Английская Википедия:Great St Bernard Tunnel

Материал из Онлайн справочника
Перейти к навигацииПерейти к поиску

Шаблон:Short description Шаблон:Infobox tunnel Шаблон:Location map Шаблон:Location map

The Great St Bernard Tunnel (Шаблон:Lang-fr, Шаблон:Lang-it, Шаблон:Lang-de) is a road tunnel complementing the Great St Bernard Pass, linking Martigny (in the Swiss canton of Valais) with Saint-Rhémy-en-Bosses (in the Aosta Valley, in north western Italy).

Description

There is a toll to use the tunnel, payable in full even for drivers who already display on their vehicles a Swiss motorway vignette. The tunnel comprises a section of the E27 route linking Belfort with Aosta.

For most of its Шаблон:Convert length the tunnel runs in a straight line, but incorporating a gentle slope. The northern end is Шаблон:Convert above sea level while the southern end is only Шаблон:Convert above sea level. At both ends, the approach road to the tunnel is covered by a gallery / avalanche shelter in order to minimize the risk of access to the tunnel being temporarily blocked during bad weather. Any frontier formalities are handled at the tunnel's north end, although the actual national frontier is around Шаблон:Convert from the Swiss tunnel entrance and Шаблон:Convert from the Italian entrance. Note that the Swiss manage Шаблон:Convert of tunnel, while Italians Шаблон:Convert, so the border between the two operating entities does not lie at the state border, but around one kilometre on the Swiss side.

The name of the tunnel comes directly from that of the Grand St Bernard Pass, and thereby indirectly from the saint who in AD 1049 founded the hospice high above the tunnel, that also bears his name. Tourists on the Swiss side additionally find themselves reminded by road side billboards of the saint's association with St Bernard dogs.

The Rhône Pipeline has carried oil through the tunnel since 1966.

Toll charges

Шаблон:Updated[1]

Vehicle class One way ReturnШаблон:Efn 10 crossingsШаблон:Efn 20 crossingsШаблон:Efn
A1Шаблон:Efn €16.50
CHF 17.50
€22.10
CHF 23.50
€112
CHF 118.50
€150
CHF 159
A2Шаблон:Efn €27.80
CHF 29.50
€44.60
CHF 47.30
B1Шаблон:Efn €43.40
CHF 46
€69.30
CHF 73.50
€260.50
CHF 276
€346
CHF 367
B2Шаблон:Efn €75.50
CHF 80
€122
CHF 129.50
€563
CHF 597
€981
CHF 1,040
B3Шаблон:Efn
3AШаблон:Efn €110
CHF 116.50
€176
CHF 186.50
€825
CHF 874
€1,424
CHF 1,510
3BШаблон:Efn
4Шаблон:Efn €167
CHF 177
€266
CHF 282
€1,257
CHF 1,333
€2,153
CHF 2,282

History

Before the tunnel was constructed, the frontier was passable here only using the Great St Bernard Pass. The pass remains an option in summer, but is normally closed by snow between October and May, and sometimes for longer. The tunnel is intended to be usable for 365 days every year.

The tunnel was opened to traffic on 19 March 1964, having been under construction since 1958. It became the longest road tunnel in the world, surpassing the Vielha tunnel in the Pyrenees in Spain which was opened in 1948.

The approach roads have been progressively improved, and most recently the avalanche covers extended on the southern side. The Mont Blanc tunnel tragedy of 1999 prompted a major review of road tunnel safety in several countries including Switzerland, and significant safety upgrades are planned for the Grand St Bernard Tunnel. A speed limit of 80 km/h (50 mph) is already in force inside the tunnel.

Access and popularity

The tunnel and most of the connecting road between Aosta and Martigny are only single carriageway roads, and for most relevant city destinations in Switzerland and Italy the toll free St Gotthard Tunnel and Simplon Pass offer more direct or at least faster routes. This and the toll ensure that the Grand San Bernard Tunnel rarely suffers from the levels of holiday season congestion that plague the more popular Alpine crossing routes.

Notes

Шаблон:Notelist Шаблон:Reflist

References

Шаблон:Reflist

External links

Шаблон:Commons category

Шаблон:S-start Шаблон:S-ach Шаблон:S-bef Шаблон:S-ttl Шаблон:S-aft Шаблон:S-end

Шаблон:Autostrade Шаблон:Authority control