Geku railway is a railway connecting Golmud and Korla, in western China. Construction started in November 2014 and was completed in 2020. The length of the line is 1,214 kilometres (754 mi), joining Qinghai province and Xinjiang province. The investm

Geku railway (Шаблон:Zh) is a railway connecting Golmud and Korla, in western China. Construction started in November 2014 and was completed in 2020.[1] The length of the line is Шаблон:Convert, joining Qinghai province and Xinjiang province. The investment is estimated to be CN¥36 billion (~US$6 billion). The line connects the Qinghai–Tibet railway and the Southern Xinjiang railway. It's the third railway connecting Xinjiang province with another Chinese province and the third line to Golmud after the Qinghai–Tibet railway and the 2019 Golmud–Dunhuang railway. It is part of the Taklimakan Desert railway loop, together with sections of the Hotan–Ruoqiang railway, Kashgar–Hotan railway, and Southern Xinjiang railway.[2]

Description

The railway crosses the Qaidam Basin, the Altyn-Tagh mountain range, and the Taklamakan Desert. As the third rail artery linking Xinjiang with neighboring provinces, the line cut travel time between the two places from 26 hours to 12 hours.[3]

The railway generally follows the route of Qinghai Provincial Highway 303 (from Golmud to Mangya Lake 茫崖湖), China National Highway 315 (from Mangya Lake to Ruoqiang) and China National Highway 218 (from Ruoqiang to Korla).

A Шаблон:Convert long viaduct crosses over the Karakoshun Lake.[4]

The line is used for passenger travel and cargo such as petroleum products.[4]

Xinjiang railway loop

Combined with the Hotan–Ruoqiang railway along the southern rim of the Tarim Basin[5] (which opened on June 16 2022), the Kashgar–Hotan railway, the Korla–Kashgar section of the Southern Xinjiang railway, and the Ruoqiang–Korla section of the Golmud–Korla railway, railways now form a Шаблон:Convert loop around the Tarim Basin.[6]

History and development

With a design speed of Шаблон:Convert, the Qinghai section of the rail route launched on 30 June 2020 stretching Шаблон:Convert and 15 stations, with one pair of passenger trains and two pairs of freight trains per day at launch.[7] The remaining section opened on 9 December 2020.[8][9]

On 11 October 2021, service frequency between Golmud and Mangyazhen was increased to one train in each direction per day.[10]