Английская Википедия:Goole railway swing bridge

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Coord

Файл:The Railway Bridge over the River Ouse - geograph.org.uk - 1391203.jpg
Goole railway swing bridge, over the River Ouse

The Skelton Viaduct, also known as the Hook bridge or Goole railway swing bridge, is a large viaducted hogback plate girder bridge with swing span over the River Ouse, Yorkshire near Goole, East Riding of Yorkshire, England. The bridge was designed by Thomas Elliot Harrison for the Hull and Doncaster Branch of the North Eastern Railway and opened in 1869.

In the latter part of the 20th century, the bridge became known for the frequent incidents involving ship collisions with the superstructure. As of 2022, it is still in use.

History and description

Файл:Ouse railway swing bridge, nr. Skelton Goole.jpg
Pre-1915 photo of the bridge

During the 1860s, a number of attempts were made by different railway companies to create a new line better connecting Kingston upon Hull and South Yorkshire;Шаблон:Sfn in 1862 the North Eastern Railway promoted a bill for a line which was unopposed by the Manchester, Sheffield & Lincolnshire Railway, and Lancashire & Yorkshire Railway on the understanding of mutual running powers for the companies, either to Hull, or on lines in South Yorkshire.Шаблон:Sfn The bill, the "North Eastern Railway (Hull and Doncaster Branch)" was deposited late 1862, for a line from a junction on the Hull and Selby Line near Staddlethorpe (near Gilberdyke) to a junction with the South Yorkshire Railway near Thorne, Hatfield and Stainforth.[1] The act was passed in mid-1863.Шаблон:Sfn

As part of the construction of the line, a bridge was required over the River Ouse near Goole between Skelton and Hook.Шаблон:Sfn

Construction and design

Файл:Swing Railway Bridge Over the River Ouse Between Hook and Skelton - geograph.org.uk - 72799.jpg
The bridge (2003)

The bridge consisted of four fixed spans, one swing span and a fifth swing span, and carried a double-track railway.Шаблон:Sfn[note 1]

Pier foundations for the bridge spans were of Шаблон:Convert base diameter cast iron cylinders, which tapered to Шаблон:Convert diameter at the high water level, each column was around Шаблон:Convert long.Шаблон:Sfn The piers were sunk into the river alluvium using a mass placed on them, and then by the pneumatic Caisson process until bedrock was reached. The tubes were then filled with Portland cement concrete to within Шаблон:Convert of the top, the final fill was with brickwork with a top course of granite.Шаблон:Sfn The river abutments were of brick with stone dressing.[2]

The fixed spans were Шаблон:Convert long, made of three wrought iron hogback plate girders each, resting on three piers.Шаблон:Sfn The swing span was constructed of three hogback wrought iron box girders, each Шаблон:Convert long, each box girder having a thickness of Шаблон:Convert made of plates Шаблон:Convert thick. In addition to the transverse deck girders the swing span was also braced by three transverse frames, which also served to support a bridgeman's hut over the centre of the bridge.Шаблон:Sfn

The swing span was supported and turned on 26 conical rollers, which were supported by an annular box girder Шаблон:Convert high by wide, itself resting on six of the cast iron piers with approximately Шаблон:Convert of the pier sunk into the river bed.Шаблон:Sfn

The bridge rotated around a central column, which contained a hydraulic accumulator of Шаблон:Convert stroke, with Шаблон:Convert diameter ram loaded to Шаблон:Convert, used to power the turning mechanism. The bridge was turned by a three-cylinder hydraulic motor (duplicated for redundancy), and gears. The accumulator was charged by Шаблон:Convert steam engines, also duplicated.Шаблон:Sfn The engines were supplied by field boilers also located on the central pier.Шаблон:Sfn

When in the closed position a hydraulic mechanism at either end of the bridge was used to lock the bridge in position.Шаблон:Sfn The bridge could be opened in 50 seconds.Шаблон:Sfn

The bridge superstructure was designed was T. E. Harrison of the NER, and erected by Pease, Hutchinson and Company (Skerne Ironworks).[3] The fixed spans were supplied by Butler and Pitts (Stanningley),[4][5] the hydraulic motors were of the design of Sir W. G. Armstrong.[6]

The swing span weighed Шаблон:Convert, the weight of iron in the piers Шаблон:Convert, with Шаблон:Convert of iron in the girders. The swing span opening was over Шаблон:Convert in width, with a height above high water when closed of over Шаблон:Convert, The swing pier included a river jetty Шаблон:Convert long.[7]

The bridge was crossed by NER officials in 1868,[8] and the line opened on 2 August 1869.[6]

Working history

Файл:Underside of rail bridge - geograph.org.uk - 1095164.jpg
Columns and underside of bridge looking towards central pier (2008)

On 21 March 1922, the river pier and engine room of the swing span was badly damaged by fire.[9][10]

In May 1933, the LNER had a miniature thumb switch controlled signalling frame installed at the bridge by Westinghouse,[11] at the same time the line from Staddlethorpe to Goole had colour light signalling installed; both were early examples of either technology in use. At the same time, two signal boxes at either end of the bridge were closed.[12][13][14]

The bridge has had several collisions with water-going ships.[12][15][16][note 2]

On 21 December 1973, the bridge was struck by a German coaster Vineta (Шаблон:IMO Number[16]), causing one of the spans to fall into the river, leaving the bridge unworkable for nine months.[12][18][19]

On 2 August 1976, Danish vessel Leon Sif (Шаблон:IMO Number) hit one of the bridge's piers.[20]

British Rail began closure procedures for the railway line due to costs associated repairing the bridge's pier, estimated at £2 million, coupled with a historic failure to get adequate compensation for damage to the bridge caused by shipping.[21][22]

In 1987, the structure was given a grade II* listing by English Heritage.[2]

On 23 November 1988, one of the fixed spans was pushed out of alignment by a collision with the Swedish vessel Samo (Шаблон:IMO Number), which became trapped between the bridge's piers.[16][23][24][25]

By the early 21st century, understrength girders and corrosion had led to the line speed over the bridge being reduced to Шаблон:Convert for passenger trains, down to only Шаблон:Convert for trains with a route availability of 9 or more. In 2009, a modernisation programme began – Clancy Docwra installed services (telecoms, fresh and waste water, electricity, signalling) to the central pier through piping under the river bed. Carillion was appointed main contractor in March 2010. The bridge steelwork was repaired and upgraded over a six-week line closure starting in October 2010 – over 400 tonnes of steelwork was installed including diagonal transverse braces, and stiffening to the girders of the web. Additional work included track renewal and painting of the bridge. The total cost of the project was £6 million; the firm of Pell Frischmann was the designing engineer.[26]

Шаблон:Quote

See also

Notes

Шаблон:Reflist

References

Шаблон:Reflist

Sources

Literature

External links

Шаблон:Commons category

Bridges over the River Ouse
Upstream: Ouse Bridge Downstream: Humber Bridge

Шаблон:Swing bridges in Yorkshire


Ошибка цитирования Для существующих тегов <ref> группы «note» не найдено соответствующего тега <references group="note"/>