Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The Шаблон:Cvt line connects Nagasandra in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yeshwanthpur in the north with the central hub of Majestic and the southern residential areas of Bangalore (Basavanagudi, Jayanagar, Banshankari , Thalaghattapura, Kanakapura Road etc.). Green Line is mostly elevated, with 26 elevated and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines.

Once Phase II is completed, the line will stretch from Madavara in northwest to Silk Institute in the South. The length of the line will increase to Шаблон:Convert.

History

Green Line sections were opened as indicated below.[1]

colspan="6" style="background:#Шаблон:Rcr;" | History
Name Extension date Terminals Length Stations
Reach 3C Estimated July 2024[2] Madavara Nagasandra Шаблон:Cvt[3] 3
Reach 3B 1 May 2015 Nagasandra Peenya Industry Шаблон:Cvt 3
Reach 3A 1 March 2014 Peenya Industry Yeshwanthpura Шаблон:Cvt 3
Reach 3 1 March 2014 Yeshwanthpura Sampige Road Шаблон:Cvt 7
UG 2 18 June 2017[4] Sampige Road National College Шаблон:Cvt[5] 3
Reach 4 18 June 2017[4] National College Rashtreeya Vidyalaya Road Шаблон:Cvt 5
Reach 4A 18 June 2017[4] Rashtreeya Vidyalaya Road Yelachenahalli Шаблон:Cvt 3
Reach 4B 15 January 2021[2] Yelachenahalli Silk Institute Шаблон:Cvt[3] 5
Total Madavara Silk Institute Шаблон:Cvt 32
Файл:NammaMetro-GreenLine.jpg

Phase I

Construction work on Reach 3 and 3A of Phase I of the Namma Metro began in 2009–10. The total cost of the project on this stretch was Шаблон:INR2,100 crore.[6] Work on the underground section commenced in May 2011. TBMs named Kaveri, Krishna and Godavari were used for tunnel boring work for the Green Line.[7][8][9][10][11][12] The first trial run on the Green Line was conducted on 8 August 2013.[13]

Construction required 1.3 lakh tonnes of concrete, Шаблон:Convert of steel bars, and Шаблон:Cvt of high tension wires weighing Шаблон:Convert. A total of 395 piers, including station piers and portals, were constructed on the stretch. The tallest pier of the viaduct is a Шаблон:Convert pier between Kuvempu Road and Sriramapura stations, opposite Gayatri Devi Park. There 353 spans on the stretch, the longest being the Шаблон:Convert curved span over the railway track off Sriramapura. The total roofing area of the 10 stations on the stretch was Шаблон:Convert.[14][15]

The first section of Green Line was opened to public on 1 March 2014.[16] BMRCL Managing Director Pradeep Singh Kharola stated that about 25,000 passengers traveled on the line on the opening day.[17] In the first month of operations, 7.62 lakh people at an average of 24,605 people daily used the Green Line, generating a revenue of Шаблон:INRConvert.[18]

TBM Godavari began drilling the Шаблон:Convert underground section between Sampige Road and Majestic stations in April 2014. Godavari broke down a few months later, and needed to have its cutter head replaced. The machine broke down due to tough terrain including hard rock and boulders. The cutter head had to be imported from Italy. The machine restarted work in September 2015. Godavari completed drilling and emerged on the Majestic station end of the tunnel on 19 April 2016.[19][20] Meanwhile, Kaveri and Krishna continued drilling the underground section between National College and Nadaprabhu Kempegowda station.

Construction of the underground section of Green Line required the use of 3,000 transit mixer loads of concrete. Шаблон:Cvt of cable had to be laid.[21]

Trial runs on the elevated section between National College and Yelachenahalli began on 23 November 2016. Trials were conducted between National College and Jayanagara initially at a speed of Шаблон:Cvt, and then along the entire elevated section between National College and Yelachenahalli at a speed of Шаблон:Cvt.[22] Trial runs began in the tunneled section on 30 March 2017.

Services at Sampige Road, Srirampura and Kuvempu Road stations were suspended between 13 and 22 March 2017 to allow authorities to conduct static and other tests and to link Sampige Road station with Nadaprabhu Kempegowda station. During the 10-day testing period, services operated only between Nagasandra and Rajajinagar stations. The BMTC introduced special feeder bus services to transport passengers from Rajajinagara to Hosahalli.[23][24] Services between Sampige Road and Rajajinagara were suspended again for four days beginning 13 April 2017 to conduct trial runs on the underground section between Sampige Road and National College.[25][26] Trial runs were completed on 16 May 2017.[27]

Phase II

Contract for construction of the 6.5 km Reach 4B from Yelachenahalli to Silk Institute (previously named Anjanapura) was awarded to Nagarjuna Construction Co. The extension was estimated to cost Шаблон:INRConvert.[28] Civil work on the extension began in October 2016[29] and was completed by 2020. Trial runs were conducted on 18–19 December 2020[30] following which the extension was inaugurated on 14 January 2021,[31] making it the first section of Phase II to start commercial operations.

In October 2016, BMRCL invited bids for the construction of viaduct and stations on the 3.031 km extension (Reach 3C) of the Green Line from Nagasandra to Madavara (previously named Bengaluru International Exhibition Centre).[29] Reach 3C was awarded to Simplex Infrastructure Limited in late February 2017. The contract specified a cost of Шаблон:INRConvert and a deadline for completion of 27 months.[28][32] The start of construction on the extension was delayed by 4 months due to land acquisition issues concerning land near Jindal Aluminium Limited in Kirloskar Layout. The issues were resolved and construction began in June 2017.[33] Construction work on Reach 3C is expected to be ready by June–August 2022.[34]

Stations

Шаблон:Main There will be 32 stations on the Green Line. Of these, 29 are currently operational. Each station has around 60 surveillance cameras. Passenger lifts and escalators are provided at all stations.

align="center" colspan="7" style="background:#Шаблон:Rcr;"| Green Line
# Station Name Opening Connections/Transits/Terminals Layout Coordinates
English Kannada
1 Шаблон:Stl ಮಾದಾವರ July 2024 [35] Elevated
2 Шаблон:Stl

ಚಿಕ್ಕಬಿದರಕಲ್ಲು

July 2024 [35] Elevated
3 Шаблон:Stl ಮಂಜುನಾಥನಗರ July 2024 [35] Elevated
4 Nagasandra ನಾಗಸಂದ್ರ 1 May 2015 Elevated
5 Dasarahalli ದಾಸರಹಳ್ಳಿ 1 May 2015 Elevated
6 Jalahalli ಜಾಲಹಳ್ಳಿ 1 May 2015 Шаблон:Rint Basaveshwara Bus Station Elevated
7 Peenya Industry ಪೀಣ್ಯ ಇಂಡಸ್ಟ್ರಿ 1 March 2014 Elevated
8 Peenya ಪೀಣ್ಯ 1 March 2014 Elevated
9 Goraguntepalya ಗೊರಗುಂಟೆಪಾಳ್ಯ 1 March 2014 Шаблон:Rint Шаблон:Rcb (Planned, Phase lll) Elevated
10 Yeshwanthpur ಯಶವಂತಪುರ 1 March 2014 Шаблон:Rint Шаблон:Stnlnk Elevated
11 Sandal Soap Factory ಸ್ಯಾಂಡಲ್ ಸೋಪ್ ಫ್ಯಾಕ್ಟರಿ 1 March 2014 Шаблон:Rint Yeshwanthpur TTMC Elevated
12 Mahalakshmi ಮಹಾಲಕ್ಷ್ಮೀ 1 March 2014 Elevated
13 Rajajinagara ರಾಜಾಜಿನಗರ 1 March 2014 Elevated
14 Mahakavi Kuvempu Road ಮಹಾಕವಿ ಕುವೆಂಪು ರಸ್ತೆ 1 March 2014 Elevated
15 Srirampura ಶ್ರೀರಾಮ್ ಪುರ 1 March 2014 Elevated
16 Mantri Square Sampige Road ಮಂತ್ರಿ ಸ್ಕ್ವೇರ್ ಸಂಪಿಗೆ ರಸ್ತೆ 1 March 2014 Шаблон:Rint Srirampura (Planned Suburban Rail Station) Elevated
17 Nadaprabhu Kempegowda station, Majestic ನಾಡಪ್ರಭು ಕೆಂಪೇಗೌಡ ನಿಲ್ದಾಣ, ಮೆಜೆಸ್ಟಿಕ್ 18 June 2017 Шаблон:Rint Шаблон:Rcb

Шаблон:Rint KSR Bangalore City Jn

Шаблон:Rint Kempegowda Bus Station

Underground
18 Chikkapete ಚಿಕ್ಕಪೇಟೆ 18 June 2017 Underground
19 Krishna Rajendra Market ಕೃಷ್ಣ ರಾಜೇಂದ್ರ ಮಾರುಕಟ್ಟೆ 18 June 2017 Underground
20 National College ನ್ಯಾಷನಲ್ ಕಾಲೇಜ್ 18 June 2017 Elevated
21 Lalbagh ಲಾಲ್ಬಾಗ್ 18 June 2017 Elevated
22 South End Circle ಸೌತ್ ಎಂಡ್ ಸರ್ಕಲ್ 18 June 2017 Elevated
23 Jayanagara ಜಯನಗರ 18 June 2017 Шаблон:Rint Jayanagara TTMC Elevated
24 Rashtreeya Vidyalaya Road ರಾಷ್ಟ್ರೀಯ ವಿದ್ಯಾಲಯ ರಸ್ತೆ 18 June 2017 Шаблон:Rint Шаблон:Rcb (Under Construction) Elevated
25 Banashankari ಬನಶಂಕರಿ 18 June 2017 Шаблон:Rint Banashankari TTMC Elevated
26 Jayaprakash Nagara ಜಯಪ್ರಕಾಶ ನಗರ 18 June 2017 Шаблон:Rint Шаблон:Rcb (Planned, Phase lll) Elevated
27 Yelachenahalli ಯಲಚೇನಹಳ್ಳಿ 18 June 2017 Elevated
28 Шаблон:Stl ಕೋಣನಕುಂಟೆ ಕ್ರಾಸ್ 15 January 2021 Elevated
29 Шаблон:Stl ದೊಡ್ಡಕಲ್ಲಸಂದ್ರ 15 January 2021 Elevated
30 Шаблон:Stl ವಾಜರಹಳ್ಳಿ 15 January 2021 Elevated
31 Thalaghattapura ತಲಘಟ್ಟಪುರ 15 January 2021 Elevated
32 Шаблон:Stl ರೇಷ್ಮೆ ಸಂಸ್ಥೆ 15 January 2021 Elevated

Infrastructure

Rolling stock

BMRC procured 150 metro coaches for fifty 3-car train sets in DMC-TC-DMC formation for Phase l of Namma Metro from BEML-Hyundai Rotem at a cost of Rs 1,672.50 crore (Rs 16.72 billion). Coach specifications were as follows. Dimensions: Length-20.8m, Width-2.88m, and Height-3.8m. Each coach has a seating capacity of about 50 and standing capacity of 306 (basis 8 per sqm). Thus, each train had a capacity of about 1000. Traction was through four 180 kW motors in each motor coach. The trains have a maximum speed of 80 km/h and axle load of 15 tonnes. The trains operate on 750V DC with third rail bottom power collector system. Features include stainless steel body fully air-conditioned coaches, longitudinal bank of wide seats, wide vestibules between coaches, non-skid and non-slip floor surfaces, wi-fi enabled, four wide passenger access doors on each side, wide windows, automatic voice announcement system and electronic information and destination display system.

Initial operations on the Green Line began with twenty-one 3-coach trains. As loads increased with increasing ridership, all trains were converted to six coaches. Rolling stock on the Green Line are silver with a streak of bright green along its length.[36]

Power

Power is supplied to the Green Line from the Peenya sub-station of the Karnataka Power Transmission Corporation Ltd. (KPTCL).[37][38]

Signaling

In September 2009, the consortium led by Alstom Project India Limited were awarded a contract worth ₹563.4 crore (US$79.0 million) to supply control and signalling system for the first phase of the project. The consortium is led by Alstom and composed of Alstom Transport SA, Thales Group Portugal S A and Sumitomo Corporation. Alstom will provide the design, manufacture, supply, installing, testing and commissioning of the train control and signalling system and Thales will provide the design, installing, testing and commissioning of the telecommunication system for Phase I of the metro system. It includes the Urbalis 200 Automatic Train Control system which will ensure optimal safety, flexible operations and heightened passenger comfort.

The integrated control centre at Baiyyappanahalli has direct communication with trains and stations are CCTV fitted with visual and audio service information.

Operations

Frequency and capacity

Trains initially operated on the Green Line from 6 am to 11 pm. This was extended from 5AM to 11PM from 1 December 2015. The frequency along the line was 15 minutes between 5AM and 8AM and 8PM and 11PM, and 10 minutes between 8AM and 8PM.[39] Trains halt for 30 seconds at each station.[40] The 24.2 km journey is usually covered in about 42 minutes. Each six-coach train has a capacity of 2,004 passengers.[14]