Английская Википедия:G Line (Los Angeles Metro)

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use mdy dates Шаблон:Use American English Шаблон:Distinguish Шаблон:Infobox rail line

The G Line (formerly the Orange Line) is a bus rapid transit line in Los Angeles, California, operated by the Los Angeles County Metropolitan Transportation Authority (Metro). It operates between Шаблон:Stn and Шаблон:Stn stations in the San Fernando Valley. The Шаблон:Convert[1] G Line uses a dedicated, exclusive right-of-way for the entirety of its route with 17 stations located at approximately Шаблон:Convert intervals; fares are paid via TAP cards at vending machines on station platforms before boarding to improve performance. It is one of the two lines in the Los Angeles Metro Busway system.

The line, which opened on October 29, 2005, follows part of the Southern Pacific Transportation Company's former Burbank Branch Line, which provided passenger rail service from 1904 to 1920; it was subsequently used by Pacific Electric streetcars from 1911 to 1952. At North Hollywood station, the G Line connects with the B Line subway, which offers service to Downtown Los Angeles via Hollywood. The G Line Bikeway runs alongside part of the route.

In 2020, the line was renamed from Orange Line to the G Line while retaining the color orange in its square icon as part of a complete renaming of lines by Metro.[2][3][4][5]

Service description

Because of its many differences from standard bus service, Metro has branded the G Line as part of the region's network of light and heavy rail lines, and it appears on the same system map as the rail lines. The buses are painted in the silver-and-gray color scheme of Metro Rail vehicles. The G Line is rarely referred to by its line number (901), but it sometimes appears on documents and destination signage.

The G Line's icon color, and former Orange Line name, were inspired by the many citrus trees that once blanketed the San Fernando Valley. In the planning stages, the G Line was known as the San Fernando Valley East-West Transitway and later the Metro Rapidway.

Operation

G Line buses operate 24 hours a day.[6] At peak hours (between 6 am and 7 pm eastbound, 5 am and 6 pm westbound), every other bus is a short turn, only operating between North Hollywood and Canoga station.

Station list

The following is the complete list of stations, from west to east.

Stations Date Opened Neighborhood Major connections and notes[7][8]
Шаблон:LAMs June 30, 2012 Chatsworth Шаблон:Rint Pacific Surfliner
Шаблон:Rint Шаблон:Rcb
Park and ride: 609 spaces
Nordhoff
Roscoe Canoga Park
Sherman Way Park and ride: 207 spaces
Шаблон:LAMs December 27, 2006[9] Park and ride: 246 spaces
Шаблон:LAMs October 29, 2005 Winnetka
Шаблон:LAMs Park and ride: 392 spaces
Шаблон:LAMs Tarzana
Шаблон:LAMs Park and ride: 442 spaces
Шаблон:LAMs Lake Balboa Park and ride: 273 spaces
Шаблон:LAMs Van Nuys
Шаблон:LAMs Park and ride: 260 spaces
Шаблон:LACMTA link logo Future connection to Sepulveda Transit Corridor
Шаблон:LAMs Park and ride: 307 spaces
Шаблон:LACMTA link logo Future connection to East San Fernando Valley Light Rail Transit Project (2030)
Woodman Valley Glen
Шаблон:LAMs
Шаблон:LAMs Valley Village
Шаблон:LAMs North Hollywood Шаблон:LACMTA icon
Park and ride: 1,085 spaces

Ridership

Шаблон:Div flex row

Annual ridership
Year Ridership Шаблон:Abbr
2009 6 825 390
2010 7 087 074 Шаблон:Change
2011 7 522 082 Шаблон:Change
2012 8 528 167 Шаблон:Change
2013 9 164 407 Шаблон:Change
2014 8 742 210 Шаблон:Change
2015 8 422 122 Шаблон:Change
2016 7 754 858 Шаблон:Change
2017 7 373 450 Шаблон:Change
2018 7 008 626 Шаблон:Change
2019 6 714 108 Шаблон:Change
2020 3 523 695 Шаблон:Change
2021 3 358 303 Шаблон:Change
2022 4 162 794 Шаблон:Change
2023 4 406 310 Шаблон:Change
Source: Metro[10]

Шаблон:Graph:Chart Шаблон:Div flex row end

History

Шаблон:Main

The majority of the G Line is built on part of the former Southern Pacific Railroad Burbank branch, part of which saw Pacific Electric Red Car service (see San Fernando Line and Owensmouth Line);[11] passenger service on this segment ended in 1952,Шаблон:Citation needed but the right-of-way remained undeveloped and was acquired by Metro in 1991.[11] As the Metro Rail system was being designed in the 1990s, initial plans were to build an extension of the Metro Red Line there, since the purchased right-of-way's eastern terminus was at the site of the planned North Hollywood station. However, political developments stymied these plans: community objections to surface transit along the route resulted in a 1991 law mandating that any line along the route be built as a deep-bore tunnel,[12][13] but a 1998 ballot measure driven by perceptions of mismanagement banned the use of county sales tax to fund subway tunneling.[14][15][16] Prevented from using the route for rail, Metro proceeded to create its first bus rapid transit line along the corridor, and despite further lawsuits from area residents,[17] the line opened on October 29, 2005, at a final cost of Шаблон:US$ or Шаблон:US$ per mile (US$Шаблон:Format price and US$Шаблон:Format price in Шаблон:Inflation year adjusted for inflation).[18]

Then-County Supervisor Zev Yaroslavsky said they initially mirrored the busway concept based on a similar transit system he, then-Mayor Richard Riordan, and other elected officials toured in Curitiba, Brazil.[19]

On June 23, 2009 construction began on a Шаблон:Convert extension from Canoga northward along the Southern Pacific trackbed[20] to the Metrolink station in Chatsworth. Metro's board approved the plan on September 28, 2006, and it was completed in 2012 at a cost of Шаблон:US$ (US$Шаблон:Format price in Шаблон:Inflation year adjusted for inflation).[21][22][23] This created two branches at the western end of the line beyond Canoga station; the older branch proceeded outside the busway on city streets to Warner Center. In 2018, this branch was eliminated and replaced with a frequent service local shuttle, leaving the entirety of the Orange Line on the dedicated right-of-way.[24]

Proposed developments

Grade separation and crossing gates

Файл:Burank-Fulton intersection.jpg
Orange Line bus crossing a level crossing at Burbank Boulevard and Fulton Avenue

In the first year that the busway was open, there were ten injury collisions between vehicles and buses, which were heavily covered in the media. Metro noted that the buses had about the same accident rate as other bus lines in the city on a per-mile basis,[25][26] and has stated that the line's accident rate is "less than half" of Metro's entire fleet of buses.[27] They also pointed out that the A Line also had a significant number of collisions in its early years.[28] Under pressure, Metro ordered buses to slow from Шаблон:Cvt to Шаблон:Cvt at intersections.[29][30] Starting in December 2005, red light cameras were installed at most intersections.[31]

Файл:G Line pedestrian crossing with railroad signals.jpg
Prototype grade crossing with red lights and "Busway Crossing" crossbucks, the very first in the United States

As part of the enhancement package to the LA Metro system approved by voters in 2016 with Measure M, in October 2017, Metro recommended a series of improvements to the Orange Line. These include quad-crossing gates at 34 intersections and constructing a mile-long elevated section between Sepulveda and Van Nuys Boulevard. These improvements would eliminate much of the time Orange Line buses spend waiting at red lights, would allow buses to cross intersections at higher speeds, and cut end-to-end travel time along the entire route by 29%. Projected construction costs are Шаблон:US$.

Metro advertised a design–build project in February 2022 to convert 41 existing signalized intersections on the G Line from transit signal priority to preemption using railroad-grade-crossing-style gates and flashing light signals (similar to the prototype proof of concept at the Hayvenhurst Avenue pedestrian crossing). The project also calls for building an aerial busway and two aerial stations to grade separate three other intersections (Sepulveda, Vesper, and Van Nuys). The plans require all work to be compatible with the future conversion of the busway to the light rail.[32] Pre-construction has startedШаблон:When with the LADWP burying the aerial power lines at the busway intersection with Sepulveda in Van Nuys. As of October 2022, Metro expects construction to begin in 2023, and the project will be completed in 2026.[33]

Capacity enhancements

There is concern that the G Line will soon reach its engineered capacity and has exceeded its designed capacity during peak periods.[34] Adding more buses requires platooning (running convoys of two or more buses together), similar to what rail achieves in having multiple cars per train. And while the proposed change in the previous project from priority to preemption at signalized intersections will decrease delays to G Line buses, it will come at the cost of increasing cross-street travel times and reducing their capacity since priority balances the timing needs of busway traffic with cross-traffic versus the more disruptive railroad-style preemption.[32] Another alternative involves using longer vehicles to increase each bus's capacity. In 2015, California passed a bill allowing buses up to 82 feet long to operate on the G Line busway (longer than the existing 65-foot-long articulated buses.)[35]

Conversion to light rail

In April 2015, a report prepared for Metro estimated that conversion of the G Line to light rail would take two to three years and cost between Шаблон:US$. This price would include both upgraded infrastructure and the purchase of rail vehicles. The report noted that if not upgraded in some way shortly, the G Line would soon reach capacity at rush hours.[36] Full conversion to light rail is planned to take place by 2050.[37] Different braking distances of LRT vs. BRT might be an essential concern of safety tests.

Incidents

On October 27, 2005, two days before the line's official opening, a motorist driving with a suspended license ran a red light and collided with an eastbound bus at Vesper Avenue. There were no injuries.[38]

In November 2005, there were two collision-caused injuries. In the first, a fare inspector on the bus was taken to a hospital for minor injuries after a 65-year-old female driver made an illegal right turn against a red light and struck an Orange Line bus near the crossing at Corbin Avenue in Reseda.[39] In the second, one person was seriously injured and 14 others hospitalized after an elderly motorist ran a red light while using a mobile phone.[40] After the second collision, Metro instructed all buses to slow down at intersections[29] and installed white strobe lights on the sides of the buses to improve visibility. They said they would review any and all ideas to improve safety on the line.[30]

In October 2006, a delivery truck hit the side of a bus. One person was seriously injured, and 16 received minor injuries.[41]

Fleet

Файл:G Line bus charging at North Hollywood station.jpg
G Line bus using on-route charger at North Hollywood station

The G Line has a dedicated fleet of Шаблон:Convert articulated buses that each have 57 seats—about 50% more than Шаблон:Convert non-articulated buses—and have three doors (versus two on non-articulated buses). The G Line uses a proof-of-payment system whereby fares are paid before boarding, so the buses do not have any onboard fare collection equipment. The G Line fleet is stored and maintained at Metro's Division 8 depot in Chatsworth, which has direct access to the busway.

Prior to 2021, the former G Line fleet used NABI 60-BRT buses which ran on compressed natural gas (CNG). In 2021, all NABI 60-BRT buses were replaced with 40 New Flyer Xcelsior XE60 battery electric articulated buses.[42] Additional features of the battery electric buses include dual air conditioning units, two additional hub-mounted motors on the middle axle, an active suspension system, USB charging ports at each seat, and public Wi-Fi. They also lack the large cooling fans of the CNG buses, which makes them quieter.[42]

Each battery-electric bus has a battery capacity of Шаблон:Nowrap,[43] which provides a range of about Шаблон:Convert. There are ten Шаблон:Nowrap slow chargers at the bus depot, as well as Шаблон:Nowrap on-route rapid chargers at the Canoga, Chatsworth, and North Hollywood stations. The on-route chargers, which are manufactured by Siemens to the SAE J3105-1 standard, add about Шаблон:Convert of range from a seven to ten-minute charge.[43] Both types of chargers have overhead pantographs that connect to roof-mounted contacts on the buses. The depot chargers use a one-to-many scheme, whereby 150 kW from a single charger is distributed to multiple overhead pantographs.[43][44] The electrification project cost Шаблон:US$, including the buses (Шаблон:US$ each), charging equipment, and infrastructure improvements.[42]

Bike path

Шаблон:Main

Файл:Orange Line Bikeway 2022-08d.jpg
Bike path near Sepulveda station

The G Line Bikeway is an active transportation bicycle path that shares the right-of-way with the G Line busway.

See also

Шаблон:Stack

References

Шаблон:Reflist

External links

Шаблон:Commons category Шаблон:Attached KML

Шаблон:Los Angeles Metro Rail and Busway stations navbox Шаблон:Los Angeles County Metropolitan Transportation Authority Шаблон:USBRT

  1. Ошибка цитирования Неверный тег <ref>; для сносок FactsGlance не указан текст
  2. Шаблон:Cite news
  3. Шаблон:Cite news
  4. Шаблон:Cite news
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. Шаблон:Cite press release
  10. Шаблон:Cite web
  11. 11,0 11,1 Шаблон:Cite news
  12. Шаблон:Cite news
  13. Шаблон:Cite news
  14. Шаблон:Cite web
  15. Шаблон:Cite web
  16. Шаблон:Cite web
  17. Шаблон:Cite news
  18. Шаблон:Cite news
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. Guccione, Jean. "MTA to Run Orange Line Busway to Chatsworth" Шаблон:Webarchive. Los Angeles Times. September 29, 2006. B1.
  22. extension diagram
  23. "Canoga Park-Chatsworth busway construction kickoff Wednesday" Шаблон:Webarchive, Sue Doyle, Daily News, Retrieved June 23, 2008
  24. Шаблон:Cite web
  25. Шаблон:Cite web
  26. Liu, Caitlin. "Six Hurt in Latest Orange Line Crash" Шаблон:Webarchive. Los Angeles Times. December 8, 2005.
  27. LA Times – Orange Line bus crash hurts 17
  28. Шаблон:Cite news
  29. 29,0 29,1 Liu, Caitlin and Amanda Covarrubias. "Orange Line Model Beset by Crashes" Шаблон:Webarchive. Los Angeles Times. November 4, 2005.
  30. 30,0 30,1 Liu, Caitlin. "Orange Line Buses May Get Strobe Light Signals" Шаблон:Webarchive. Los Angeles Times. November 18, 2005.
  31. Liu, Caitlin. "After Crashes, Red-Light Cameras to Be Installed at 12 Orange Line Crossings" Шаблон:Webarchive Los Angeles Times. December 15, 2005. B1.
  32. 32,0 32,1 Шаблон:Cite web
  33. Шаблон:Cite web
  34. Шаблон:Cite web
  35. Шаблон:Cite news
  36. Шаблон:Cite news
  37. Шаблон:Cite news
  38. Liu, Caitlin. "Car Hits Bus on Transitway Test Run, Raising Concerns for Safety" Шаблон:Webarchive, Los Angeles Times, October 28, 2005.
  39. Шаблон:Cite news
  40. Шаблон:Cite web
  41. Шаблон:Cite news
  42. 42,0 42,1 42,2 Шаблон:Cite web
  43. 43,0 43,1 43,2 Шаблон:Cite report
  44. Шаблон:Cite web