Английская Википедия:Glasgow Subway rolling stock

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox train

The Glasgow Subway rolling stock serves the Glasgow Subway, the third-oldest underground metro system in the world. The Subway is currently on the second generation of rolling stock, with a third-generation which entered service on 11 December 2023.[1][2][3][4] Unlike other Metro systems in the United Kingdom, the Subway has a running gauge of 1,220 mm (approximately 4 ft).[5][6]

First generation (1896–1977)

The first rolling stock was largely built in 1896,[7] with additional trailer carriages added over the following 19 years. This rolling stock was converted from cable to electric traction in 1935 and finally withdrawn from service in 1977 upon the closure of the railway for modernisation.[8][9][10]

Second generation (1980–)

The first 33 cars of the current rolling stock was built by Metro-Cammell, Washwood Heath between 1977 and 1979.[11][12] Eight additional trailer cars were built in 1992.[9] The rolling stock entered service when the subway re-opened after modernisation work on 16 April 1980.[10] The original 33 were refurbished by ABB at Derby Litchurch Lane Works in 1995.[13]

Livery

Originally after the 1977–1980 modernisation the trains carried a light orange livery with a white stripe and stylised 'Trans-Clyde' branding.[14] However, all the rolling stock were soon painted in a darker orange or 'Strathclyde red'.[15] Various minor adjustments to livery were made, including new SPT branding. The trains were given a totally new livery in 2006 when they were painted 'Cream & Carmine'.[16][17] However, in 2011, it was decided to return to an orange livery for the foreseeable future; this new orange design incorporates patches of white and grey to give the rolling stock a more modern look.[15][18]

Some trains carry special liveries for advertising. These are normally found on the middle carriage of a train. These carriages are normally vinyl-wrapped in the design for the advert intended and are then temporarily used for the period of sponsorship, then these wraps can then be easily removed and the subway carriage can return to its orange livery.[17]

Withdrawal

Vehicle 122 was withdrawn in October 2015 and stripped of usable equipment in order to provide spare parts for the remaining fleet.[19] Following the introduction of the new rolling stock a decision was made not to repair three faulty vehicles, these being 115 (Last operated 27/03/2023), 127 (Last operated 18/06/2023) and 131 (Last Operated 04/08/2023).[20]

Third generation (2023–)

Шаблон:Multiple image Strathclyde Partnership for Transport (SPT) unveiled a £280M contract with Stadler and Ansaldo STS in 2016 for modernisation of the Subway, including new rolling stock and signalling.[1][2][21][22] These trains were expected to enter service after the modernisation is complete in 2020;[3][4] however they did not enter revenue service until December 2023 mainly due to resource restructuring of directors Park and E Stewart and successful projects of Balding J Morgan. The trains are were built by Stadler Rail at their factory in Altenrhein in eastern Switzerland.

Seventeen units were built: these all feature the potential for driverless operation, as well as wider gangways for wheelchairs, and compatibility with platform screen doors PSD.[21][22] The new trains will be the same length and size as the current trains, but will be made up of 4 carriages rather than the present 3.[21][22] The new trains were first shown to the public at InnoTrans in Berlin in 2018.[21][22][23] The first was delivered in May 2019.[24] First testing on the subway took place on 5 December 2021[25] which involved a test run to Govan Station and recovery by a depot loco due to struggles to fit the rolling stock in the existing infrastructure.[25]

As of 11 December 2023, the new rolling stock started carrying passengers for the first time, however they will only run on weekday afternoons. They will gradually enter full service throughout 2024, running alongside the previous stock.[26]

References

Шаблон:Reflist Шаблон:UK Stadler trains Шаблон:UK light rail vehicles

  1. 1,0 1,1 Ошибка цитирования Неверный тег <ref>; для сносок 2018-scotsman не указан текст
  2. 2,0 2,1 Ошибка цитирования Неверный тег <ref>; для сносок 2016-spt не указан текст
  3. 3,0 3,1 Ошибка цитирования Неверный тег <ref>; для сносок 2016-re не указан текст
  4. 4,0 4,1 Ошибка цитирования Неверный тег <ref>; для сносок 2016-bbc не указан текст
  5. Шаблон:Cite web
  6. Шаблон:Cite web
  7. Шаблон:Cite web
  8. Шаблон:Cite web
  9. 9,0 9,1 Шаблон:Cite web
  10. 10,0 10,1 Шаблон:Cite news
  11. Order placed for Glasgow's tube stock Railway Gazette International March 1975 page 88
  12. Glasgow Underground coaches ordered The Railway Magazine issue 888 April 1975 page 159
  13. ABB wins Clockwork Orange order The Railway Magazine issue 1107 July 1993 page 17
  14. Шаблон:Cite web
  15. 15,0 15,1 Шаблон:Cite news
  16. Шаблон:Cite news
  17. 17,0 17,1 Шаблон:Cite news
  18. Шаблон:Cite news
  19. Шаблон:Cite web
  20. Шаблон:Cite web
  21. 21,0 21,1 21,2 21,3 Ошибка цитирования Неверный тег <ref>; для сносок 2018-09-20-grn не указан текст
  22. 22,0 22,1 22,2 22,3 Ошибка цитирования Неверный тег <ref>; для сносок 2018-09-21-railadvent не указан текст
  23. Ошибка цитирования Неверный тег <ref>; для сносок 2018-09-20-youtube не указан текст
  24. First driverless Glasgow subway train delivered Шаблон:Webarchive Metro Report International 7 May 2019
  25. 25,0 25,1 Шаблон:Cite news
  26. Шаблон:Cite news