Английская Википедия:Great Falls Dam (Tennessee)

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Use mdy dates Шаблон:Infobox NRHPШаблон:Short description Great Falls Dam is a hydroelectric dam on the Caney Fork, straddling the county line between White County and Warren County in the U.S. state of Tennessee. It is the only dam outside the Tennessee River watershed owned and operated by the Tennessee Valley Authority. The dam impounds the Шаблон:Convert Great Falls Lake, and its tailwaters feed into Center Hill Lake.[1] The completion of Great Falls Dam in late 1916 was an engineering triumph, marking the first successful attempt to impound the volatile and flood-prone Caney Fork. The dam is also notable for its design, utilizing a mostly underground conduit to carry water from the reservoir via a tributary to the Power House Шаблон:Convert downstream from the dam.[2][3]

Great Falls Dam is named for the rapids and waterfalls on the Caney Fork downstream from the dam. The section of river below the powerhouse is world-renowned for whitewater kayaking. The dam and its tailwaters are surrounded by Rock Island State Park.[1]

Location

Great Falls Dam is located approximately Шаблон:Convert above the mouth of the Caney Fork, immediately downstream from the Caney Fork's confluence with the Collins River. The confluence of these two rivers (the Collins flowing from the southwest and the Caney Fork from the east) creates a peninsula. The two rivers nearly meet at the Narrows, a "land bridge" connecting the peninsula to the mainland. Two tunnels measuring approximately Шаблон:Convert each deliver water from the Collins River section of the Great Falls Reservoir underneath Highway 287 at the Narrows to the dam's powerhouse located on the Caney Fork Шаблон:Convert downstream from the dam.

Great Falls Reservoir stretches behind the dam for Шаблон:Convert along the Caney Fork and for roughly Шаблон:Convert along the lower Collins River. The lake also includes a small stretch of the lower Rocky River, which empties into the Caney Fork about a mile east of the dam.

Capacity

Great Falls Dam is a concrete gravity diversion type dam Шаблон:Convert high and Шаблон:Convert long, and has a generating capacity of 33,800 kilowatts (33.8 MW).[1] The dam's spillway has 18 gates with a combined discharge of Шаблон:Convert per second.[2][4] Great Falls Reservoir has approximately Шаблон:Convert of flood storage, Шаблон:Convert of shoreline, and Шаблон:Convert of water surface.[1][4]

History

Файл:Great-falls-dam-tennessee-construction2.jpg
Construction work at the Great Falls Dam site, showing the entrance to the dam's diversion tunnel and part of a cofferdam

Throughout the 19th century, many attempts were made to harness the extraordinary hydro power potential of the Caney Fork only to be defeated by one of the volatile river's disastrous floods. The first major establishment to utilize the river's power at Great Falls was the Bosson Mill, a gristmill and carding factory that operated at the site across the river from the powerhouse from the 1860s until its destruction by a flood in 1882.[5] The most prominent venture at Great Falls Gorge was the Falls City Cotton Mill Company, which established a cotton mill and company town, Falls City, just above the gorge in 1892. The company turned a moderate profit until 1902, when the Good Friday Flood destroyed its toll bridge and powerhouse, and the mill was forced to close (the mill and the town's "spring castle" are still standing, however).[6]

By 1900, the rise of major industry in Nashville brought an increased demand for electricity. In 1901, Nashville entrepreneur Arthur Dyer formed the Great Falls Power Company and purchased land on the north side of the gorge with plans to build a dam. Dyer had trouble getting financing for the project, however, and in 1912 sold Great Falls Power to the Tennessee Power Company. The original plans called for a dam Шаблон:Convert high. At the Narrows, where the two tunnels are now located, an open channel was to be made from the Collins River to the Caney Fork. The water was to be carried across the gorge in a steel flume and then in an open canal across Horseshoe Bend, a distance of Шаблон:Convert. The powerhouse was to be located at least Шаблон:Convert by river below the present powerhouse. In so doing a total head of Шаблон:Convert would have been available; Шаблон:Convert at the dam, Шаблон:Convert between the dam and the present powerhouse and Шаблон:Convert around horseshoe bend.[7]

Файл:Great-falls-dam-tennessee-construction3.jpg
Construction of the dam's diversion tunnel

With financing from Chicago business interests, Tennessee Power began construction work on the dam's foundation. Within a month, however, the Caney Fork burst its banks again, flooding out the project's excavation work and destroying its cofferdams. Tennessee Power struggled with finances but was able to resume construction in 1915, and by late 1916 the Шаблон:Convert high dam had been completed. The plant went into operation on January 1, 1917.[7]

In 1922, the Tennessee Power Company merged with several other entities to form the Tennessee Electric Power Company (TEPCO). TEPCO tripled the capacity of Great Falls Dam by raising the dam Шаблон:Convert and installing a second generator at the powerhouse downstream. The dam faced its first major test in March 1929, when several cloudbursts atop the Cumberland Plateau caused the Caney Fork to expand to record flood volumes, sending wreckage and uprooted trees crashing into the dam. The Great Falls Power House was flooded and a substation was destroyed, but the dam held.[7]

The passage of the TVA Act in 1933 gave the Tennessee Valley Authority oversight of flood control operations in the Tennessee River watershed, where most of TEPCO's dams were located. Jo Conn Guild, the head of TEPCO, vehemently opposed TVA and challenged the constitutionality of the TVA Act in federal court. After the U.S. Supreme Court upheld the act, however, TEPCO was forced under eminent domain to sell its assets to TVA for $78 million. This sum included $3.5 million for Great Falls Dam.[2]

After its acquisition, TVA began making improvements to Great Falls Dam. By 1946, grouting work had repaired much of the leakage through the cliffside, which had been an issue since the dam's creation. TVA also built a new switchyard and control building.[2] In the late 1960s, the agency leased part of the Great Falls reservation to the state for the development of Rock Island State Park, which opened in 1969.[8]

References

Шаблон:Reflist

External links

Шаблон:Stack Шаблон:Commons category

Шаблон:Tennessee Valley Authority Facilities

  1. 1,0 1,1 1,2 1,3 Tennessee Valley Authority, Great Falls Reservoir. Retrieved: January 29, 2009.
  2. 2,0 2,1 2,2 2,3 Tennessee Valley Authority, Design of TVA Projects Volume 3: Mechanical Design of Hydro Plants, Technical Report No. 24 (Washington, D.C.: Tennessee Valley Authority, 1952), pp. 301-302.
  3. Distance measured from Шаблон:Cite map and Шаблон:Cite map
  4. 4,0 4,1 Tennessee Valley Authority, The Nickajack Project: A Report on the Planning, Design, Construction, Initial Operations, and Costs, Technical Report No. 16 (Knoxville, Tenn.: Tennessee Valley Authority, 1972), pp. 10-11.
  5. Шаблон:Cite book
  6. Шаблон:Cite book
  7. 7,0 7,1 7,2 Шаблон:Cite book
  8. Tennessee State Parks, Rock Island State Park official park brochure. Retrieved: January 29, 2009. PDF.