Английская Википедия:Gawler line

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use Australian English Шаблон:Infobox rail line

The Gawler line, also known as the Gawler Central line, is a suburban commuter railway line in the city of Adelaide, South Australia. The Gawler Line is the most frequent and heavily patronised line in the Adelaide rail network.

History

Файл:GawlerCentralRailwayStationAdelaide.jpg
Gawler Central station, one of two terminus stations in the town of Gawler
Файл:ElizabethStationAdelaide.jpg
Elizabeth Interchange in 2023
Файл:Salisbury interchange train.jpg
Salisbury Interchange in 2012
Файл:Mawson lakes railway station.jpg
Mawson Lakes Interchange in 2021
Файл:Bridge over little para.jpg
Rail Bridge over the Little Para River in Salisbury, built prior to 1889 and still in use[1]

The line was opened in 1857 from Adelaide to Gawler.[2][3] It was extended to Kapunda in 1860. Branches were later built from Gawler to termini in Angaston, Truro, Morgan, Robertstown, Peterborough, Spalding and Gladstone. Between Adelaide and Salisbury, the two broad gauge lines are paralleled by one standard gauge line on the Adelaide to Port Augusta line. A little north of Salisbury the standard gauge line heads north-west. From Salisbury to Gawler there are two broad gauge tracks, with a single broad gauge track north of Gawler.

South of Gawler, there were branches to the Holden factory at Elizabeth South, the Penfield railway line which serviced the former munitions factory and other Defence facilities in the area now called Edinburgh. The Port Pirie line which branched from the Gawler line at Salisbury railway station until it was converted to standard gauge, with a new track laid alongside the broad gauge tracks. Prior to 1987, at Dry Creek, the Dry Creek-Port Adelaide railway line branched west, and the Northfield railway line used to branch east. In the mid 2000s, a new station was built at Mawson Lakes.

Renewal and electrification

In 2008, the State Government announced a plan to rebuild the Gawler line, in preparation for the line to be electrified with the Federal Government also to provide funding.[4] The track was removed, and the track bed, sleepers and track renewed. Dual gauge sleepers were laid to allow for the line to be converted to standard gauge at a future date. The line was closed between North Adelaide and Mawson Lakes for four months from June 2010 for this work to be performed, and between Mawson Lakes and Gawler Central stations for seven months from September 2011.[5][6][7] Following the withdrawal of Federal Government funding by the then newly elected Abbott Liberal-National government, the electrification was postponed in October 2013.[8]

In February 2011, a new Adelaide Metro railcar depot opened to the east of Dry Creek station, to replace the facility behind the new Royal Adelaide Hospital site and Adelaide station.[9] The depot is the major maintenance and re-fuelling facility for the diesel train fleet, with capacity to store 70 railcars with over 11 kilometres of track. The depot has been designed to allow future conversion to support electric rolling stock.

To facilitate work on the Torrens Rail Junction in 2017, the Gawler line between Adelaide and Mawson Lakes was closed from 1–15 October and 18 November to 5 December.[10]

Following a decade of on-again, off-again talks,[11] electrification of the Gawler line was announced in 2018. The announcement only promised Stage 1 electrification as far as Salisbury with works anticipated to commence in 2018.[12] A $220 million grant from the Federal Government allowed for Stage 2 electrification for the remainder of the line to proceed.[13] Works began in November 2019 with completion anticipated in 2021.[14] Contrary to the Seaford line electrification, which saw the line closed completely for 11 months, from October 2020 onward, main construction on the Gawler line was spread out across a rolling schedule of partial and full line closures across 12 months. Early works before October 2020 were spread across smaller closures, typically at nights and on weekends.

The entire line was closed in December 2020. It was intended to reopen in November 2021 but was delayed due to restrictions regarding the COVID-19 lockdown in July.[15][16] The line was expected to reopen around 30 April 2022, but following the state election in March, the reopening was pushed back to the end of June.[17]

The line was reopened on 12 June 2022.[18] A majority of services on the line are now operated by 4000 class trains, however, 3000/3100 class trains continue to operate select services while the delivery of new 4000 class train sets continues.

Torrens Road Overpass

In 2021, the Australian and South Australian governments announced that the Torrens Road level crossing would be removed, at a cost of $196 million.[19] The Torrens Road level crossing was previously identified as one of the most high risk crossings in Adelaide, in part due to it being both a passenger rail, and freight rail crossing.[20] Earlier, in 2020, an investigation was launched after a freight train passed through the level crossing without activating the crossing boomgates.[21]

In 2023, the Torrens Road overpass was officially opened. As part of the project, a new public park was constructed underneath the overpass, and the adjacent Ovingham railway station was rebuilt. [22][23]

Route

The line runs from Adelaide station north via Prospect, Mawson Lakes, Salisbury, Elizabeth and Smithfield to the town Gawler on the outer northern metropolitan fringe. The line is Шаблон:Convert in length and is the longest of the Adelaide suburban railway lines.

Like the rest of the Adelaide suburban passenger rail network, the line is Шаблон:RailGauge broad gauge for its entire length. The Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line runs parallel to the route from the Adelaide Gaol triangle to Salisbury, then turns north west towards Virginia.

Line guide

colspan=7 style=background:#Шаблон:Rcr|Gawler Line
Name Distance from
Adelaide
Year opened Serving suburbs Connections
Шаблон:Rwsa 0.0 km 1856 Adelaide Шаблон:Rail color box Шаблон:Rail color box Шаблон:Rail color box
Шаблон:Rail color box Шаблон:Rail color box

Шаблон:Ric Bus Шаблон:Ric Tram

Шаблон:Rwsa 2.5 km 1857 North Adelaide
Шаблон:Rwsa 3.6 km 1880s Ovingham, Renown Park
Шаблон:Rwsa 4.9 km 1915 Dudley Park, Prospect
Шаблон:Rwsa 6.0 km Шаблон:Unknown Dudley Park, Prospect
Шаблон:Rwsa 7.7 km 1915 Kilburn
Шаблон:Rwsa 10.6 km 1856 Dry Creek
Шаблон:Rwsa 14.3 km 2006 Mawson Lakes Шаблон:Ric Bus
Шаблон:Rwsa 15.1 km 1969 Parafield Gardens
Шаблон:Rwsa 16.6 km 1968 Parafield Gardens
Шаблон:Rwsa 17.7 km 1928 Parafield, Parafield Gardens
Шаблон:Rwsa 18.6 km Шаблон:Unknown Salisbury Downs, Salisbury South
Шаблон:Rwsa 20.2 km 1857 Salisbury Шаблон:Ric Bus
Шаблон:Rwsa 21.5 km 1950 Elizabeth South, Salisbury
Шаблон:Rwsa 24.0 km 1955 Elizabeth South
Шаблон:Rwsa 25.8 km 1960 Elizabeth Шаблон:Ric Bus
Шаблон:Rwsa 27.3 km 1950 Edinburgh North, Elizabeth North
Шаблон:Rwsa 28.2 km 1950s Davoren Park, Elizabeth North
Шаблон:Rwsa 30.2 km 1857 Smithfield Шаблон:Ric Bus
Шаблон:Rwsa 32.2 km 1978 Munno Para Шаблон:Ric Bus
Шаблон:Rwsa 34.1 km 1959 Kudla
Шаблон:Rwsa 37.4 km 1947 Evanston Gardens
Шаблон:Rwsa 38.3 km Шаблон:Unknown Evanston
Шаблон:Rwsa 39.3 km 1913 Evanston
Шаблон:Rwsa 39.8 km 1857 Gawler South, Gawler West Шаблон:Ric Bus Шаблон:Ric Regional Coach
Шаблон:Rwsa 41.4 km Шаблон:Unknown Gawler
Шаблон:Rwsa 42.2 km 1911 Gawler

Services

Commuter

All suburban rail passenger services are operated by Adelaide Metro. In April 2008, new timetables were introduced on the Gawler line in an effort to boost efficiency. Shorter secondary services that terminated at Dry Creek and Salisbury were withdrawn, new limited express services were introduced, and a new Hi-Frequency station policy adopted.[24] Nearly all services either start or terminate their journey at Gawler or Gawler Central stations, apart from a morning peak express service that begins its journey at Salisbury.[24]

Under this policy, the Hi-Frequency stations (Islington, Mawson Lakes, Parafield, Salisbury, Elizabeth, Smithfield, Tambelin and Gawler) have services every 15 minutes from Monday to Friday. All other stations have a 30-minute service. This is in addition to several peak hour express services that stop only at selected Hi-Frequency stations.[24]

On weekends and public holidays, services operate with a 30-minute frequency at all stations, with the exception of North Adelaide.[24]

Until April 2008, most services along the line were operated by 3000 class railcars. With the introduction of the new timetable, 2000 class railcars became more frequent, especially during peak hour. The 2000 class railcars were retired in August 2015.[25]

Freight

Freight is a major factor along this transport corridor, with the Australian Rail Track Corporation's standard gauge Adelaide to Port Augusta line running parallel to the broad gauge track between Adelaide and Salisbury. Since 1984, this line has been standard gauge and had no interface with the suburban lines. Bowmans Rail, One Rail Australia, Pacific National, SCT Logistics, and Journey Beyond operate services via the line. Journey Beyond operates The Ghan and the Indian Pacific passenger trains along this section. Until 2007, grain trains operated from Roseworthy to Port Adelaide. The last freight service on the Gawler line was the Penrice Stone Train, which operated to Penrice until it ceased operating in June 2014.[26]

References

Шаблон:Reflist

External links

Шаблон:Adelaide Metro railway stations Шаблон:Adelaide public transport