgrades under the so-called AMCAP upgrade include the replacement of the ageing Air Search Radar capability with the new CEAFAR L-band long-range air search radar. Designed and produced by CEA Technologies, this new radar technology will also be part of the combat system on board the Hunter-class frigates which will replace the Anzac-class frigates. Other major work as part of AMCAP upgrade include:

  • Upgraded ventilation systems; new sewage systems;
  • Improvements to the Control and Monitoring System;
  • Engine modifications to improve power and efficiency;
  • New communications suite (SEA1442);
  • Upgraded LESCUT;
  • Upgraded AN/SLQ-25C torpedo self-defence systems; and
  • Technical insert for the Saab 9LV 453 combat management system moves its operating system from Windows to Linux.[13]

Hobart-class DDG

Файл:HMAS Hobart December 2017.jpg
Hobart-class destroyer Шаблон:HMAS

The most significant project recently completed for the RAN are three Hobart-class air warfare destroyers to replace the Adelaide-class frigates. Although the 2009 Defence White Paper and original contract suggested that a fourth ship may be ordered, the 2016 Defence White Paper concluded that only three would be built. Each destroyer will be fitted with the Aegis combat system and will be based on the F100 design by Spanish shipbuilding company Navantia. Each vessel will be fitted with cruise missiles and the SM-6 anti-aircraft missile. Шаблон:HMAS was commissioned on 23 September 2017, with the following vessels to be delivered in 2018 and 2019. The destroyers are being built by ASC Pty Ltd, although the project involves a significant amount of work sub-contracted to other companies and locations.[14] The destroyers are to be named Hobart, Brisbane and Sydney. Future upgrades to this class includes an upgraded Aegis Combat System with an Australian developed tactical interface which will be the same as on the Hunter-class FFG.[15] Future potential upgrades include the integration of the SM-6 and the acquisition of the Naval Strike Missile as a replacement of the RGM-84 Harpoon anti-ship missile. The government will invest up to $5.1 billion in upgrades to the Hobart-class destroyer combat management system upgrades at Osborne from 2024.[16]

Hunter-class FFG

With the Anzac-class frigates due to begin retiring in the late 2020s, work on a replacement program has begun. The program is expected to cost AU$35 billion and a request for tender for the vessel design was released in March 2017 to three contenders: Navantia, Fincantieri, and BAE Systems as part of a competitive evaluation process. In June 2018, Prime Minister Malcolm Turnbull announced that a variation of the BAE design had been selected as the preferred tender for the Шаблон:Sclasss.[17] Construction will begin in Adelaide, South Australia in 2020.[18] Australian shipbuilding company ASC Shipbuilding will become a subsidiary of BAE Systems Australia for the duration of the build.[19] It was announced in February 2024 that only six Hunter Class Vessels would be built and would serve alongside three Upgraded Hobart Class vessels forming the Navy's 'Tier 1' vessels.[20]

Tier 2 Force

With the announced changes to the future Navy's Force Structure discussions around what would form the components of the class, or classes, comprising the 'Tier 2' force.[20][21] While the announced changes included increasing the surface fleet from 11 to 26 vessels the majority of the change would come from within this 'Tier 2' force - a combined 17 vessels in this category.[22] The 17 vessels would comprise of six new "optionally crewed" vessels to "significantly enhance" the Navy's long-range strike capabilities along with a fleet of 11 'general purpose frigates' with designs from Japan, South Korea, Germany and Spain reportedly being considered.[22][20][21]

Amphibious warfare

Файл:HMAS Canberra RIMPAC 2016.jpg
HMAS Canberra in 2016

The RAN's amphibious capabilities was greatly increased by a new class of two Canberra-class amphibious vessels. These ships, based on Navantia's Strategic Projection Ship (later commissioned into the Spanish Navy as Шаблон:Ship), displace approximately 27,000 tonnes, can transport 1,000 personnel and 150 vehicles, and can transport these ashore through landing craft carried in a well deck, or helicopters, with up to six operating simultaneously from each ship's flight deck. The new ships, named Шаблон:HMAS and Шаблон:HMAS, their hulls were built at Navantia's shipyard in Spain, then transported to BAE Systems Australia (BAE acquired Tenix Defence after contract awarded) facilities at Williamstown, Victoria for finishing. The two ships replaced the Шаблон:Sclass amphibious vessels. Шаблон:HMAS was to be replaced by a strategic sealift vessel of 10,000 to 15,000 tons displacement, which will provides the capacity to transport equipment, supplies, helicopters, and soldiers into zones of operation, and embark or disembark these without port facilities. .In the 2016 defence white paper it revealed that HMAS Choules would fulfill this role. Following the early decommissioning of both Kanimblas and Tobruk being out of action, multiple ships were purchased and or leased to cover the lack of amphibious capability. The RAN planned also replace the six Balikpapan-class heavy landing craft with six larger vessels. In mid-2011, the RAN acquired the former British Royal Fleet Auxiliary landing ship Шаблон:Ship, which entered service in December 2011 as Шаблон:HMAS.

In November 2023, defence companies Austal and Birdon announced that they would be building landing craft. They would be built at the Henderson Shipyard in WA. [23]

Minor vessels

Файл:HMAS Armidale Darling Harbour.jpg
The Armidale-class patrol boat Шаблон:HMAS

Between 1999 and 2003, the RAN acquired six Шаблон:Sclasss.[24] Based on Intermarine's Шаблон:Sclasss, each ship is equipped with a variable depth sonar, and a pair of Bofors Double Eagle underwater clearance vehicles.[24]

The RAN's main patrol force is the Шаблон:Sclass. The first of these, Шаблон:HMAS, was commissioned in June 2005, and was the first of fourteen. Шаблон:HMAS, the last ship of the class was commissioned in 2008. Two ships have been decommissioned. Шаблон:HMAS in 2014 as a result of extensive damage caused by a fire and Шаблон:HMAS in 2021.[25]

The 2009 Defence White Paper announced that a new class of 20 offshore combatant vessels would replace the Armidale and Huon classes, along with the Шаблон:Sclass and Шаблон:Sclass-class survey ships.[26] The multi-role ships are predicted to displace anywhere up to 2,000 tonnes, and may be equipped with a helicopter or unmanned aerial vehicle.[26] However the 2016 Defense White Paper decreased the amount of planned vessels to twelve and stated that they would only replace the Armidales while the other classes would see life-extension work. Lurssen's OPV 80 design was chosen. The class was named Шаблон:Sclass (OPV). The first ship will be named Шаблон:HMAS. It was determined that this class would be reduced, both in terms of vessel count down from 12 to 6, but also in role with their focus shifting to civil maritime security operations.[27][28]

During the 2019 election campaign, Scott Morrison announced that one hydrographic survey ship and two minehunters would be constructed from the mid 2020s in the Henderson Shipyard Precinct Under SEA 1905 and SEA 2400. SEA 2400 Hyrdographic Data Collection Capability Program which includes the introduction of a Strategic Military Survey Capability (SMSB) to replace the Leeuwin-class survey vessels. While SEA 1905 is the acquisition of a further two Arafura-class offshore patrol vessels in a mine counter-measures configuration.[29][30] This was expanded in the 2020 Defence Strategic Update and 2020 Force Structure Plan released on 30 June 2020 for up to 8 vessels optimised for mine countermeasures and hydrographic survey roles potentially based on the Arafura design.

The Government announced that six evolved Шаблон:Sclass2s from Austal to be built in Henderson, Western Australia will be acquired for A$350 million on 1 May 2020 to boost patrol capability.[31]

Submarines

Шаблон:See also

Файл:HMAS Sheean, Fremantle.jpg
Collins-class submarine Шаблон:HMAS

The Шаблон:Sclasss, the first of which entered service in 1996, are due to receive a major upgrade to their combat systems, with technology based on the US Navy's Шаблон:Sclass. This new system will be introduced in conjunction with the new heavyweight torpedo.

In the longer term, the Collins-class submarines will begin to reach the end of their useful life in 2026.[32] To meet an in-service date of 2026, advanced design work on the next generation of Australian submarines will begin by 2014–2015. The submarines are likely to be Australian-built, conventional submarines equipped with air independent propulsion and advanced combat and communications systems.[33] Defence Minister Joel Fitzgibbon ordered planning to begin on the next generation of submarines to replace the Royal Australian Navy's Collins-class fleet. The 17-year project will be the largest, longest and most expensive defence acquisition since Australia's Federation, potentially costing up to $25 billion. The submarines are expected to be capable of carrying long-range cruise missiles and midget-subs.[34]

According to the 2009 Defence White Paper, the submarine fleet is to be expanded to 12. The submarines will be equipped with cruise missiles and the world's most advanced torpedoes, sonars, combat systems, intelligence gathering systems as well as also being able to support special forces operations. The first submarine is expected to be in service by 2030. The 2009 White Paper predicted the cost of the new submarines at $35 billion.

Collins class

To avoid a capability gap prior to the anticipated entry into service of the first of 12 Attack-class submarines, Defence Minister Peter Dutton has confirmed that all 6 of the Collins-class submarines will undergo major life-of-type extensions (LOTEs). Approximately $6 billion would be invested in the program. It is expected to involve rebuilding each submarine once it achieves 30 years of service, with each upgrade scheduled to take approximately two years.[35]

SSN-AUKUS

On 15 September 2021, Australian, US, and UK leaders announced the AUKUS agreement which included the construction of nuclear powered submarines for the RAN replacing the previous plan to acquire 12 French designed diesel-electric powered Шаблон:Sclass[36] A specific plan for the acquisition of nuclear-powered submarines was outline in March 2023 and will proceed in three phases.

In the first phase RAN personnel will be trained by the US and UK, while Australia develops submarine shipyard infrastructure and maintenance facilities. Starting in 2027 the US and UK will deploy Virginia-class and Astute-class submarines to Australia as part of "Submarine Rotational Force West". The second phase, starting from 2032, will then see the RAN acquire three Virginia-class submarines, with the option to acquire two more. The final phase will involve Australia and the United Kingdom jointly developing the SSN-AUKUS. Australia will build five SSN-AUKUS boats by 2055 and eight by the mid 2060s.[37] [38]

Afloat Support

The RAN currently has two ships used for afloat support/replenishment at sea: Шаблон:HMAS and Шаблон:HMAS. Supply, replaced the former support ship Шаблон:HMAS in April 2021, while Stalwart replaced the fleet oiler Шаблон:HMAS in November 2021. Supply and Stalwart are based on the Navantia built Spanish Navy's replenishment vessel Шаблон:Ship.[39]

The 2020 Defense Strategic Update And 2020 Force Structure Plan announced the planned procurement of two new additional multi-role sealift and replenishment ships, a replacement of the ADV Ocean Protector, a large salvage and repair vessel, a replacement for STS Young Endeavour youth training ship and a new vessel to support the Pacific Step-Up.[40] The two announced multi-role sealift and support ships - Project Sea2200 - would be domestically built and replace HMAS Choules and enhance the logistical support of the RAN. [41] As of May 2022 BMT Group was the sole company having submitted a proposal based on their ELLIDA design, adapted from the Royal Fleet Auxiliary designated as Tide Class, however the Damen Group reportedly had also shown interest in submitting a design based on their joint support ship class.[42]

Fleet Air Arm

Файл:MRH-90 August 2011.JPG
One of the RAN's MRH-90s in 2011

The Fleet Air Arm is currently an all rotary winged organisation. The RAN operates 6 MRH-90 helicopters shared with the Australian Army,[43] and 23 MH-60R "Romeo" Seahawk helicopters.

The US government has approved a possible sale of up to 12 additional MH-60R helicopters to the RAN. This is part of the RAN plan to expand and rationalise its support and logistics helicopter fleet by replacing the 6 MRH-90s and operating only one type of helicopter to ease maintenance and training.[44][45] In May 2022, the Morrison government announced that it would purchase 12 MH-60Rs to replace the MRH-90 fleet and a 13th to replace a MH-60R that was ditched in the Philippine Sea in October 2021.[46][47] In September 2022, the Albanese government placed an order for 12+1 MH-60Rs.[48]

List of major projects

(Updated to reflect changes made in the Defence Capability Plan – June 2011 Supplement)

  • JP 2048 – Amphibious Deployment and Sustainment program
    • Phase 5: Шаблон:Sclass replacement – 6 new LCH design
      • RFI assessment completed. RFP to be issued early 2012.[49]
      • As of 2019 no further developments.
  • Sea 1000 – Design and Procurement of Future Submarine
    • Phase 1 & 2: Phase 1 (Design) and Phase 2 (Acquisition) has been combined. Decision not due until 2017–2020 or so.
  • Sea 1180Arafura-class offshore patrol vessel.
  • Sea 1360 – Maritime Extended Range Air Defence (Standard SM-6 for Шаблон:Sclass)
    • Phase 1: Project definition stage. Budget for capability reduced from $1–$2b to $500m-$1b.
  • Sea 1439 – Installation of new combat system for Шаблон:Sclasss
    • Phase 4A: Replacement Combat System.
      • Currently underway, IOC has been achieved and FOC expected by 2013.
      • Replacement system is the same AN/BYG-1v8 system fitted to the Шаблон:Sclass SSN.
    • Phase 4B: Weapon & Sensor Enhancements.
      • Currently underway.
    • Phase 6: Sonar Replacement.
      • Given first-pass approval.
  • Sea 1448Anzac-class frigate capability upgrades
    • Phase 2B: Anzac-class Anti-Ship Missile Defence upgrade
      • Шаблон:HMAS successfully completed trials of ASMD upgrade in July 2011.
      • The upgrade of the other seven Шаблон:Sclass frigates has been given government approval.[50] The upgrade is due to begin early 2012 and be complete by 2017.
    • Phase 4A: ES system improvement given first-pass approval.
    • Phase 4B: AN/SPS-49 (Air Search Radar) replacement budget increased from $100–$300m to $300–$500m.
  • Sea 1654 – Maritime Operational Support Capability
  • Sea 5000Future Frigate Program – (Шаблон:Sclass replacement)
  • SEA 1905 is the acquisition of a further two Arafura-class offshore patrol vessels in a mine counter-measures configuration.[29]
  • SEA 2400 is the Hydrographic Data Collection Capability Program which includes the introduction of a Strategic Military Survey Capability (SMSB) to replace the Leeuwin-class survey vessels.[29]
  • SEA 2200 - Future joint support ship
    • Initial designs sought for two joint support ships to replace HMAS Choules and be construct domestically.[42]


A full listing of all current projects is available at the Capability Acquisition and Sustainment Group (CASG) website.

Recently completed projects

See also

Notes

Шаблон:Reflist

Шаблон:Portal bar Шаблон:Royal Australian Navy

  1. Шаблон:Cite news
  2. Шаблон:Cite web
  3. 3,0 3,1 3,2 3,3 Шаблон:Cite web
  4. https://www.gippslandtimes.com.au/story/6902917/hmas-gippsland-expected-to-be-launched-in-2024/ Шаблон:Dead link
  5. 5,0 5,1 5,2 5,3 Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. Шаблон:Cite web
  10. Шаблон:Cite web
  11. Шаблон:Cite web
  12. Шаблон:Cite web
  13. Шаблон:Cite web
  14. Navy unveils $11b warship contract ABC News 20 June 2007
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite web
  18. Шаблон:Cite web
  19. Шаблон:Cite web
  20. 20,0 20,1 20,2 Шаблон:Cite news
  21. 21,0 21,1 Шаблон:Cite web
  22. 22,0 22,1 Шаблон:Cite web
  23. Шаблон:Cite web
  24. 24,0 24,1 Шаблон:Cite book
  25. Шаблон:Cite web
  26. 26,0 26,1 Шаблон:Cite book
  27. Шаблон:Cite news
  28. Шаблон:Cite web
  29. 29,0 29,1 29,2 Шаблон:Cite web
  30. Шаблон:Cite web
  31. Шаблон:Cite web
  32. Шаблон:Cite web
  33. Patrick Walters (2006). Cutting Edge: The Collins experance. Australian Security Policy Institute, Canberra. Pages 10–11.
  34. Шаблон:Cite news
  35. Шаблон:Cite web
  36. Шаблон:Cite web
  37. Шаблон:Cite web
  38. Шаблон:Cite web
  39. Шаблон:Cite news
  40. Шаблон:Cite web
  41. Шаблон:Cite web
  42. 42,0 42,1 Шаблон:Cite web
  43. Шаблон:Cite web
  44. Шаблон:Cite news
  45. Шаблон:Cite book
  46. Шаблон:Cite press release
  47. Шаблон:Cite press release
  48. Шаблон:Cite press release
  49. Шаблон:Cite web
  50. Шаблон:Cite web
  51. Here comes the Hunter: BAE awarded $35bn SEA 5000 Future Frigate Contract Defence Connect 28 June 2018