The Green Line Branch (Line 11) is an approved line of the Delhi Metro. It will provide improved connections to northern, north-western and central Delhi with eastern, south-eastern Delhi and Noida, to decrease the increasing traffic, congestion and pollution on roads. It will act as a link line, by joining seven lines–Red, Green, Magenta, Yellow, Orange, Violet and Blue lines with each other. It will start from Inderlok and end in Indraprastha. It will be Шаблон:Cvt-long with eleven stations, out of which six will be underground and five wil be elevated. Construction is expected to begin in 2024, as part of the fourth phase of the Delhi Metro's development, and is slated to be completed by 2029.[1][2][3]

History

The Green Line Branch was conceptualized by the Delhi Metro Rail Corporation (DMRC) under the Phase IV of Delhi Metro's future expansion and development in July 2016. As per the plan, six new lines covering a length of about Шаблон:Cvt have been planned to be added to the metro network, out of which the Green Line Branch will connect Inderlok with Indraprastha, at a length of Шаблон:Cvt. The plans were finalized for implementation by the Government of Delhi in December 2018.[4] In March 2019, the plans were approved for construction by the Government of India. Thus, land acquisition for Phase IV and Green Line Branch began from April 2019, and was completed in three years. Construction was supposed to begin from 2021, but was delayed due to the restrictions imposed by the government due to the COVID-19 pandemic.[5] It was expected to be completed by 2024/25, which has been extended to 2029, as of February 2024.[3]

Stations

Шаблон:Main The stations proposed for the Green Line Branch are:[2]

style="background:#Шаблон:Rail color;" colspan="10" | Green Line Branch
No. Station Name Phase Opening Interchange Connection Station Layout Platform Level Type Depot Connection Depot Layout
English Hindi
1 Inderlok इंद्रलोक 4 2029 Шаблон:Rcb
Шаблон:Rcb
2 Daya Basti दया बस्ती 4 2029
3 Anand Parbat 4 2029
4 Ajmal Khan Park अजमल ख़ान पार्क 4 2029
5 Nabi Karim नबी करीम 4 2029 Шаблон:Rcb
(Phase 4 - Under Construction)
6 New Delhi नई दिल्ली 4 2029 Шаблон:Rcb
Шаблон:Rcb
7 Zakir Hussain College 4 2029
8 Delhi Gate दिल्ली गेट 4 2029 Шаблон:Rcb
9 Raj Ghat 4 2029
10 Indira Gandhi Stadium इंदिरा गांधी स्टेडियम 4 2029
11 Indraprastha इंद्रप्रस्थ 4 2029 Шаблон:Rcb

Project timeline

  • March 2019: Both the Phase IV and the Green Line Branch were approved by the Government of India.
  • April 2019: Land acquisition begins for the Green Line Branch.
  • February 2024: The line is expected to be completed by 2029. Construction is expected to begin from 2024.[5][3]

Train info

colspan="2" style="background:#Шаблон:Rcr;" |Indigo Line
Rakes TBD
Train Length TBD
Train Gauge Шаблон:Track gauge broad gauge
Electrification 25 kV 50 Hz AC through overhead catenary (OHE)
Train's Maximum Speed TBD
Train Operation Delhi Metro

See also

References

Шаблон:Reflist

Шаблон:Portal bar

  1. Ошибка цитирования Неверный тег <ref>; для сносок MRN не указан текст
  2. 2,0 2,1 Шаблон:Cite web
  3. 3,0 3,1 3,2 3,3 Шаблон:Cite web
  4. 4,0 4,1 Шаблон:Cite news
  5. 5,0 5,1 Шаблон:Cite web