Английская Википедия:Gowerton railway station
Шаблон:Short description Шаблон:Use dmy dates Шаблон:Use British English Шаблон:Infobox station Gowerton railway station (originally Gower Road and later Gowerton North) serves the village of Gowerton, Wales. It is located at street level at the end of Station Road in Gowerton, Шаблон:Convert from the zero point at Шаблон:Stnlnk, measured via Stroud.[1] The station is unmanned but has a ticket machine, shelters on each platform and live train running information displays.
Background
Gowerton station was opened as Gower Road by the South Wales Railway on Tuesday 1 August 1854.[2] It was later renamed Gowerton, following a request to the railway company by the parish vestry, and from 1950 became known as Gowerton North to distinguish it from the Gowerton South railway station which served the now closed Pontarddulais to Swansea Victoria section of the Heart of Wales Line until 1964.[3]Шаблон:Page needed
History
The station originally had two platforms, sited on the section between Cockett station and Duffryn, but the track was singled in 1986 as an economy measure. Network Rail planned to re-double the section of railway through this station and re-instate the disused east-bound platform in May 2012. Work commenced in March 2013 and was completed a month later.[4][5]
This has increased the capacity of this section of line and allowed more trains to stop at this station.[6] The re-doubling work was completed in July 2013 with the disused platform brought back into use. This resulted in an additional 95 services stopping at Gowerton every week[7] and this has also helped to increase passenger usage at the station, which has risen by 2,100% since 1998.[8]
Services
Gowerton is served approximately every hour by Transport for Wales services heading westbound towards Llanelli, where they continue to either West Wales or to Shrewsbury via the Heart of Wales line; and eastbound towards Шаблон:Rws, with many continuing further east to Шаблон:Rws, Шаблон:Rws and Manchester Piccadilly.[9] The station was originally a request stop, but on 9 September 2013, it was no longer listed as one.
Future services
In December 2022, the ORR approved Grand Union to commence a new service from Paddington to Carmarthen in partnership with Spanish rail operator Renfe, for which a fleet of new bi-mode trains will be used. The new service is scheduled to commence in December 2024.[10] The service will call at Bristol Parkway, Severn Tunnel Junction, Newport, Cardiff Central, Gowerton and Llanelli en-route to Carmarthen.[11]
Шаблон:Rail start Шаблон:Rail line Шаблон:Rail line Шаблон:S-note Шаблон:Rail line Шаблон:S-end
References
External links
Шаблон:Commons category Шаблон:Stn art lnk
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite magazine Article cites a contemporary report in The Cambrian newspaper.
- ↑ Шаблон:Cite book
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite news
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite web
- ↑ Шаблон:Cite magazine
- ↑ Шаблон:NRtimes
- ↑ Шаблон:Cite web
- ↑ ORR approves Grand Union London - Carmarthern trains Rail issue 972 14 December 2022 page 17
- Английская Википедия
- Страницы с неработающими файловыми ссылками
- Railway stations in Swansea
- DfT Category F2 stations
- Former Great Western Railway stations
- Railway stations in Great Britain opened in 1852
- Railway stations served by Transport for Wales Rail
- 1852 establishments in Wales
- Страницы, где используется шаблон "Навигационная таблица/Телепорт"
- Страницы с телепортом
- Википедия
- Статья из Википедии
- Статья из Английской Википедии