Английская Википедия:Green Line (Delhi Metro)
Шаблон:Short description Шаблон:More citations needed Шаблон:Use Indian English Шаблон:Use dmy dates Шаблон:Infobox rail line
The Green Line (Line 5) is a metro rail line of the Delhi Metro, a rapid transit system in Delhi, India. The line consists of 24 stations covering a total length of 28.79 km. It runs between Inderlok and Brigadier Hoshiyar Singh with a branch line connecting the line's Ashok Park Main station with Kirti Nagar station.[1]
It is a completely elevated line and runs mostly along the busy NH 9 route in North Delhi and North West Delhi, bypassing Tikri Border to enter Bahadurgarh. It is the first Delhi metro line on standard gauge, as opposed to Шаблон:Track gauge broad gauge, prevalent in Red, Yellow and Blue Lines.
History
The line was opened in two stages, with the 15.1 km Inderlok – Mundka section opening on 3 April 2010[2] and the 3.5 km Kirti Nagar – Ashok Park Main branch line on 27 August 2011. Though its route is shorter than other lines, the Green Line serves as a lifeline for Delhiites connecting to the Red and Blue Lines, as it covers major commercial and residential areas like Punjabi Bagh, Paschim Vihar, Nangloi and Mundka.
On 6 August 2012, in a step that will improve commuting in National Capital Region, the Union government approved the extension of Delhi Metro from Mundka to Bahadurgarh in Haryana. The 11.18 km metro stretch comprises seven stations with four of them in Delhi and the remaining three in Bahadurgarh -- Mundka Industrial Area, Ghevra, Tikri Kalan, Tikri Border, Pandit Shree Ram Sharma (Modern Industrial Estate), Bahadurgarh City (Bus Stand) and Brigadier Hoshiar Singh (City Park).
Construction work of this extension began in 2013 and was completed by the second half of 2018, as part of the Phase III expansion. Prime Minister Narendra Modi inaugurated the Mundka – Bahadurgarh stretch via video conferencing on 24 June 2018.
In late October 2019, it was decided to construct steel platforms on the viaduct of Green Line between Punjabi Bagh and Shivaji Park stations that will provide a seamless interchange between Green Line and Pink Line.[3] Construction began in that year itself and the new halt platform of Green Line, named Punjabi Bagh West, was thrown open to the public on 29 March 2022, after multiple delays.[4]
The new halt platform of Green Line is connected by a Foot Over Bridge (FOB), which links with the Punjabi Bagh West station of the Pink Line. The FOB is 212 metres long. The new platforms are 155 metres in length and are connected with the FOB by two extra-large lifts on each platform with a capacity of 26 passengers each as well as staircases.[4]
Stations
Main Line
align="center" style="background:#Шаблон:Rail color;" colspan="8" |Green Line | |||||||
---|---|---|---|---|---|---|---|
# | Station Name | Opening | Interchange Connection | Station Layout | Depot Connection | Depot Layout | |
English | Hindi | ||||||
1 | Шаблон:Stl | इंद्रलोक | 3 April 2010 | Шаблон:Rcb | Elevated | None | None |
2 | Шаблон:Stl | अशोक पार्क मेन | 3 April 2010 | Шаблон:Rcb | Elevated | None | None |
3 | Шаблон:Stl | पंजाबी बाग़ पूर्व | 3 April 2010 | None | Elevated | None | None |
4 | Шаблон:Stl | पंजाबी बाग़ पश्चिम | 29 March 2022 | Шаблон:Rcb | Elevated | None | None |
5 | Шаблон:Stl | शिवाजी पार्क | 3 April 2010 | None | Elevated | None | None |
6 | Шаблон:Stl | मादीपुर | 3 April 2010[5] | None | Elevated | None | None |
7 | Шаблон:Stl | पश्चिम विहार पूर्व | 3 April 2010 | None | Elevated | None | None |
8 | Шаблон:Stl | पश्चिम विहार पश्चिम | 3 April 2010 | None | Elevated | None | None |
9 | Шаблон:Stl | पीरागढ़ी | 3 April 2010 | Шаблон:Rcb (Phase 4 - Under Construction) |
Elevated | None | None |
10 | Шаблон:Stl | उद्योग नगर | 3 April 2010 | None | Elevated | None | None |
11 | Шаблон:Stl | महाराजा सूरजमल स्टेडियम | 3 April 2010 | None | Elevated | None | None |
12 | Шаблон:Stl | नांगलोई | 3 April 2010 | None | Elevated | None | None |
13 | Шаблон:Stl | नांगलोई रेलवे स्टेशन | 3 April 2010 | Nangloi railway station | Elevated | None | None |
14 | Шаблон:Stl | राजधानी पार्क | 3 April 2010 | None | Elevated | None | None |
15 | Шаблон:Stl | मुण्डका | 3 April 2010 | None | Elevated | Mundka Depot | At Grade |
16 | Mundka Industrial Area (MIA) | मुण्डका औद्योगिक क्षेत्र | 24 June 2018 | None | Elevated | None | None |
17 | Шаблон:Stl | घेवरा | 24 June 2018 | None | Elevated | None | None |
18 | Шаблон:Stl | टीकरी कलाँ | 24 June 2018 | None | Elevated | None | None |
19 | Шаблон:Stl | टीकरी बॉर्डर | 24 June 2018 | None | Elevated | None | None |
20 | Шаблон:Stl (Modern Industrial Estate) |
पंडित श्री राम शर्मा (मॉर्डन इंडस्ट्रियल एस्टेट) |
24 June 2018 | None | Elevated | Modern Industrial Estate (MIE) Depot | At Grade |
21 | Шаблон:Stl (Bus Stand) |
बहादुरगढ़ सिटी (बस स्टैंड) |
24 June 2018 | None | Elevated | None | None |
22 | Шаблон:Stl (Bahadurgarh City Park) |
ब्रिगेडियर होशियार सिंह (बहादुरगढ़ सिटी पार्क) |
24 June 2018 | None | Elevated | None | None |
Branch Line
style="background:#Шаблон:Rail color;" colspan="8" | Green Line Branch | |||||||
---|---|---|---|---|---|---|---|
# | Station Name | Opening | Interchange Connection | Station Layout | Depot Connection | Depot Layout | |
English | Hindi | ||||||
1 | Шаблон:Stl* | अशोक पार्क मेन | 3 April 2010 | Шаблон:Rcb | Elevated | None | None |
2 | Шаблон:Stl | सतगुरु राम सिंह मार्ग | 27 August 2011 | None | Elevated | None | None |
3 | Шаблон:Stl | कीर्ति नगर | 27 August 2011 | Шаблон:Rcb | At Grade | None | None |
Train Info
style="background:#Шаблон:Rail color;" colspan="4" |Green Line | |||
---|---|---|---|
Rakes | Mitsubishi | Hyundai Rotem | BEML |
Train Length | 4 | ||
Train Gauge | 4 ft Шаблон:Frac in (1,435 mm) standard gauge | ||
Electrification | 25 kV, 50 Hz AC through overhead catenary OHE | ||
Train's Maximum Speed | 100 km/h | ||
Train Operation | Delhi Metro |
Infrastructure
Green Line is equipped with Bombardier Cityflo 350 signalling.[2]
Rolling stock
The Green Line uses standard gauge trains manufactured by a consortium of Mitsubishi, Hyundai Rotem and Bharat Earth Movers (BEML). A total of 196 cars for the Green Line and the Violet Line were ordered for both 4-car configurations (46 trains) and 6-car configurations (2 trains). One train was manufactured in Changwon in South Korea and rest of the trains were manufactured at BEML's facility in Bangalore. Width of these trains is 2.9 meters as compared to 3.2 meters on broad gauge trains.[6]
See also
- Transport in Delhi
- Delhi Suburban Railway
- National Capital Region Transport Corporation
- Rapid transit in India
- List of rapid transit systems
- List of metro systems
References
External links
Шаблон:Delhi Metro Шаблон:Delhi & NCR Metro stations Шаблон:Rapid transit in India Шаблон:Rapid transit in Asia Шаблон:Railways in Northern India